Valentine, Nicholee From:
Cruz, Holly Sent:
Thursday, August 25, 2011 5:55 PM To:
Nelson, Robert; McGinty, Tim, Jolicoeur, John Cc:
RidsNrrTIA Distribution; Miller, Barry
Subject:
TIA Status Report Attachments:
TIA Status 8 25 11.doc Nelson/Tim/John, Attached is the biweekly TIA status report to support your Directors call with the Regions on Friday. Note that I used blue font in areas on the report to better illustrate updates/changes from the previous report. Listed below are items that may be of most interest from the last two weeks:
- 1. We held a call with the region on 8/17/11, to discuss the TIA request for Seabrook (re: Alkali Silica Reaction (ASR) resulting in degradation of concrete). The language in the TIA was agreed upon and the region expects to formally submit the TIA within 1-2 weeks (Letter Method).
- 2. We received the TIA request for Watts Bar Unit 2 (re: seismic qualification of Heinemann circuit breakers), 8/19/11 (Letter Method).
- 3. We received the final TIA for the Point Beach (Concurrence Method), 8/16/11.
- 4. Region IV has requested a revision to TIA 2009-02, Requirements for testing station batteries for Station Black Out conditions at the San Onofre Nuclear Generating Station. The staff will meet to discuss the path forward the week of 8/29/11.
Please let me know if you have any questions.
- Thanks, Holly Holly Cruz, Project Manager Licensing Processes Branch (PLPB)
Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Phone: (301) 415-1053 Location: 012F12 M/S: 012E1 email: holly.cruz(@nrc.flov rj US.NRC information in this record was deletod in accordance with the Fre dom f lofmpon Act, exemptions.-
FOIA-2--/L--C*,.
TIA Status (as of August 11, 2011)
N
-~
TABLE 1 - OPEN TIAs ASSIGNED TO NRR (by Plant Name)
(Information as of August 11, 2011)
/S cjv4i;56
TABLE 2 - PENDING TIAs (by Plant Name)
(Information as of August 11. 2011)
PLANT TIA NO.
ISSUE ACTION ACTION EXPECTED STATUS/
AND DESCRIPTION HOLDERS TECHNICAL OTHER REMARKS EXPECTED BRANCHES SUBMITTAL INVOLVED DATE Seabrook (RI)
Week of 915/i 1 ASR phenomenon resulting in Degradation of Concrete/Aggregate RI Region to submit TIA request EMCB DLR Revised draft provided to NRR on 8/11/11 (version 7). Meeting held on 8/17/11 to discuss draft. We expect formal submittal of TIA request (1-2 weeks).
0D 0~
Ctn 0
-0 (D
acz~'4v4*~~, d$~~r(epe
Outside of Scope (2 pages)