MONTHYEARML24107A9112024-04-15015 April 2024 NRC to Fws, Follow-up on Request for Concurrence for North Anna SLR ML24107A9122024-04-11011 April 2024 Fws to NRC, Follow-up on Request for Concurrence for North Anna SLR ML24087A0102024-03-26026 March 2024 NRR E-mail Capture - Verbal Relief for North Anna Unit 1 - (ASME Code), Section XI, Subsection IWB-2430 ML24087A0112024-03-23023 March 2024 NRR E-mail Capture - Draft RAIs for Reactor Coolant Pump (RCP) Relief Request (L-2024-LLR-0022) ML24107B1562024-02-20020 February 2024 Cherokee Nation E.Toombs Na Removal Request ML24044A2462024-02-0606 February 2024 001 Radiation Safety Baseline Inspection Information Request ML23320A1122024-01-18018 January 2024 NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML23355A2722023-12-21021 December 2023 NRR E-mail Capture - Schedule Revision for Emergency Preparedness Staff Augmentation Times License Amendment Request ML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML23039A1712023-02-0808 February 2023 NRR E-mail Capture - Acceptance Review for Technical Support Center (TSC) Relocation (L-2023-LLA-0006) ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22342B1472022-12-0808 December 2022 NRR E-mail Capture - Acceptance Review for LAR Re NAPS Post LOCA Buffer Change (L-2022-LLA-0162) ML22335A4842022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for LAR North Anna Power Station - Units 1 and 2 and Surry Power Station - Units 1 and 2 Emergency Plan Staff Augmentation Times (L-2022-LLA-0166) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22104A0252022-04-14014 April 2022 NRR E-mail Capture - Dominion Presentation Slides for April 21, 2022 Public Meeting on Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML22032A0962022-02-0101 February 2022 002 Radiation Safety Baseline Inspection Information Request ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22007A2672022-01-0707 January 2022 NRR E-mail Capture - North Anna, Unit 2, ASME Section XI Inservice Inspection Program Relief Request N2-14-LMT-003 Fourth Interval Third Period Limited Examinations (L-2021-LLR-0088) ML21335A0812021-12-0101 December 2021 NRR E-mail Capture - Acceptance Review for OMN-28 Request Alternative to ISTC-3700, Position Verification Testing (L-2021-LLR-0086) ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21312A0082021-11-0404 November 2021 Enclosure 2 - NAPS Draft SER Table A.1-1 Markup ML21312A0012021-11-0404 November 2021 Comments on North Anna Draft SER ML21312A0112021-11-0404 November 2021 Enclosure 3 - NAPS Draft SER Section 3 Comments ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21274A0022021-09-30030 September 2021 NRR E-mail Capture - Acceptance Review for TSTF-577 LAR (L-2021-LLA-0158) ML21312A0072021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure B - NAPS SER App a - Dominion Comments 9-21-2021 ML21312A0032021-09-21021 September 2021 Enclosure 1 - E-mail - Enclosure a - Dominion Table A4.4-1 Clean Version ML21312A0022021-09-21021 September 2021 Enclosure 1 - E-mail - NAPS SLR SER Appendix a for Dominion Review ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21152A1722021-09-0707 September 2021 NRC to Fws, NRC Issuance of Draft Environmental Impact Statement for North Anna Subsequent License Renewal, Opportunity for Public Comment, and Endangered Species Act Determinations ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21225A5512021-08-13013 August 2021 Discussion Point for Public Meeting Regarding Fire Protection Piping Cyclic Loading - Transmittal E-mail ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21154A0152021-06-0101 June 2021 NRR E-mail Capture - Acceptance Review for Primary Grade Water LAR (L-2021-LLA-0082) ML21140A3682021-05-20020 May 2021 Response to North Anna Hardship (Temporary Staff Guidance Additional Guidance for FOF Inspections During the PHE) 2024-04-15
[Table view] |
Text
Rivera-Ortiz, Joel From: Fletcher, Cecil Sent: Wednesday, September 14, 2011 10:04 AM To: Murphy, Emmett; Karwoski, Kenneth Cc: Murphy, Martin; Rivera-Ortiz, Joel
Subject:
RE: Planned Inspections for North Anna Unit I Emmett, You bring up some interesting points. I will check into them and get back to you.
By the way, there is no 75% completion call set up at this point, between the licensee and NRR. Do you guys intend on having a call with them to discuss their results?
Cecil From: Murphy, Emmett Sent: Tuesday, September 13, 2011 5:22 PM To: Karwoski, Kenneth; Fletcher, Cecil Cc: Murphy, Martin
Subject:
RE: Planned Inspections for North Anna Unit 1 Cecil, I work in the Steam Generator and Chemical Engineering Branch, NRR. In terms of what you might be looking for, you might want to have a good look at their degradation assessment supporting this SG inspection. In particular, you might want to review the justification for inspecting SG Aas opposed to one or more of the others. Inspecting one SG for each unit seems reasonable if the U-bend planes are parallel for all three steam generators. It's not clear from information available to me that this is the case. Are they? The steam generators, including the tube bundles are not axi-symmetric. For example, the tubes are supported by AVBs normal to the plane of the u-bend. So, depending on the ground motion, the tube bundles of the different SGs may respond differently depending on how each SG is oriented relative to the ground motion. If the plane of the u-bends are not parallel among the three SGs, has this been evaluated such that SG A is concluded to have the most limiting orientation? If not, one might argue they should look at the other SGs as well. Also, a major focus of their inspection should be on whether there are any deltas in signal response compared to the most recent inspection. Widespread, noticeable deltas might also call into question whether additional SGs should be inspected.
From: Karwoski, Kenneth Sent: Saturday, September 10, 2011 9:59 AM To: Fletcher, Cecil Cc: Murphy, Emmett; Murphy, Martin
Subject:
Re: Planned Inspections for North Anna Unit 1 Cecil, This looks reasonable to me.
If anything comes out of these inspections, let us know.
Thanks, Ken Information in this record was deleted in accordance with .e Freedom of Informationj----
ACt an--i- t, I
From: Fletcher, Cedil To: Karwoski, Kenneth Sent: Sat Sep 10 09:32:22 2011
Subject:
FW: Planned Inspections for North Anna Unit 1 Ken, Due to the recent earthquake and subsequent events at NA, they have decided to perform eddy current on one SG in Unit 1 to ensure integrity prior to startup and I will be performing the SGISI for SG A only.
Their planned inspections are in the email just below.
Is there anything outside of the normal items that I should be paying particular attention to?
Cecil
"' Sent: Friday, September 09, 2011 7:32 AM To._ece.CclIt()6 °mi°
- foCc:J(b)(6) t~ )6 - ] 1(b)(6) 1()6 ,I(b)(6 =
Subje-t: Planned Inspections for Nort Anna unit .
Cecil, Below I've identified the scope of inspections to be performed on Steam Generator A in Unit 1 at North Anna Power Station during the period September 10 through September 17. I also provided a brief description of our inspection schedule. The degradation assessment is currently out for review and comments and will be ready for your review next week.
Tony SG "A" ONLY The primary side work scope is defined to include:
- i. There will be no visual inspection for evidence of leakage of previously installed plugs in the hot and cold legs since there are no installed plugs.
ii. Bobbin coil inspection of the full length of all tubes in service, except for the U-bend region of Row 1 tubes.
iii. Rotating coil inspection of the U-bend region of all Row 1 tubes in service (approximately 98 tubes).
iv. Rotating coil inspection of the hot leg top of tubesheet region (TSH +3 to TSH -3) of 993 tubes. The tubes selected for inspection will include a 50% sample of tubes in the defined special interest areas as shown in the Dominion Outage Plan documents.
2
- v. Rotating coil inspection of the cold leg top of tubesheet region (TSC +3 to TSC -3) of 570 tubes.
vi. Rotating coil inspection of 100 additional locations of interest as defined by Dominion.
The secondary side base scope work includes:
- i. SSI/FOSAR at the top of the tubesheet if possible loose parts are detected by ECT ii. Visual inspection of the internal blowdown piping and wrapper supports at the top of the tubesheet.
iii. steam drum visual inspection iv. 7th TSP visual inspection
- v. J-nozzle visual inspections The primary work scope is scheduled to begin on Saturday September 10 mid day and end on Saturday September 17. We will have a common day off on Sunday September 11 and we are only running 1 robot. Bobbin inspections will last about 3 to 31/2 days and RPC exams will last another 3 to 3 1 days. Dependent on having no equipment issues we should finish by the end of that week.
(b)(6)
North Anna Power Station Mineral, Virqinia 23117 il(b)(6) _ ___/
_P@qer](b)(6)
[(b)(6) ff Dom.com.
CONFID TIALIT OTICE- his electronic ssage contain formation wWh may be I ally confide al and/or vileged a does not in any ase represent irm ENERGY OMMODI bid or offer relati thereto w ch binds e sender withou additional e ress written c firmation t hat effect. Th info tion is' tended so y for the indivi al or entity n ed above and cess by any ne else is up thoaize .if ar ot the intended ecipient, any d closure, copyi , distributio, or use of the ontents you f this in mation is rohibited and ybe unlawful. you have rec ved this elec onic transmis *on in err please ply imnae tely to the sen r that you hay eceived the ssage in error and delete it. ank yo 3