Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besse's 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Monday, March 12, 2012 11:47 AM To: dorts@firstenergycorp.com Cc: custerc@firstenergycorp.com; Davis-BesseHearingFile Resource
Subject:
FW: FENOC License Renewal RAI Letter L-12-015 (Part 2 of 3)
Attachments: LR-M012E Rev 2 Final 030912.pdf; LR-M020B Rev 3 Final 030912.pdf; LR-M036C Sheet 1 Rev 3 Final 030912.pdf; LR-M037C Rev 2 Final 030912.pdf; LR-M037D Rev 4 Final 030912.pdf Thanks From: dorts@firstenergycorp.com [1]
Sent: Friday, March 09, 2012 3:22 PM To: CuadradoDeJesus, Samuel Cc: custerc@firstenergycorp.com
Subject:
FENOC License Renewal RAI Letter L-12-015 (Part 2 of 3) 2 of 3 emails providing updated License Renewal Boundary Drawings included as the Enclosure to the letter.
See attached drawings.
_____
Steve Dort DBNPS License Renewal
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 3675 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D080722BF7AF)
Subject:
FW: FENOC License Renewal RAI Letter L-12-015 (Part 2 of 3)
Sent Date: 3/12/2012 11:47:21 AM Received Date: 3/12/2012 11:47:30 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1040 3/12/2012 11:47:30 AM LR-M012E Rev 2 Final 030912.pdf 519587 LR-M020B Rev 3 Final 030912.pdf 402597 LR-M036C Sheet 1 Rev 3 Final 030912.pdf 734825 LR-M037C Rev 2 Final 030912.pdf 799201 LR-M037D Rev 4 Final 030912.pdf 458955 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
LR NOTE B LR NOTE B 24 LR NOTE B LR NOTES:
A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.
B. COMPONENTS BEYOND THE HIGHLIGHTING ARE OUTSIDE THE INTAKE STRUCTURE, AND THEREFORE NOT IN N SCOPE.
LICENSE RENEWAL BOUNDARY DRAWING LR-M012E REV. 2 SYSTEMS SHOWN ON THIS DRAWING:
07:
7 SERVIC SERVICE WATER 24: NONSAFETY AFFECTING SAFETY 07 LR NOTE B
LR NOTE B LR NOTE B LR NOTE B HIGHLIGHTING CONTINUED ON LR-M037G HIGHLIGHTING CONTINUED ON HIGHLIGHTING LR-M039B CONTINUED ON LR-M037D HIGHLIGHTING CONTINUED ON LR-M037H HIGHLIGHTING HIGHLIGHTING CONTINUED ON CONTINUED ON LR-M035 LR-M035 LR NOTE D LR NOTE D HIGHLIGHTING CONTINED ON LR-M003C LR NOTE B LR NOTES:
A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.
B. COMPONENTS LOCATED BEYOND THE HIGHLIGHTING ARE LOCATED IN THE TURBINE BUILDING, WHERE (A)(2)-NSAS CONSIDERATIONS ARE NOT A CONCERN, AND ARE THEREFORE NOT IN SCOPE.
24 13 C. NOTE IS NOT USED.
D. COMPONENTS LOCATED BEYOND THE HIGHLIGHTING DO NOT LR NOTE B CONTAIN LIQUID OR STEAM NOR ARE ATTACHED TO SAFETY-RELATED COMPONENTS. THEREFORE, THESE COMPONENTS ARE NOT WITHIN THE SCOPE OF LICENSE RENEWAL.
E. NOTE IS NOT USED.
LICENSE RENEWAL BOUNDARY DRAWING LR-M020B REV. 3 SYSTEMS SHOWN ON THIS DRAWING:
13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 24: NONSAFETY AFFECTING SAFETY 24 13
13 25 25 13 LR NOTE J LR NOTE H 13 25 LR NOTE E 13 13 25 25 13 LR NOTE H LR NOTE J LR NOTE G 13 25 13 LR NOTE J LR NOTE J LR NOTE D 13 13 LR NOTE K LR NOTE F LR NOTE J LR NOTE C 13 LR NOTE J HIGHLIGHTING 13 CONTINUED ON LR-M039B LR NOTE J LR NOTE J 23 13 13 23 LICENSE RENEWAL BOUNDARY DRAWING 13 23 LR-M036C SHEET 1 REV. 3 SYSTEMS SHOWN ON THIS DRAWING:
HIGHLIGHTING 13 13 13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE CONTINUED ON 15: SPENT FUEL COOLING & CLEANUP 15 15 23: SAMPLING LR-M037D HIGHLIGHTING 25: BORON RECOVERY CONTINUED ON 13 15 15 DRAWING LR-M035 13 15 13 13 15 LR NOTES (CONTINUED):
F. WASTE GAS COMPRESSORS ARE HIGHLIGHTED ON BOUNDARY DRAWING LR-M038B.
G. CONTROL ROD DRIVES ARE HIGHLIGHTED ON BOUNDARY LR NOTES: DRAWING LR-M040A.
H. INCLUDES VALVE DB-CC87 (SHOWN ON M-037H FOR BORIC ACID A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01. EVAPORATOR PACKAGE 1-2) AND VALVE DB-CC88 (SHOWN ON B. NOTE IS NOT USED. M-037G FOR BORIC ACID AC EVAPORATOR PACKAGE 1-1).
C. SEAL RETURN COOLERS ARE HIGHLIGHTED ON BOUNDARY C I. NOTE IS NOT USED.
DRAWING LR-M031B. J. UPDATED S/I BOUNDARY J BOUNDA IS AT THE INDICATED LOCATION, AS D. THE PRESSURIZER QUENCH TANK COOLER IS HIGHLIGHTED ON SHOWN ON P&ID M-036C REV.
REV 29.
29 BOUNDARY DRAWING LR-M040A. K. SEE LICENSE RENEWAL BOUNDARY DRAWING LR-M036C SHEET E. LETDOWN COOLERS ARE HIGHLIGHTED ON BOUNDARY DRAWING 2 (F-5) FOR CONTINUATION OF IN-SCOPE COMPONENTS LR-M031A. ASSOCIATED WITH THE ABANDONED IN-PLACE EVAPORATOR STORAGE TANK PUMPS.
25 20 23 25 13 24 13 23 25 24 LR NOTE B 25 24 25 13 LR NOTE B 25 23 25 25 24 24 19 25 24 25 19 25 25 19 24 19 25 25 24 LR NOTE B 25 LR NOTES:
A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001 B. COMPONENTS BEYOND THE HIGHLIGHTING DO NOT CONTAIN LIQUID OR STEAM NOR ARE ATTACHED TO SAFETY-RELATED COMPONENTS. THEREFORE, THESE COMPONENTS ARE NOT WITHIN THE SCOPE OF LICENSE RENEWAL.
LR NOTE B LICENSE RENEWAL BOUNDARY DRAWING LR NOTE B LR-M037C REV. 2 23 SYSTEMS SHOWN ON THIS DRAWING:
13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 25 25 23 23 25 23 19: REACTOR COOLANT VENT & DRAIN 25 20: STATION PLUMBING, DRAINS, & SUMPS 23: SAMPLING 24: NONSAFETY AFFECTING SAFETY 25: BORON RECOVERY 24 25
19 25 18 HIGHLIGHTING CONTINUED ON LR-M036C HIGHLIGHTING CONTINUED ON LR-M020B 24 4 13 25 25 13 25 13 LR NOTE C LR NOTE B 13 25 HIGHLIGHTING HIGLIGHTING CONTINUED ON CONITINUED ON LR-M020B LR-M036C 13 25 LR NOTE C 25 24 25 13 24 25 25 24 LR NOTES:
A. FOR GENERAL LICENSE RENEWAL NOTES REFER TO LR-M001-01.
B. HIGHLIGHTING ENDS AT PIPE CAP AT WC-184, WC-186, and WC533, AS SHOWN ON DUN 10-0490-001-013.
C. S/I BOUNDARY AT THE INDICATED LOCATION HAS BEEN REMOVED, AS SHOWN ON P&ID M-073D REV. 23 AND REV. 24.
LICENSE RENEWAL BOUNDARY DRAWING LR-M037D REV. 4 SYSTEMS SHOWN ON THIS DRAWING:
13: COMPONENT COOLING & DEMINERALIZED WATER STORAGE 18: GASEOUS RADWASTE 19: REACTOR COOLANT VENT & DRAIN 23: SAMPLING 24: NONSAFETY AFFECTING SAFETY 25: BORON RECOVERY