UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 27, 2012 Mr. Joseph W. Shea Manager, Corp. Nuclear Licensing Programs Tennessee Valley Authority 1101 Market Street, LP 4B-C Chattanooga, TN 37402-2801
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT
Dear Mr. Shea:
In a letter dated July 7, 2011, your staff responded to Regulatory Issue Summary 2011-04 and requested we schedule initial license operator examinations for Sequoyah Nuclear Plant.
Based on your letter and following discussions with your staff, we have scheduled the requested examinations as follows:
Plant / Station 2012 2013 Date Applicants Date Applicants Sequoyah 12/3 16 5/13 15 n/a n/a 12/2 16 On-site validation of the examinations is typically scheduled to occur approximately three weeks before each examination. If you have a need to change the dates of your scheduled exam(s) from that (those) listed above, please inform us in writing of your request and the reason for the change. Due to the large number of examinations scheduled to be administered at Region II sites, requests to change examination dates will be considered on a case-by-case basis. We will confirm any change in examination schedule with a follow-up letter.
We understand that your staff will develop the proposed examinations. For examinations that have greater than nine applicants, each examination is scheduled for a minimum of two weeks.
If the number of applicants is reduced to less than ten (10) for any examination, please inform us as this will impact the examination schedule.
TVA 2
A supplementary letter will be sent to each stations training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner=s name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates. If you have any questions concerning this information, please contact Mr. Malcolm Widmann, Chief, Operations Branch I, at 404-997-4550 or Mr. Mark Franke, Chief, Operations Branch II at 404-997-4436.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC=s public Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Joel T. Munday, Director Division of Reactor Safety Docket Nos.: 50-327, 50-327 License Nos.: DPR-77, DPR-79 cc: (See page 3)
__ML120300544_______________________
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA RA NAME M Bates MWidmann M.Franke J Munday DATE 1/26/2012 1/26/2012 1/26/2012 1/27/2012 1/ /2012 1/ /2012 1/ /2012 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3
cc:
J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution P. R. Simmons Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution G. M. Cook Manager Licensing Sequoyah Nuclear Plant Electronic Mail Distribution C. D. Mackaman Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution County Mayor Hamilton County Hamilton County Courthouse 208 Courthouse 625 Georgia Avenue Chattanooga, TN 37402-2801 Tennessee Department of Environment &
Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243 Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624 Ann Harris 341 Swing Loop Rockwood, TN 37854 Tennessee Valley Authority ATTN: Ms. Coleen Ware Training Manager Sequoyah Nuclear Plant P. O. Box 200 Soddy-Daisy, TN 37384-2000
TVA 4
Letter to Joseph W. Shea from Joel T. Munday dated January 27, 2012.
SUBJECT:
CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS FOR SEQUOYAH NUCLEAR PLANT Distribution:
C. Evans L. Douglas OEMAIL V. McCree L. Wert J. Munday H. Christensen M. Widmann M. Franke K. Schaaf J. Vincent J. Kirby S. Shaeffer J. McHale RIDSNRRDIRSIRIB Resource Document Control Desk - Licensing RIDSNRRDIRS PUBLIC R. Pascarelli, NRR ((Regulatory Conferences Only))
RidsNrrPMSequoyah Resource