MONTHYEARDCL-11-018, License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs)2011-02-17017 February 2011 License Amendment Request 11-02, Revision to Technical Specification 3.7.1, Main Steam Safety Valves (Mssvs) Project stage: Request ML1108706822011-03-28028 March 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification (TS) 3.7.1, Main Steam Safety Valves (Mssvs), to Remove a One-time Note from TS Table 3.7.1-1 Project stage: Acceptance Review ML1203704962012-02-0606 February 2012 Email, Request for Additonal Information, License Amendment Request to Revise TS 3.7.1, Main Steam Safety Valves Project stage: Other DCL-12-024, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-018. License Amendment Request 11-02. Revision to Technical Specification 3.7.1. 'Main Steam Safety Valves (Mssvs)'.2012-02-27027 February 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-018. License Amendment Request 11-02. Revision to Technical Specification 3.7.1. 'Main Steam Safety Valves (Mssvs)'. Project stage: Response to RAI ML1206106342012-03-0101 March 2012 Email, Draft Request for Additional Information, License Amendment Request to Revise Technical Specification 3.7.1, Main Steam Safety Valves Project stage: Draft RAI DCL-12-065, Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-01B, License Amendment Request 11-02, Revision to Technical Specification 3.7.1. Main Steam Safety Valves (Mssvs).2012-07-0202 July 2012 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-01B, License Amendment Request 11-02, Revision to Technical Specification 3.7.1. Main Steam Safety Valves (Mssvs). Project stage: Response to RAI ML12240A3222012-09-0707 September 2012 Summary of Audit to Review Calculations That Support License Amendment Request Related to Main Steam Safety Valves Project stage: Other 2012-02-06
[Table View] |
|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] |
Text
Pacific Gas and Electric Company James R. Becker Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 805 . 545.3462 Internal: 691 . 3462 February 27,2012 Fax: 805 . 545.6445 PG&E Letter DCL-12-024 U.S. Nuclear Regulatory Commission 10 CFR 50.90 ATTN: Docu ment Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-BO Docket No. 50-323, OL-DPR-B2 Diablo Canyon Units 1 and 2 Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-01B. "License Amendment Request 11-02. Revision to Technical Specification 3.7.1. 'Main Steam Safety Valves (MSSVs)
Reference:
- 1. PG&E Letter DCL-11-01B, "License Amendment Request 11-02, Revision to Technical Specification 3.7.1, 'Main Steam Safety Valves (MSSVs),'" dated February 17, 2011
- 2. PG&E Letter DCL-11-055, "Supplement to License Amendment Request 11-02 Revision to Technical Specification 3.7.1, 'Main Steam Safety Valves (MSSVs),'" dated April 21,2011 In Reference 1, Pacific Gas and Electric Company (PG&E) submitted a license amendment request to revise Technical Specification (TS) 3.7.1, "Main Steam Safety Valves (MSSVs)," Table 3.7.1-1, "Maximum Allowable Power Range Neutron Flux High Setpoint With Inoperable MSSVs," to remove a one-time note specific to Diablo Canyon Power Plant (DCPP), Unit 2 for Cycle 15, which is no longer applicable or needed. In Reference 1, PG&E also proposed to revise the TS Bases, applicable to DCPP, Units 1 and 2, to adopt a new analysis methodology for establishing the reduced power range neutron flux high setpoint for one inoperable MSSV as listed in TS Table 3.7.1-1.
In Reference 2, PG&E clarified that the revision to the TS Bases requested in Reference 1 is a revision to the Final Safety Analysis Report Update (FSARU),
as the TS Bases are incorporated into the FSARU by reference. Reference 2 supplemented Reference 1 by providing proposed revisions to FSARU Sections 15.2.7.3, "Results," and 15.2.16, "References."
The NRC Staff provided a request for additional information (RAI) via e-mail, dated February 6, 2012. The Enclosure to this letter provides PG&E's response to the NRC RAI.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
.1 Document Control Desk
~&~ February 27,2012 Page 2 PG&E Letter DCL-12-024 PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.
I state under penalty of perjury that the foregoing is true and correct.
Executed on February 27,2012.
Sincerely,
~~~-tr James R. Becker Site Vice President SSZ/4040/50456803 Enclosure cc: Diablo Distribution cc/enc: Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Joseph T. Sebrosky, NRR Project Manager Alan B. Wang, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Enclosure PG&E Letter DCL-12-024 PG&E Response to NRC Request for Additional Information Regarding PG&E Letter DCL-11-018, "License Amendment Request 11-02, Revision to Technical Specification 3.7.1, 'Main Steam Safety Valves (MSSVs)'"
NRC Question:
Please provide the basis for the change in the MSSV accumulation initial condition uncertainties from 3% accumulation used in PG&E Calculation N-114, Rev. 0 to 5 psi accumulation used as an input parameter in the new Westinghouse RETRAN-02W analyses.
PG&E Response:
Per ASME Code Section III Article subparagraph NC-7512.2, the steam generator safety valves (commonly referred to as main steam safety valves (MSSVs)) shall lift within a set pressure tolerance that does not exceed 1 percent. Per ASME Code Section III Article subparagraph NC-7512.1, the MSSVs must attain rated lift (typically termed accumulation) at a pressure that does not exceed the set pressure by more than 3 percent. The ASME code does not establish any requirements or provide any guidance on how to model analytically the MSSVs obtaining full lift during pressure increase accident analyses. Therefore, the safety analyses such as that documented in PG&E Calculation N-114 have historically assumed that such spring-loaded valves open linearly over a pressure range of 3 percent above the analytical opening pressure.
However, because the N-114 calculation assumed a set pressure tolerance of
+3 percent, assuming an additional 3 percent accumulation above this lift setpoint is overly conservative with respect to the ASME code requirements.
Reference 5 notes that extensive industry testing, including EPRI Report NR-4306-SR (Reference 1) demonstrated that once a spring-loaded safety valve reaches the point of first stem movement, the valve immediately "pops" wide open relieving steam at, or near, full capacity with no appreciable accumulation. The MSSVs installed at Diablo Canyon Power Plant (DCPP) are type 3700 valves manufactured by Dresser Industries to ASME code requirements for nuclear power application. Westinghouse has evaluated the DCPP Dresser MSSVs and determined that, if properly maintained and set per the Manufacturer's Maintenance Manual, they will pop open and achieve full lift within a 5 psi accumulation. Based on this evaluation, the Crosby MSSV test data referenced in EPRI Report NR-4306-SR (Reference 1) is applicable to the Dresser MSSVs, and the 5 psi accumulation MSSV model is applicable to the DCPP Dresser MSSVs.
Therefore, the Loss of Load analyses documented in PG&E Letter DCL-11-018 still conservatively model actual safety valve behavior based on simulating the MSSV opening as a ramp function from closed to full open over a 5 psi pressure increase range. The analyses in DCL-11-018 still assume that the MSSVs do not start to open until the main steam system pressure is 3 percent above the nominal set pressure.
Assuming that the MSSVs achieve rated flow capacity within an additional 5 psi above 1
Enclosure PG&E Letter DCL-12-024 the +3 percent set point tolerance is still conservative with respect to the 3 percent accumulation requirement specified in the ASME code.
The use of a 5 psi safety valve accumulation is now part of the standard Westinghouse methodology. Westinghouse has confirmed that it has been used in the safety analyses as documented in a number of plant licensing applications that have been approved by the NRC. The NRC specifically issued a Request for Additional Information (RAI) to the Union Electric (UE) Company's Callaway plant regarding the 5 psi accumulation model used in the safety analysis in support of a license amendment. In the RAI response of March 4, 1998, (Reference 2) Callaway provided a detailed technical basis and justification for use of the 5 psi accumulation model consistent with that discussed above. The NRC accepted the applicable Callaway safety analysis and approved the license amendment (Reference 3). The Safety Evaluation in Reference 3 acknowledged that UE provided supplemental information in the March 4, 1998, letter (Reference 2), in addition to other letters. The Safety Evaluation did not identify any restrictions or concerns related to use of the 5 psi accumulation model.
The 5 psi MSSV accumulation model was incorporated into the DCPP design basis via 10 CFR 50.59 for the non-LOCA safety analyses performed in support of the Replacement Steam Generator (RSG) project. This MSSV accumulation model was evaluated as an element of the methodology because a mathematical model is utilized to simulate the response of the valve when the setpoint is reached. This is in accordance with the definition and discussion of elements of methodology in NEI 96-07, Section 3.10 (Reference 4). However, since the MSSV model is based on the performance characteristics of the valve, the change was also evaluated as an input change to the analysis. Westinghouse used the RETRAN-02W computer code and
+5 psi accumulation model for all of the non-LOCA accident analyses that credited MSSV actuation in support of the RSG project. The analysis results met all applicable acceptance criteria, and established the basis for acceptably incorporating these changes per 10 CFR 50.59.
In addition, Westinghouse performed sensitivity runs to benchmark and compare the 5 psi MSSV accumulation model with the 3 percent accumulation model used in the previous Analysis of Record (AOR). The benchmarking was done for the same set of accidents and plant conditions to verify that the results were comparable. The comparison of the new and old models also considered time behavior of results that were found to be very similar for the events analyzed in support of the RSG project.
The differences were deemed to be within the margins for error for the analyses such that the results were essentially the same per the guidance in NEI 96-07, Section 4.3.8.1, and acceptable per 10 CFR 50.59.
The 5 psi MSSV accumulation model is more consistent with actual tested valve behavior and is still conservative with the ASME code requirements since the MSSV set point tolerance is already assumed to be at +3 percent. The 5 psi MSSV accumulation model has been accepted by the NRC in numerous non-LOCA safety analyses with no identified physical constraints or methodology restrictions and has been evaluated into 2
Enclosure PG&E Letter DCL-12-024 the DCPP design basis via 10 CFR 50.59 for comparable safety analysis applications.
In summary, the 5 psi MSSV accumulation model is conservative and appropriate for evaluating the Loss of Load with an inoperable MSSV in support of the subject LAR 11-02 in DCL-11-018.
References
- 1) EPRI Report NR-4306-SR, "Safety and Relief Valves in Light Water Reactors,"
December 1985.
- 2) Union Electric Company Letter ULNRC-03747, "MSSV Setpoint Tolerance Revision" for Callaway Plant, Docket No. 50-483, March 4, 1998.
- 3) "Amendment No. 128 to Facility Operating License No. NPF Callaway Plant, Unit 1, (TAC No. M99149)," October 2, 1998. [Accession Number ML021640293]
- 4) NEI 96-07, Rev. 1, Guidelines for 10 CFR 50.59 Implementation, November 2000.
- 5) Westinghouse Letter PGE-09-05, "Input to Replacement Steam Generator Program Licensing Basis Impact Evaluation (LBIE)," February 3,2009.