Boyle, Patrick

/qcy I From: Stuchell, Sheldon Sent: Monday, September 19, 2011 5:15 PM To: Khanna, Meena; Karwoski, Kenneth Cc: Manoly, Kamal; Wilson, George; Boyle, Patrick; Martin, Robert; Jolicoeur, John

Subject:

RE: North Anna Acceptance Criteria R2 Comments.docx Attachments: North Anna Acceptance Criteria Consolidated Comments.docx

Meena, I took a quick swag at the acceptance criteria, and have attached with the new paragraph.

Sheldon From: Khanna, Meena Sent: Friday, September 16, 2011 5:38 PM To: Karwoski, Kenneth; Stuchell, Sheldon Cc: Manoly, Kamal; Wilson, George; Boyle, Patrick; Martin, Robert

Subject:

North Anna Acceptance Criteria R2 Comments.docx Ken and Sheldon, Attached are some comments that we received regarding the proposed acceptance criteria from Gerry McCoy in Region II. Could we pls meet on Monday to discuss and then conduct a call with him? I plan to go ahead and send the proposed acceptance criteria to OGC so that we can obtain input from them in parallel.

Thanks!

Meena

Short-Term Technical Acceptance Criteria For Demonstrating The Acceptability For North Anna Plant Restart Confirm the adequacy of the scope of the licensee's inspections, tests and analyses which demonstrate that no functional damage resulted from the earthquake to systems, subsystems, trains, components and devices (systems, structures, or components [SSCs]) for the current licensing basis (1) that are required to be operable by TSs, (2) SSCs not explicitly required to be operable by TSs, but that perform required support functions to maintain a TS required system operable; and (3) ISSbs that are nrot described in TSs but which warran-t prograrmmatic controls to ensure that sS-C- a-,vailab-iity and reliability are rnaintaine-i. Refer to NRC Inspection Manual - - Comment [G.M1]: This is so general, I have trouble understanding what it means. It seems Part 9900, "Operability Determinations and Functionality Assessments for Resolution of to catch anything which anyone feels is Degraded or NonConforming Conditions Adverse to Quality or Safety" for more detailed important. That doesn't rule much out! Maybe this is where we talk about risk significant, or guidance for determinations of operability and resolution of degraded or nonconforming safety related components (see the next

ý o nd ition rsl,. . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -----

. ..-- comment)

Comment [GJM2]:

(1) Should we also include SSCs which are not safety related, but are risk significant?

(2) Is there apossible to have SSCs which are safety related but not covered by TSs? If so, Confirm the adequacy of the scope of the licensee's inspections, tests and analyses which are they captured? Without finding a copy of demonstrate that no functional damage resulted from the earthquake to systems, subsystems, the TS, I know there are no LCO's for the RCS piping if it is inoperable, yet it should be covered trains, components and devices (systems, structures, or components [SSCs]) for the current by this review.

licensing basis (1) that are required to be operable by TSs, (2) that perform required support (3) Part 9900 provides guidance on what to do if functions to maintain a TS required system operable; and (3) that are risk significant or safety a non-conforming condition is identified. The licensee's effort is first a search for non-related. Refer to NRC Inspection Manual Part 9900, "Operability Determinations and confomring conditions, and after that, an Functionality Assessments for Resolution of Degraded or NonConforming Conditions Adverse evaluation of what was found. What guidance do we have available, or what guidance can we to Quality or Safety" for more detailed guidance for determinations of operability and resolution use to determine whether the search was of degraded or nonconforming conditions. The licensee must provide a plan for NRC approval, adequate?

detailing the methods used to search for non-conforming conditions, and the resulting evaluation method if non-conforming conditions are found. The plan must include a determination of an adequate search.

Contact:

Carl Schulten, NRR/ITSB