ML121000296

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation (ISFSI) & Humboldt Bay, Unit 3 and ISFSI Re Chief Nuclear Officer Contact Information
ML121000296
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 04/06/2012
From: Halpin E
Pacific Gas & Electric Co
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML121000296 (2)


Text

III Pacific Gas and

~&~ Electric Company Diablo Canyon Power Plant PO. Box 56 Avi la Beach, CA 93424 800.545.6000 April 6,2012 PG&E Letter DCL-12-037 PG&E Letter DIL-12-006 PG&E Letter HBL-12-009 PG&E Letter HIL-12-002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Diablo Canyon Independent Spent Fuel Storage Installation Docket No. 50-133, License No. DPR-7 Humboldt Bay Power Plant, Unit 3 Docket No. 72-27, Materials License No. SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation Chief Nuclear Officer Contact Information

Dear Commissioners and Staff:

The purpose of this letter is to inform you of my appointment as the Senior Vice President and Chief Nuclear Officer for Pacific Gas and Electric Company (PG&E) effective April 2, 2012. In this capacity, I am responsible for the continued safe, efficient, and reliable operation of the Diablo Canyon Nuclear Power Plant, the Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI), the Humboldt Bay ISFSI, and the decommissioning of Humboldt Bay Power Plant, Unit 3. Please submit NRC correspondence to me as follows:

US Mail: Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 56 Mail Code 104/6 Avila Beach, California 93424 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. Wolf Creek

III Document Control Desk PG&E Letter DCL-12-037

~&~ April 6, 2012 DiL-12-006 Page 2 HBL-12-009 HIL-12-002 Overnight: Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company 9 miles NW of Avila Beach Mail Code 104/6 Avila Beach, California 93424 Fax: 805-545-6445 If you have any questions or require additional information, please contact me at 805-545-41 00.

Sincerely,

/~~~-----

Edward D. Halpin Senior Vice President and Chief Nuclear Officer mlpy/4540 cc: William C. Allen, NRC Project Manager Elmo E. Collins, Regional Administrator, NRC Region IV John B. Hickman, NRC Project Manager Michael S. Peck, DCPP NRC Senior Resident Inspector Gerald A. Schlapper, NRC Region IV Inspector Joseph M. Sebrosky, NRC Project Manager Diablo Distribution Humboldt Distribution A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway. Comanche Peak. Diablo Canyon. Palo Verde. San Onofre. South Texas Project. Wolf Creek