ML12044A382

From kanterella
Jump to navigation Jump to search
Email from G. Cheruvenki, NRR to C. Fairbanks, NRR on North Annaisi.Docx
ML12044A382
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/06/2011
From: Ganesh Cheruvenki
Office of Nuclear Reactor Regulation
To: Carolyn Fairbanks
Office of Nuclear Reactor Regulation
References
FOIA/PA-2011-0357
Download: ML12044A382 (2)


Text

.4 Fairbanks, Carolyn

ý..-14 From: Cheruvenki, Ganesh \ ý\ \V" Sent: Tuesday, September 06, 2011 12:52 PM To: Fairbanks, Carolyn

Subject:

North AnnalSI.docx Attachments: North AnnalSl.docx Carolyn---Here is the copy of my wite-up.

/72/

North Anna-Units 1 and 2-Seismic Event ---Inspections Reactor Vessel Internal (RVI) Components--Inspection- Staff does not have any regulatory requirement that enforces inspections of the RVI components at this time.

My opinion---

(1) Since the design basis seismic loading exceeded during the seismic event dated August 23, 2011, the licensee should provide an evaluation of the structural integrity of the following RVI components which were originally designed using seismic loadings e.g., SSE and DBE as a part of its design basis (Reference-Westinghouse Report-WCAP-14577, 2001). These are considered "Primary" components that require routine inspections during every ISI interval.

(a) Lower Support Forging; (b) Baffle Former Assembly; (c) Upper Core Plate; (d) Guide Tube; and (e) Core Barrel Assembly.