MONTHYEARW3F1-2011-0041, Request for Alternative to ASME IWE-5221 Re Post Repair Testing of Steel Containment Vessel Opening2011-07-27027 July 2011 Request for Alternative to ASME IWE-5221 Re Post Repair Testing of Steel Containment Vessel Opening Project stage: Request ML1122318272011-08-11011 August 2011 Acceptance Review Email, Request for Alternative W3-CISI-002 to ASME Code, Section XI, IWE-5221 for Post-repair Testing of Steel Containment Vessel Opening, Third 10-Year Inservice Inspection Interval Project stage: Acceptance Review ML1133301372012-01-0404 January 2012 Request for Alternative W3-CISI-002 to ASME Code, Section XI, IWE-5221 for Post-repair Testing of Steel Containment Vessel Opening, Third 10-Year Inservice Inspection Interval Project stage: Other ML1203705492012-01-23023 January 2012 Notes for Proposed Corrections to NRC Safety Evaluation Dated January 4, 2012 for Waterford Alternative to ASME IWE-5221 Project stage: Other ML1203705362012-01-23023 January 2012 Correction to NRC Safety Evaluation for Scv Hatch Repair Project stage: Other ML1203705312012-01-23023 January 2012 Email Correction to the January 4, 2012 SE for Request for Alternative to ASME IWE-5221 Regarding Post-Repair Testing of Steel Containment Vessel Opening Project stage: Request ML1205807562012-04-0303 April 2012 Correction to 1/4/2012 Safety Evaluation, Request for Alternative W3-CISI-002 to ASME Code, Section XI, IWE-5221 for Post-repair Testing of Steel Containment Vessel Opening, Third 10-Year Inservice Inspection Interval Project stage: Approval 2012-01-23
[Table View] |
Text
From:
BENNETT, STEVE A [sbenne2@entergy.com]
Sent:
Monday, January 23, 2012 3:16 PM To:
Kalyanam, Kaly Cc:
STEELMAN, WILLIAM J
Subject:
Correction to NRC Safety Evaluation for Waterford Containment SCV Hatch Repair Attachments:
Page Correction to NRC SE on W-3 IWE-5521.pdf; Notes for Corrections to NRC SE of 1-4-12.doc
- Kaly, The NRC issued a Safety Evaluation dated January 4, 2012 for the Waterford ASME Code Alternative to IWE-5521. However, in review of the SE there are several statements that do not represent the Waterford steel containment hatch design or Code Alternative Request. I am providing a markup of the SE pages as well as an explanation of the concerns. Entergy believes that these statements should be revised to allow Entergy to appropriately use the Code relief. Let me know if you have any questions.
Thanks Steve A Bennett Office: 479-858-4683 Cell: 479-970-5875