E-mail from Holly Cruz, NRR to Robert Wilson, NRR, Et Al; Subject: TIA Status Report
ML12088A217
Person / Time
Site: Point Beach, Watts Bar, Seabrook, San Onofre  NextEra Energy icon.png
Issue date: 08/25/2011
From: Holly Cruz
Office of Nuclear Reactor Regulation
To: John Jolicoeur, Mcginty T, Nelson R
Office of Nuclear Reactor Regulation
References
FOIA/PA-2012-0119
Download: ML12088A217 (5)


Text

Valentine, Nicholee From:

Cruz, Holly Sent:

Thursday, August 25, 2011 5:55 PM To:

Nelson, Robert; McGinty, Tim, Jolicoeur, John Cc:

RidsNrrTIA Distribution; Miller, Barry

Subject:

TIA Status Report Attachments:

TIA Status 8 25 11.doc Nelson/Tim/John, Attached is the biweekly TIA status report to support your Directors call with the Regions on Friday. Note that I used blue font in areas on the report to better illustrate updates/changes from the previous report. Listed below are items that may be of most interest from the last two weeks:

1. We held a call with the region on 8/17/11, to discuss the TIA request for Seabrook (re: Alkali Silica Reaction (ASR) resulting in degradation of concrete). The language in the TIA was agreed upon and the region expects to formally submit the TIA within 1-2 weeks (Letter Method).
2. We received the TIA request for Watts Bar Unit 2 (re: seismic qualification of Heinemann circuit breakers), 8/19/11 (Letter Method).
3. We received the final TIA for the Point Beach (Concurrence Method), 8/16/11.
4. Region IV has requested a revision to TIA 2009-02, Requirements for testing station batteries for Station Black Out conditions at the San Onofre Nuclear Generating Station. The staff will meet to discuss the path forward the week of 8/29/11.

Please let me know if you have any questions.

Thanks, Holly Holly Cruz, Project Manager Licensing Processes Branch (PLPB)

Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Phone: (301) 415-1053 Location: 012F12 M/S: 012E1 email: holly.cruz(@nrc.flov rj US.NRC information in this record was deletod in accordance with the Fre dom f lofmpon Act, exemptions.-

FOIA-2--/L--C*,.

TIA Status (as of August 11, 2011)

N

-~

TABLE 1 - OPEN TIAs ASSIGNED TO NRR (by Plant Name)

(Information as of August 11, 2011)

/S cjv4i;56

TABLE 2 - PENDING TIAs (by Plant Name)

(Information as of August 11. 2011)

PLANT TIA NO.

ISSUE ACTION ACTION EXPECTED STATUS/

AND DESCRIPTION HOLDERS TECHNICAL OTHER REMARKS EXPECTED BRANCHES SUBMITTAL INVOLVED DATE Seabrook (RI)

Week of 915/i 1 ASR phenomenon resulting in Degradation of Concrete/Aggregate RI Region to submit TIA request EMCB DLR Revised draft provided to NRR on 8/11/11 (version 7). Meeting held on 8/17/11 to discuss draft. We expect formal submittal of TIA request (1-2 weeks).

0D 0~

Ctn 0

-0 (D

acz~'4v4*~~, d$~~r(epe