DRAFT REQUEST FOR ADDITIONAL INFORMATION (RAI)
LICENSEE AMENTMENT REQUEST RELOCATION AND CHANGES TO SNUBBER TECHNICAL SPECIFICATION (TS)
SURVEILLANCE REQUIREMENTS DOMINION NUCLEAR CONNECTICAL, INC MILLSTONE POWER STATION UNIT 2 (MPS2)
DOCKET NO. 50-336 (TAC NO. ME7221)
References:
- 1. Dominion Nuclear Connecticut, Inc. (Dominion), letter to NRC, Licensee Amendment Request (LAR) to Revise Snubber Surveillance Requirements, for Millstone Power Station, Unit 2, Docket No. 50-336, dated September 21, 2011(Agencywide Documents Access and Management System (ADAMS) Accession No. ML11270A051).
- 2. Millstone Power Station Unit 2 (MPS2), Fourth 10-year Interval Inservice (ISI) Inspection Program and Associated Proposed Alternatives and Relief Requests, July, 2010 (ADAMS Accession No. ML102580204).
- 3. Millstone Power Station Unit 2, Fourth 10-Year Interval Inservice Inspection Program, August 5, 2010 (ADAMS Accession No. ML102220527).
In Reference 1, Attachment 1, Page 1 of 7, Section 3.0, Background, the first paragraph states that MPS2 is currently in fourth 10-year ISI interval. The fourth 10-year interval at MPS2 began on April 1, 2010 (References 2 and 3). Currently, snubber testing and examination are performed in accordance with the specific requirements of Technical Specification (TS) 3/4.7.8 and the requirements contained in American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), 2004 Edition. On Page 1-16, Section 1.8.25 and Page 2-34, Note 4, of References 2 and 3, it is noted that the snubber examination and testing of snubbers is performed in accordance with the 2004 Edition of the ASME OM Code, ISTD.
RAI 1
Please state whether examination and testing of snubbers is performed per TS 3/4.7.8 and the ASME OM Code requirements as described in Reference 1 or only in accordance with ASME OM Code, ISTD requirements as noted in References 2 and 3. If MPS2 is performing examination and testing of snubbers per TS 3/4.7.8 and the ASME OM Code, please explain how Dominion is meeting both sets of requirements at MPS2.
RAI 2
of Reference 1 contains the MPS2 Snubber Program, Rev. 0, dated July 21, 2011. Please indicate what snubber program was being used at MPS2 from April 1 through July 21, 2011, and provide a copy of this snubber program, if it is different than.