Emergency Preparedness Inspection and Request for Information
ML12090A067
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/28/2012
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: James Shea
Tennessee Valley Authority
D. Burley X-4503 (entered by L. Gruhler)
References
Download: ML12090A067 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 28, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT - EMERGENCY PREPAREDNESS INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Shea:

From October 1 - 5, 2012, the NRC will perform baseline Emergency Preparedness inspections at the Sequoyah Nuclear Plant, (NRC Inspection Procedures: 71114.01 - Exercise Evaluation and the Emergency Preparedness Sections of 71151, Performance Indicator Verification).

Experience has shown that this inspection is resource-intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Don Sutton of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Mark E. Speck at (404) 997-4759 (mark.speck@nrc.gov) or the Chief of Plant Support Branch 1, Brian Bonser at (404) 997-4653.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document

TVA 2

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.

50-327, 50-328 License No.

DPR-77, DPR-79

Enclosure:

Document Request List cc w/encl: (See page 3)

ML12090A067 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS/PSB1 RII:DRS/PSB1 SIGNATURE

/RA/

/RA/

NAME M. Speck B. Bonser DATE 3/ 28 /2012 3/ 28 /2012 E-MAIL COPY YES NO YES NO

TVA 3

cc w/encl:

J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution P. R. Simmons Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution G. M. Cook Manager Licensing Sequoyah Nuclear Plant Electronic Mail Distribution C. D. Mackaman Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Ann Harris 341 Swing Loop Rockwood, TN 37854 County Mayor Hamilton County Hamilton County Courthouse 208 Courthouse 625 Georgia Avenue Chattanooga, TN 37402-2801 Tennessee Department of Environment

& Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243

Enclosure Document Request List Inspection Dates:

October 1 - 5, 2012 Inspection Procedures:

IP 71114.01 Exercise Evaluation IP 71151 Performance Indicator Verification Note: This is a list of the documents to be delivered to the NRC Region II Office (Attention:

Mark Speck, 245 Peachtree Center Avenue, NE, Suite 1200, Atlanta, GA 30303-1257) and/or provided to the Team Lead Inspector upon arrival for the inspections. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. The preferred file format is Word or searchable.pdf files on CDROM or thumb drive. Please organize the information as it is arranged below (e.g., a folder labeled Miscellaneous). It is not the intent that large or burdensome data be scanned for this purpose.

This data will be inspected using original documentation. If there are questions regarding the documents requested, please do not hesitate to contact the lead inspector.

EP1 Exercise Evaluation Drill and exercise related procedures Core damage assessment procedure Dose assessment procedure Special/emergency exposure procedure Potassium Iodide distribution procedure Assembly/accountability procedure Emergency Facility Activation procedures Previous two exercise packages: scenario timeline drill reports or assessment, and respective Final FEMA/ DHS exercise reports All drill reports within inspection period Current exercise package: scenario timeline, expected Drill and Exercise Performance opportunities, exercise objectives, radiological assumptions, and scope of play and participation Corrective action program entries related to the exercises and drills for the two year inspection period EP01/EP02/EP03 Performance Indicators (PI) Verification Governing document for the performance indicator process Drill and Exercise Performance (DEP), Emergency Response Organization (ERO), and Alert and Notification System (ANS) PI data submitted for the two year inspection period DEP documentation and evaluations for the two year inspection period Current ERO roster Corrective action program entries related to performance indicators (i.e., DEP, ERO training and participation, and ANS) for the two year inspection period Miscellaneous Procedures Current Emergency Plan and Emergency Action Levels Safety Evaluation Report approved Emergency Plan and Emergency Action Levels Current Emergency Plan implementing procedures Corrective Action Program procedures