Response to NRC Request for Additional Information (TAC No. ME6093) License Amendment Request for Slave Relay Testing Intervals
ML12039A149
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/27/2011
From: Wesolowski M
Westinghouse
To: Martin R
Office of Nuclear Reactor Regulation
References
LTR-EMPE-11-209, Rev. 2, TAC ME6093
Download: ML12039A149 (1)


Text

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company.

  • Westinghouse Nuclear Services Engineering Services 1000 Westinghouse Drive New Stanton, PA 15672-9606 USA R. E. Martin, Senior Project Manager Direct tel: 724-722-5797 U. S. Nuclear Regulatory Commission Direct fax: 724-722-5495 Washington, DC 20555-0001 e-mail: wesoloma@westinghouse.com Our ref: LTR-EMPE-11-209, Rev. 2

Subject:

RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION (TAC NO. ME6093) License Amendment September 27, 2011 Request For Slave Relay Testing Intervals

Dear Mr. Martin:

Westinghouse Electric Corporation sold its Distribution and Control Business Unit (DCBU) to Eaton Corporation effective as of February, 1 1994. The assets of the former business unit, that included the former Westinghouse AR relays, were transferred to Cutler-Hammer, a subsidiary of Eaton Corporation. Westinghouse, and later CBS, entered into Technology Transfer and Supplier and Vendor agreements in 1994. Within the terms of those agreements, Westinghouse retained the rights to sell certain original safety-related DCBU products to the nuclear power industry.

Subsequent agreements have remained in effect since that time.

Westinghouse Electric Company retains ownership of all original equipment qualification testing and qualification documents for products provided by DCBU. Through the various agreements, Westinghouse Electric Company also has access to design drawings and documentation related to, but not limited to, the AR relays. These documents, as well as any required further testing, are the basis for the Westinghouse Commercial Dedication process for AR relays. Westinghouse commercially dedicates the Cutler-Hammer AR relays at its Nuclear Parts Operations (NPO) facility in New Stanton, PA. The commercial dedication process confirms that the relays meet the qualified design requirements and critical characteristics.

In summary, Westinghouse NPO procures commercially manufactured AR relays from Cutler-Hammer and dedicates them for 1E Safety Related application under the Westinghouse IOCFR50 Appendix B program for the nuclear industry.

If you have any questions, please feel free to contact me.

Yours sincerely, M. A. Wesolowski, Senior Engineer**

NPO/Electro-Mechanical Product Engineering Reviewer: *P. M. Kushnar, Principal Engineer**

NPO/Electro-Mechanical Product Engineering cc: Mr. John M. Garza (JGARZA@scana.com)

SCE&G / VC Summer Nuclear Station Electronically Approved Records are Authenticated in the Electronic Document Management System

©2011 Westinghouse Electric Company LLC All Rights Reserved