Category:Letter
MONTHYEARDCL-25-013, Nuclear Material Transaction Report for New Fuel2025-01-22022 January 2025 Nuclear Material Transaction Report for New Fuel IR 05000275/20240042025-01-15015 January 2025 Integrated Inspection Report 05000275/2024004 & 05000323/2024004 DCL-25-004, Nuclear Material Transaction Report for New Fuel2025-01-14014 January 2025 Nuclear Material Transaction Report for New Fuel DCL-25-001, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation Diablo Canyon Safety Review Pacific Gas and Electric Company2025-01-0202 January 2025 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation Diablo Canyon Safety Review Pacific Gas and Electric Company DCL-24-118, License Amendment Request 24-06, Revision to Technical Specification 1.1 and Addition of 5.5.21 to Use Online Monitoring Methodology2024-12-31031 December 2024 License Amendment Request 24-06, Revision to Technical Specification 1.1 and Addition of 5.5.21 to Use Online Monitoring Methodology DCL-24-121, License Amendment Request 24-07, Revision to Required Action Completion Times Consistent with NUREG-1431, Revision 52024-12-31031 December 2024 License Amendment Request 24-07, Revision to Required Action Completion Times Consistent with NUREG-1431, Revision 5 ML25003A0512024-12-30030 December 2024 Thirty-Fourth Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-24-111, License Amendment Request 24-05 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b for TS 3.3.1 and 3.3.22024-12-24024 December 2024 License Amendment Request 24-05 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b for TS 3.3.1 and 3.3.2 DCL-24-119, License Amendment Request 24-08 Application to Revise Technical Specifications to Adopt TSTF-5412024-12-24024 December 2024 License Amendment Request 24-08 Application to Revise Technical Specifications to Adopt TSTF-541 DCL-24-122, Nuclear Material Transaction Report for New Fuel2024-12-23023 December 2024 Nuclear Material Transaction Report for New Fuel ML25006A0972024-12-20020 December 2024 Fws to NRC, Informal Consultation for the Diablo Canyon Units 1 and 2 Proposed License Renewal, San Luis Obispo County, California, and Concurrence with Endangered Species Act Nlaa Determinations DCL-24-120, Nuclear Material Transaction Report for New Fuel2024-12-18018 December 2024 Nuclear Material Transaction Report for New Fuel L-24-012, Independent Spent Fuel Storage Installation, Decommissioning Funding Plan2024-12-16016 December 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Plan IR 05000275/20244052024-12-13013 December 2024 Security Baseline Inspection Report 05000275/2024405 and 05000323/2024405 DCL-24-116, Draft Supplemental Environmental Impact Statement Comment Letter2024-12-13013 December 2024 Draft Supplemental Environmental Impact Statement Comment Letter ML24269A0832024-12-11011 December 2024 Issuance of Amendment Nos. 247 and 249 Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24318C4822024-12-0505 December 2024 – Request for Additional Information Alternative Security Measures for Early Warning System (EPID L-2024-LLA-0048 & L-2024-LLE-0016) (Redacted Version) ML24317A0382024-12-0505 December 2024 OEDO-24-00083 - 2.206 Petition Regarding Seismic Core Damage Frequency for Diablo Canyon Nuclear Power Plant, Units 1 and 2, Supplemental Acknowledgment Letter (EPID L-2024-CRS-0000) (Letter) DCL-24-094, License Amendment Request 24-04 Application to Revise Technical Specifications (TS) to Adopt TSTF-589 to Modify TS 3.3.5 and 3.8.22024-11-20020 November 2024 License Amendment Request 24-04 Application to Revise Technical Specifications (TS) to Adopt TSTF-589 to Modify TS 3.3.5 and 3.8.2 ML24346A0272024-11-20020 November 2024 Printed Documents Provided to NRC Staff During Nov 20, 2024 Public Meeting DCL-24-106, Technical Specification Bases, Revision 152024-11-18018 November 2024 Technical Specification Bases, Revision 15 ML24323A2402024-11-18018 November 2024 Submittal of Updated Final Safety Analysis Report, Revision 28, Part 1 ML24311A1232024-11-14014 November 2024 – Report for the Aging Management Audit Regarding the License Renewal Application Review IR 05000275/20240102024-11-0707 November 2024 Biennial Problem Identification and Resolution Inspection Report 05000275/2024010 and 05000323/2024010 IR 05000275/20244022024-11-0707 November 2024 Security Baseline Inspection Report 05000275/2024402 and 05000323/2024402 DCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 IR 07200026/20244012024-11-0606 November 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200026/2024401 ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24276A1482024-10-30030 October 2024 NRC to Fws Request for Concurrence with Endangered Species Act Determinations for Diablo Canyon Power Plant, Units 1, 2, ISFSI Proposed License Renewals in San Luis Obispo Co, CA ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-2024-535, Rd Quarter 2024 Discharge Self-Monitoring2024-10-17017 October 2024 Rd Quarter 2024 Discharge Self-Monitoring DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 2025-01-22
[Table view] Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML23236A4682023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19050A4872019-01-25025 January 2019 DC 2019-01 Draft Operating Test ML19050A4942019-01-25025 January 2019 DC 2019-01 Post Examination Comments ML19050A4952019-01-25025 January 2019 DC-2019-01 Draft Operating Test Comments ML19050A4892019-01-25025 January 2019 DC 2019-01 Draft Outlines ML19050A4922019-01-25025 January 2019 DC 2019-01 Final Outlines ML19050A4912019-01-25025 January 2019 DC 2019-01 Final Operating Test ML19050A4902019-01-25025 January 2019 DC 2019-01 Draft Written Examination Comments ML19078A1252019-01-25025 January 2019 DC-2019-01 Public Forms ML19050A4882019-01-25025 January 2019 DC 2019-01 Draft Outline Comments ML19050A4932019-01-25025 January 2019 DC 2019-01 Final Written Examination ML19050A4962019-01-25025 January 2019 DC-2019-01 Draft Written Examination ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML23236A4682023-08-24024 August 2023 Notification of NRC Initial Operator Licensing Examination 05000275/2024301; 05000323/2024301 IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter ML21075A2212021-02-12012 February 2021 DC-2021-01 Draft Op Test ML21075A2222021-02-12012 February 2021 DC-2021-01 Draft Outline Comments ML21075A2262021-02-12012 February 2021 DC-2021-01 Final Outlines ML21075A2242021-02-12012 February 2021 DC-2021-01 Draft Written Comments ML21075A2202021-02-12012 February 2021 DC 2021-01 Draft Op Test Comments ML21075A2252021-02-12012 February 2021 DC-2021-01 Draft Written Exam DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A0882021-02-12012 February 2021 DC-2021-01 Final Written Exam DCL-20-073, DC-2021-01 Draft Outlines2021-02-12012 February 2021 DC-2021-01 Draft Outlines ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms ML21075A0872021-02-12012 February 2021 DC-2021-01 Final Op Test DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test IR 05000275/20203012020-02-19019 February 2020 NRC Initial Operator Licensing Examination Approval 05000275/2020301; 05000323/2020301 DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19050A4952019-01-25025 January 2019 DC-2019-01 Draft Operating Test Comments ML19050A4912019-01-25025 January 2019 DC 2019-01 Final Operating Test ML19050A4882019-01-25025 January 2019 DC 2019-01 Draft Outline Comments ML19050A4932019-01-25025 January 2019 DC 2019-01 Final Written Examination ML19078A1252019-01-25025 January 2019 DC-2019-01 Public Forms ML19050A4942019-01-25025 January 2019 DC 2019-01 Post Examination Comments ML19050A4902019-01-25025 January 2019 DC 2019-01 Draft Written Examination Comments ML19050A4872019-01-25025 January 2019 DC 2019-01 Draft Operating Test ML19050A4892019-01-25025 January 2019 DC 2019-01 Draft Outlines ML19050A4962019-01-25025 January 2019 DC-2019-01 Draft Written Examination ML19050A4922019-01-25025 January 2019 DC 2019-01 Final Outlines ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test 2024-08-02
[Table view] |
See also: IR 05000275/2012301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
March 6, 2012
John T. Conway
Senior Vice President-Energy &
Supply and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Nuclear Plant
77 Beale Street, Mail Code B32
San Francisco, CA 94105
SUBJECT:
DIABLO CANYON, UNITS 1 AND 2 - NRC INITIAL OPERATOR LICENSING
RETAKE WRITTEN EXAMINATION APPROVAL 05000275/2012301;
05000323/2012301
Dear Mr. Conway:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing retake written examination at Diablo Canyon Nuclear Power Plant.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Ron Fortier, NRC
Exam Development Lead. Note that any examination waivers and application denials have
been addressed in separate correspondence.
The NRC has approved the subject examination and hereby authorizes you to administer the
written examination in accordance with NUREG-1 021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on March 9, 2012. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review, I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
f9n 'i/2:::5 )r
Mark S. Haire, Chief
Operations Branch
Division of Reactor Safety
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
John T. Conway
Senior Vice President-Energy &
Supply and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Nuclear Plant
77 Beale Street, Mail Code B32
San Francisco, CA 94105
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
March 6, 2012
SUBJECT:
DIABLO CANYON, UNITS 1 AND 2 - NRC INITIAL OPERATOR LICENSING
RETAKE WRITTEN EXAMINATION APPROVAL 05000275/2012301;
05000323/2012301
Dear Mr. Conway:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing retake written examination at Diablo Canyon Nuclear Power Plant.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Ron Fortier, NRC
Exam Development Lead. Note that any examination waivers and application denials have
been addressed in separate correspondence.
The NRC has approved the subject examination and hereby authorizes you to administer the
written examination in accordance with NUREG-1 021, "Operator Licensing Examination
Standards for Power Reactors," Revision 9, Supplement 1, on March 9, 2012. This examination
has undergone extensive review by my staff and representatives responsible for licensed
operator training at your facility. Based on this review, I have concluded that the examination
meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By
administering this examination, you also agree that it meets NUREG-1021 guidelines, and is
appropriate for measuring the qualifications of licensed operator applicants at your facility. If
you determine that this examination is not appropriate for licensing operators at your facility, do
not administer the examination and contact me at (817) 200-1159.
Please contact your Chief Examiner, Clyde Osterholtz, at (817) 200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
Sincerely,
f9n 'i/2:::5 )r
Mark S. Haire, Chief
Operations Branch
Division of Reactor Safety
Pacific Gas and Electric Company
- 2
Dockets: 50-275; 50-323
Licenses: DPR-80; DPR-82
Enclosure: ES-201-4
cc w/enclosure:
Ron Fortier, NRC Exam Development Lead
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, CA 93424
cc wlo enclosure:
Distribution via ListServ for Diablo Canyon Power Plant
Pacific Gas and Electric Company
Dockets: 50-275; 50-323
Licenses: DPR-80; DPR-82
Enclosure: ES-201-4
cc w/enclosure:
Ron Fortier, NRC Exam Development Lead