|
---|
Category:Legal-Pre-Filed Exhibits
MONTHYEARML16081A3252016-03-21021 March 2016 NRCR12001 - NRC Staff Prefiled Hearing Exhibit List (Revised) ML16078A4172016-03-18018 March 2016 ENTR20726 - Entergy Track 2 Exhibit List ML16078A4122016-03-18018 March 2016 NRC000236 - Crack Growth Rate Comparison - Eason Pathania Model to MRP Model- Excel Spreadsheet ML16078A4132016-03-18018 March 2016 NRCR11001 - Exhibt List NRC Staff Prefiled Hearing Exhibit List (Revised) ML15321A0352015-11-17017 November 2015 NYS000582 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15315A0132015-11-11011 November 2015 ENTR00726 - Track 2 Hearing Exhibit List ML15309A2212015-11-0505 November 2015 NRCR10001 - NRC Staff Track 2 Exhibit List ML15309A1712015-11-0505 November 2015 RIVR14001 - Riverkeeper Tailored Track 2 Exhibit List ML15309A1292015-11-0505 November 2015 ENT000726 - Entergy Track 2 Hearing Exhibit List ML15313A4602015-11-0404 November 2015 NYSR25001 - Corrected Page 24 to Exhibits List Relevant to Track 2 Contentions ML15309A1552015-11-0404 November 2015 NYSR25001 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15307A1152015-11-0303 November 2015 NYSR24001 - State of Ny Revised Hearing Exhibits List ML15307A8112015-11-0303 November 2015 NRC000230 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15302A4672015-10-29029 October 2015 ENTR16001 - Entergy Revised Exhibit List ML15252A4442015-09-0909 September 2015 NYS000563 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15252A5792015-09-0909 September 2015 NYS Updated Exhibit List ML15252A5752015-09-0909 September 2015 NYS000573 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15252A5112015-09-0909 September 2015 RIVR13001 - Riverkeeper Updated Exhibit List ML15252A5092015-09-0909 September 2015 RIV000164 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15252A5062015-09-0909 September 2015 NYS000570 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15252A5042015-09-0909 September 2015 NYS000568 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15252A4432015-09-0909 September 2015 NYS000566 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15261A8302015-09-0404 September 2015 ENTR00615 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15222A9152015-08-10010 August 2015 ENT000648 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (Undated) ML15222B1242015-08-10010 August 2015 ENT000680 - Curriculum Vitae of Barry M. Gordon ML15223A4542015-08-10010 August 2015 NRC000207 - Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) ML15223A6752015-08-10010 August 2015 NRC000227 - Gary Stevens Statement of Professional Qualifications ML15223A7792015-08-10010 August 2015 NRC000224 - IP3 FSAR Rev. 04 Chapter 16 ML15222B1692015-08-10010 August 2015 ENTR00031 - Curriculum Vitae of Alan B. Cox ML15222A8482015-08-10010 August 2015 ENT000637 - NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) ML15261A8342015-08-10010 August 2015 ENT000698 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15261A8322015-08-10010 August 2015 ENT000678 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, Reply to Request for Additional Information Regarding License Renewal Application (Nov. 28, 2007)Redacted ML15223A3452015-08-10010 August 2015 ENTR15001 - Entergy Hearing Exhibit List (Ent Exhibit List) ML15223A3932015-08-10010 August 2015 NRCR00104 - on Yee Statement of Professional Qualifications (Revised) ML15222B1262015-08-10010 August 2015 ENT000687 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15223A3862015-08-10010 August 2015 NRC000222 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15222B1612015-08-10010 August 2015 ENTR00186 - Curriculum Vitae of Mark A. Gray ML15223A3702015-08-10010 August 2015 NRC000220 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15223A8052015-08-10010 August 2015 NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15223A2722015-08-10010 August 2015 NRC000226 - Jeffrey C. Poehler Statement of Professional Qualifications ML15223A7872015-08-10010 August 2015 NRC000196 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15223A7832015-08-10010 August 2015 NRC000228 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15223A9452015-08-10010 August 2015 NRC000223 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15223A6122015-08-10010 August 2015 NRCR20101 - NRC Staff'S Revised Statement of Position Regarding NYS 26B/RK-TC-1B ML15223A4512015-08-10010 August 2015 NRC000206 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) ML15223A2692015-08-10010 August 2015 NRC000183 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15223A6712015-08-10010 August 2015 NRCR00147- NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15222B1702015-08-10010 August 2015 ENTR00184 - Curriculum Vitae of Jack R. Strosnider ML15223A7022015-08-10010 August 2015 NRCR900001 - NRC Staff Pre-filed Hearing Exhibit List (Revised) ML15223A7812015-08-10010 August 2015 NRC000226 - Jeffrey C. Poehler Statement of Professional Qualifications 2016-03-21
[Table view] |
Text
NRC000098 Submitted: March 30, 2012 January 4, 2005 MEMORANDUM TO: Luis A. Reyes Executive Director for Operations FROM: Annette L. Vietti-Cook, Secretary /RA/
SUBJECT:
STAFF REQUIREMENTS - SECY-04-0223 - REQUEST FOR APPROVAL OF STAFF COMMENTS ON THE 2005 RECOMMENDATIONS OF THE INTERNATIONAL COMMISSION ON RADIOLOGICAL PROTECTION The Commission has approved the staffs plans to transmit comments to the International Commission on Radiological Protection (ICRP) on the draft ICRP 2005 Recommendations, subject to the following comments and changes.
The Commission supports the staffs position that ICRP should delay finalizing the draft 2005 Recommendations to allow the foundation documents to be reviewed by the international community, and to permit consideration of the results of the BEIR VII study and the next UNSCEAR report. Also, the Commission agrees that it is not necessary to develop a framework for radiological protection of non-human species, and Section 11 and Appendix B of the draft recommendations should be removed. The staff should continue to express the Commissions concerns about developing standards for protection of flora and fauna to the ICRP and the IAEA in the appropriate forums.
There should be internal consistency within the ICRP document. For example, the inconsistencies in the document with some table values requiring regulatory action for material below the exemption value should be corrected.
Consistent with the path the NRC has taken in the ongoing rulemaking for controlling the disposition of solid materials, general comment number 7 should be revised to clearly indicate that the Commission supports the concept of exemption, and that there should be no regulatory requirements (e.g., optimization) from a radiological perspective for material with radioactivity below the exempt values. Additionally, there may be some levels above the exemption constraint where further optimization is not practical, and ICRP should provide some guidance in this area.
The staff should remain firm in its position in comment 14 that the ICRP should clearly describe the scientific basis for its decision to more emphatically endorse the linear, no-threshold dose-response model.
Specific comment number 46 should read that the value chosen for exemption should be at a level where no further regulatory controls or optimization is necessary from a radiological perspective. The document should be revised to eliminate any inconsistencies between the exemption values and minimum constraint values.
The staff should continue to monitor ICRP activities and review ICRP documents, and, consistent with previous direction, should continue to raise any potential policy issues to the Commission. In these interactions, the staff should reinforce the principle that radiological protection recommendations should enhance public health and safety, and the costs of implementing the recommendations should be commensurate with their potential benefits.
The Commission would like to thank the Advisory Committee on Nuclear Waste (ACNW) for its detailed review of the ICRP recommendations and for the clear and well written letter report dated November 3, 2004. This effort by the ACNW working group was beneficial to both the staff and the Commission.
Additional change to Attachment 2
- 1. On page 1, paragraph 1, line 4, change ... The NRCs was ... to ... The NRC was ...
- 2. On page 3, item 8, change first sentence to read: NRC is unaware of any evidence ...
cc: Chairman Diaz Commissioner McGaffigan Commissioner Merrifield OGC DOC CFO OCA OIG OPA Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR