UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 4, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
CONFIRMATION OF REVISION TO INITIAL OPERATOR LICENSE EXAMINATION: KEWAUNEE POWER STATION
Dear Mr. Heacock:
We have received your Letter 12-114, dated March 12, 2012, where you are requesting the initial May 2015 operator licensing examination at the Kewaunee Power Station be moved to August 2015.
In response, we have moved the initial operator licensing exam from the weeks of May 11 and 18, 2015, and rescheduled the examination for the weeks of August 3, and 10, 2015, at the Kewaunee Power Station. An on-site validation is scheduled for the week of July 13, 2015.
We understand that your staff will develop the examination. Because your corporate letter indicated that there were more than 12 candidates being considered for this examination, the examination was scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.
In accordance with 10 CFR 2.930 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRCs Agencywide
D. Heacock Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Caroline Tilton, Acting Branch Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:
Distribution via ListServ'
D. Heacock Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Caroline Tilton, Acting Chief Operations Branch Division of Reactor Safety Docket No. 50-305 License No. DPR-43 cc:
Distribution via ListServ' DISTRIBUTION:
Breeda Reilly RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRSIII\\DRS\\Work in Progress\\Ltr 040412 Kewaunee Exam Change 2015 KW.docx G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII N
NAME RKWalton:ls HPeterson DATE 04/04/12 04/04/12 OFFICIAL RECORD COPY