ML12027A234

From kanterella
Jump to navigation Jump to search
National Resources Defense Counsel (NRDC) Combined Opposition to Motions to Strike
ML12027A234
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 01/27/2012
From: Fettus G, Roisman A
National Legal Scholars Law Firm, PC, Natural Resources Defense Council
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21808, 50-352-LR, 50-353-LR, ASLBP 12-916-04-LR-BD01
Download: ML12027A234 (25)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )

)

EXELON GENERATION COMPANY, LLC ) Docket No. 50-352-LR

) Docket No. 50-353-LR (Limerick Generating Station, Units 1 and 2) )

January 27, 2012 (License Renewal Application)

NATURAL RESOURCES DEFENSE COUNSEL (NRDC)

COMBINED OPPOSITION TO MOTIONS TO STRIKE INTRODUCTION On November 22, 2011, the Natural Resources Defense Council (NRDC) filed its Petition to Intervene and Notice of Intention to Participate (Petition), proposing four contentions. The four contentions were fully and adequately supported by bases and supporting evidence, including a Technical Declaration submitted by three NRDC experts supporting Contention 1-E, 2-E and 3-E and a separate expert Declaration by Christopher Paine supporting Contention 4-E.1 In response Exelon filed its Answer Opposing NRDCs Petition to Intervene (Dec. 20, 2011) and the Nuclear Regulatory Commission Staff (NRC Staff) filed its Answer to Natural Resource [sic] Defense Council Petition to Intervene and Notice of Intention to Participate (Dec. 21, 2011). These Answers totaled 126 pages and, as noted in NRDCs Combined Reply to Exelon and NRC Staff Answers to Petition to Intervene (Combined 1

NRDC also submitted Declarations in support of its standing to participate, an issue not in controversy.

1

Reply), dated January 6, 2012, a substantial portion of those 126 pages raise arguments that primarily address the merits of NRDCs contentions rather than their admissibility. Combined Reply at 2.

In its Combined Reply, NRDC addressed arguments raised by Exelon and NRC Staff in their answers, rebutting factual and legal assertions advanced by them. The Commission has held that [r]eplies must focus narrowly on the legal or factual arguments first presented in the original petition or raised in the answers to it. Nuclear Mgmt. Co., LLC (Palisades Nuclear Plant), CLI-06-17, 63 NRC 727, 732 (2006)(emphasis added). It has also held [n]ew bases for a contention cannot be introduced in a reply brief. Id. Although the Motions to Strike assert that these restrictions have been violated, as the following discussion makes clear, Exelon and NRC Staff either misrepresent or misperceive NRDCs Combined Reply and misapply the Commissions precedents. NRDCs Reply did not seek to add bases to its Contentions and the objections raised in the Motions to Strike, even if valid - which they are not - object to the addition of supporting evidence. As explained below, these additions, which are not required to make the Contentions admissible, were necessitated by the Answers which raised challenges to the merits of the Contentions and their bases.

The underlying rationale for restrictions on the scope of a Reply is one of fairness to the other parties. Palisades, CLI-06-17, 63 NRC at 732. However, where, as here, the other parties stray far beyond the narrow scope of permissible Answers to challenge not merely the admissibility of a contention, but the underlying factual and legal support for the contention, a Petitioner may, as has NRDC in this case, respond as a matter of fairness to those challenges by meeting factual and legal misstatements with factual and legal accuracy.

2

We have included, as Attachment 1, a Table that expands upon the Table provided by Exelon in its Motion. Exelon Motion to Strike (Exelon Motion) at 5-9. The expanded Table demonstrates the appropriateness of NRDCs Reply by identifying arguments in the Reply that were already raised in the Petition to Intervene and focuses on arguments on the merits advanced in the Answers to which the Reply responds. Contrary to the arguments advanced in the Motions to Strike, the Reply does not seek to present new support for the Petition to Intervene, except to the extent it responds to challenges on the merits to the proposed contentions, but rather focuses on arguments already made in the Petition to Intervene or arguments advanced in the Answers and rebuts them. Each challenged portion of the NRDC Reply directly rebuts an assertion made in the Answers or is an argument already advanced in the Petition to Intervene.2 LEGAL FRAMEWORK The issue before the Atomic Safety and Licensing Board is whether NRDCs four Contentions are admissible. Their admissibility depends upon compliance with the requirements 2

Had the Answers been limited to assertions that the Proposed Contentions, Bases and Supporting Evidence failed to meet the requirements of 10 C.F.R. § 2.309(f)(1), NRDCs Reply would have been limited to citing to its Petition to Intervene and arguing why it met the regulatory standards. However, once the Answers began to challenge the substance of the statements and declarations contained in the Petition to Intervene, essentially to join issue with the statements and declarations, NRDC had every right to rebut those challenges. The situation is analogous to Motions to Dismiss under Rule 12(b)(6) of the Federal Rules of Civil Procedure where a movants attempt to address the merits of the allegations in the Complaint converts the Motion into a Summary Judgment Motion. See e.g. Camp v. Brennan, 219 F.3d 279, 280 (3d Cir. 2000)(Because the district court went beyond Camps Complaint (as do we) to consider the evidentiary matters just discussed, any Fed. R. Civ. P. (Rule) 12(b)(6) attack is converted into one under Rule 56.) Without any disclosures of documents and prior to a ruling on the admissibility of contentions, it is premature to even consider Summary Disposition but to the extent the Answers raise factual disputes, NRDC is entitled to Reply.

3

of 10 C.F.R. § 2.309(f)(1). The most relevant of those requirements, to the Motions to Strike, are

§§ 2.309(f)(1)(i)(ii) and (v) since the thrust of the Motions is an allegation that NRDC used its Reply to either bolster inadequate bases or inadequate supporting evidence. However, the Motions ignore the well-established principles that govern admissibility of contentions:

An admissible contention must include not only a specific statement of the issue of law or fact to be raised or controverted, but also a brief explanation of the basis for the contention. When the contention admissibility standards were revised in 1989, the Commission commented that a petitioner must provide some sort of minimal basis indicating the potential validity of the contention. This brief explanation of the logical underpinnings of a contention does not require a petitioner to provide an exhaustive list of possible bases, but simply to provide sufficient alleged factual or legal bases to support the contention.

Determining whether a contention is adequately supported by a concise allegation of the facts or expert opinion is, however, distinct from what is required to support the petitioner's case at a hearing on the merits. The petitioner does not need to prove its contention at this stage in the proceeding. While the petitioner must present adequate support and demonstrate a genuine issue of material fact, the amount of support required to meet the contention admissibility threshold is less than is required at the summary disposition stage. And, as with a summary disposition motion, a Board may appropriately view Petitioners support for its contention in a light that is favorable to the Petitioner.

Northern States Power Co. (Prairie Island Nuclear Generating Plants Units 1 and 2), LBP-08-26, 68 N.R.C. 905, 915 and 917 (2008) (footnotes and citations omitted). NRDCs Petition to Intervene and proposed contentions fully meet these standards. However, in their Answers to the Petition to Intervene, Exelon and NRC Staff went beyond a challenge to NRDCs compliance with these admissibility standards and challenged the underlying merits of the alleged bases and supporting evidence. Those Answers warranted NRDC elaborating on supporting evidence for 4

its contentions. NRDC did not elaborate on the bases for any of its contentions. This distinction was ignored by the Motions to Strike which repeatedly referred to NRDCs elaboration of its supporting evidence as attempts to add to the bases for the contentions. See, e.g. NRC Staff Motion at 1-2. This is not merely a semantic disagreement since, if NRDC sought to expand bases, but not supporting evidence, it would arguably have to demonstrate compliance with 10 C.F.R. § 2.309(c). However, there is no restriction on expanding on supporting evidence without having to seek leave under § 2.309(c), a policy that makes eminent good sense given both the automatic disclosure requirements of 10 C.F.R. § 2.336 and the unwieldy pleadings that would occur should a motion have to be filed every time new information became available to an intervenor. In addition, NRDC does not need additional supporting evidence for its Contentions, which were adequately supported in the initial Petition to Intervene.

However, it is apparent that Motions to Strike have become de rigeur for applicants and NRC Staff seeking to exclude contentions from licensing hearings. But their proliferation is no justification for the filing of them where there is no substantial basis for the allegations used to support the motion. In all but a few cases, such motions are either deemed moot because the contentions are admissible or inadmissible without regard to whether allegedly objectionable material in the reply is considered, or are granted, only with regard to attempts to add additional declarations in support of the contentions or seeking to add new contentions. See, e.g. Luminant Generation Company, LLC (Comanche Peak), LBP-09-17, 70 N.R.C. 311, 324 (2009); Northern States Power Co. (formerly Nuclear Management Company, LLC) (Prairie Island Nuclear Generating Plant, Units 1 and 2) LBP-08-26, 68 N.R.C. 905, 922 (2008).

In this case, the Motions to Strike are baseless. The Motions either (1) ignore clear 5

evidence that the Reply legitimately elaborated on a matter raised in the initial Petition to Intervene and Declarations or (2) responded to an argument presented in the Answers. Neither Answer merely rested on an assertion that the Proposed Contentions failed to include the relevant bases or supporting evidence. Rather, each Answer went on to seek to demonstrate that NRDC was wrong, on the merits, when it asserted a basis or offered supporting evidence. Having eschewed a narrow attack in favor of a wide ranging challenge, neither Exelon nor NRC Staff have a legitimate basis to object when NRDC joins issue on the merits of that attack.

ARGUMENT3 I. The Motion to Strike Portions of the Reply Related to Contentions 1 and 3 Have No Merit Exelon complains that NRDC did not specifically cite the provisions of the Administrative Procedure Act when it noted the fact that the legal status of the 1989 SAMDA had never been adjudicated (Petition to Intervene at 31, n. 9) and thus NRDC should be prohibited from including that citation in response to Exelons assertion that the Statement of Considerations accompanying the 1996 License Renewal Environmental Regulations were essentially incorporated into 10 C.F.R. § 51.53(c)(3)(ii)(L). Exelon Answer at 18-19. However, 3

Although Exelon raises a couple of complaints about NRDC's Reply as it relates to Contentions 1-E and 3-E, the bulk of its challenge is to NRDC's Reply with regard to Contention 4-E. NRC Staff devotes all of its objections to the Contention 4-E Reply. Since NRC Staff's objections to portions of the Reply are essentially the same as those raised by Exelon, this pleading addresses the arguments raised by Exelon and uses an expanded version of its Table to illustrate the failings of both Motions. See Attachment 1. NRDC's response to the Motion to Strike the Contention 1-E and 3-E Reply is included in the Table and briefly discussed below.

Responses to the Motions to Strike the Contention 4-E Reply are also included in the Table. A more extended discussion is warranted because the Motions seriously distort that Contention.

6

for the first time in its Answer4, Exelon argued that 10 C.F.R. § 51.53(c)(3)(ii)(L) not only established a general rule but explicitly applied that rule to Limerick. NRDC had no need to address the issue unless, and until, Exelon and/or NRC Staff argued that a portion of the statement of considerations for a regulation acts to amend the language of the regulation itself.

Exelon asserts that NRDC in its Reply argued for the first time that the collective radiation dose of the population within 10 miles of the plant was significant because the close-in population would be more vulnerable. Exelon Motion at 5. Exelon ignores the first basis asserted for Contention 1-E that stated the ER misinterprets and/or misuses new information regarding increased population in the area within 10 miles of the plant and thus fails to account for the significant increase in total person-rems of exposure that could occur in the event of a severe accident . . . thus the ER substantially understates or fails to analyze the potential adverse impact in terms of person-rems of collective exposure from a severe accident at Limerick.

Petition to Intervene at 16.

Finally Exelon asserted that NRDC added a new regulatory citation in support of Contention 3-E in its Reply when it referenced 10 C.F.R. 51.53(c)(3)(iii). Exelon Motion at 6.

Exelon ignores the fact that Contention 3-E incorporated by reference the deficiencies identified in Contention 2-E as supporting Contention 3-E. Petition to Intervene at 31. Contention 2-E alleged, inter alia, that the 1989 SAMDA analysis was deficient because it fails to comply with 10 C.F.R. §§ 51.45, 51.53(c)(2) and 51.53(c)(3)(iii). Petition to Intervene at 19.

4 Although Exelon references Federal Register issuances in its ER (see e.g. ER at 1-2, 1-3 and 3-22) it never cites the Federal Register for the proposition that the Commission has specifically exempted Limerick from SAMA requirements. See ER at 4-49 and 5-4 to 5-9.

7

II. The Motions to Strike Portions of The Reply Related to Contention 4-E Have No Merit A. Contention 4-E is Admissible Contention 4-E is a contention of omission. It is a contention of omission because in place of a dedicated discussion of the No Action Alternative, the ER incorporates by reference the results of its tightly circumscribed consideration of alternatives for central station power generation to replace Limerick, based on assumptions that are inappropriate for consideration of the No Action Alternative. As NRDC noted in its original filing the Applicants Environmental Report (§ 7.2) Fails to Adequately Consider the No Action Alternative in Violation of 10 C.F.R.

§§ 51.45 (c), 51.53(c)(2) and 51.53(c)(iii)[sic].5 Petition to Intervene (Contention 4-E) at 23 (emphasis added). Both the Contention and the supporting Expert Declaration of Christopher Paine identified in the first instance fundamental deficiencies in Exelons No Action Alternative analysis and reference the GEIS:

! the ER unreasonably misapplies NRC guidance from the 1996 Generic Environmental Impact Statement (GEIS) that limits the set of reasonable alternatives for meeting a defined generating requirement to analysis of single, discrete electric generation sources. (GEIS, 1996, cited at ER, 7-2). Paine Declaration at 2-3.

! the required NEPA consideration of No Action cannot reasonably be equated with replacing the generating capacity of LGS, or limited to an analysis of this particular problem. Paine Declaration at 3.

! Unlike consideration of reasonable alternatives to meet the defined generating requirement represented by a particular baseload nuclear power plant, mandatory consideration of the environmental impacts of the No Action Alternative -- defined as a decision not to relicense LGS Units 1 and 2 -- necessarily involves making an informed projection of the likely 5

As NRC Staff helpfully noted (NRC Staff Motion at 40, n. 77), this last citation was a typo and should have been 51.53(c)(3)(iii).

8

portfolio of PJM electricity system resources available in the region served by LGS beginning 13 years and 18 years hence that could reasonably be expected to supply the energy services currently supplied by LGS. These reasonably foreseeable system resources include all forms of Demand Side Management (DSM), waste heat co-generation, combined heat and power, and distributed renewable energy resources, in addition to the single, discrete electric generation sources reviewed by the Applicant as reasonable alternatives to extended operation of Limericks base load capacity. Paine Declaration at 3-4.

! The ER violates 10 C.F.R. § 51.53(c) by failing to thoroughly consider the environmental impacts and likely consequences under the No Action alternative of denying relicensing now, 13 years before the existing license for Limerick 1will expire and 18 years before the existing license for Limerick 2 will expire, including the expected growth in demand side management and renewable energy sources, and fails to quantify and balance the environmental costs of those consequences against the environmental costs of relicensing the Limerick reactors, including the properly analyzed cost of a severe accident. Petition to Intervene at 24.

Thus, the core of Contention 4-E, which Staff and Exelon generally did not address in their Answers, is that (1) the ER does not even attempt to justify its claim that the alternatives it considers in the alternatives analysis portion of the ER represent the reasonably likely consequences if the No Action Alternative were adopted; and (2) the ER improperly limits its evaluation of the No Action Alternative by the following statement:

Unless replacement generating capacity is provided as part of the no-action alternative, a large amount of base-load generation would no longer be available, and the alternative would not equivalently satisfy the purpose and need for the proposed action. For this reason, the no-action alternative is defined as having two componentsreplacing the generating capacity of LGS and decommissioning the LGS facility. (ER at 7-3)

This was cited in the Paine Declaration at 3. In short, NRDC contends that limiting consideration of the No Action Alternative to replacing the generating capacity of LGS is illegal and violates NEPA and NRC regulations and distorts GEIS guidance.

9

Because Staff and Exelon Answers went beyond challenges to the fundamental bases for Contention 4-E, NRDC addressed issues on the merits rather than leave those inaccurate assertions unchallenged. The following discussion demonstrates how the scope of the Reply was within the permitted boundaries by either further development of arguments already advanced or responses to arguments on the merits raised in the Answers.

B. The Motions to Strike Misapprehend Contention 4-E

1. Exelon's Motion Misapprehends Contention 4-E The essence of Exelons challenge to Contention 4-E in its Answer was the erroneous assumption that NRDC is alleging that Exelon failed to include any discussion of renewable energy and DSM in its ER. Exelon Answer at 58 ([t]he contention also is inadmissible because the ER contains the very information regarding renewable energy resources and DSM that NRDC alleges is missing). The bulk of the Exelon Answer is focused on demonstrating that it did discuss these matters while ignoring the core of Contention 4-E. Specifically, the contention alleged that Exelon omitted consideration of likely consequences of license renewal denial other than creating alternative large scale generating capacity to meet the same energy needs met by Limerick. Further, even when Exelon discussed renewable energy and DSM, it did so by testing their feasibility against the assumed need to replace Limericks generating capacity with a similar large scale generating system.

Finally, as NRDC alleged, the ER analysis of the No Action Alternative, was focused wholly on replacing the generating capacity of Limerick, and thus omitted any consideration of the likely consequences of 13 to 18 years of lead time to prepare for Limerick shutdown. ER at 7-3 (the no-action alternative is defined as having two componentsreplacing the generating 10

capacity of LGS and decommissioning the LGS facility.) This distorted focus of the No Action Alternative and the omission of a proper discussion of the No Action Alternative caused by Exelons assumption that the only consequence of denial of license renewal would be replacing the generating capacity of Limerick, was one of the bases for Contention 4-E. Exelon also assumed that because it had some discussion of some renewable energy and DSM in its alternatives discussion, it had met its duty to evaluate the likely consequences of the No Action Alternative. NRDC challenged the omission of any evidence or analysis of the likely consequences of denial of license renewal. Rather than demonstrate where the ER had actually considered the likely consequences of denial of license renewal, which would have been a way to challenge Contention 4-E on the basis that the claim of omission was erroneous, Exelon choose instead to argue about the merits of its discussion of alternatives, claiming that its discussion of alternatives represented the necessary discussion of the likely consequences of license renewal denial, although that claim was never supported by any evidence or analysis. Thus, Exelon sought to convert Contention 4-E into a contention challenging the adequacy of the information presented rather than the omission of the necessary analysis of likely consequences. That line of argument by Exelon, which went beyond the scope of NRDCs contention of omission, necessitated NRDC addressing the merits of the alternatives analysis. Asserting that the ER contains the missing information, when it clearly does not, is the kind of merits arguments that must be answered.

2. Staff's Motion Misapprehends Contention 4-E In both the Motion to Strike and its Answer, NRC Staff misapprehends both Contention 4-E and the requirements for consideration of the No Action Alternative. NRC Staff asserted in 11

its Answer that Mr. Paine does not present a viable no-action alternative and does not support his claims. NRC Staff Answer at 50. But, as NRDC alleged, no action itself is the alternative and the analysis required is an assessment of the likely consequences that will follow if NRC rejects license renewal. Paine Declaration at 3-4. It is the ER that fails to provide a justification for its assertion that the alternatives it examined, including combined alternatives, are either viable or likely consequences of license renewal denial 13 to 18 years before Limerick would be shut down. It was never incumbent upon Mr. Paine, in a declaration supporting admission of NRDCs contention, to present the ER's missing analysis, but rather to draw attention to its absence, and to the legal requirement that it be provided.

NRC Staffs misapprehension of the issue then leads it to engage in an extended argument about why the electricity generation alternatives analyzed in the ER represent full consideration of what is required for the No Action Alternative analysis. NRC Staff Answer at 48-51. It is those arguments by NRC Staff and similar arguments by Exelon (Exelon Answer at 63-66) that led to NRDCs focus on the adequacy of the specific energy generation alternatives discussed in the ER. Without those arguments from Exelon and NRC Staff, NRDC would have rested its case on the central allegations that (1) Exelon failed to properly evaluate the consequences of the No Action Alternative because it arbitrarily assumed that if license renewal were turned down alternative central station generating capacity of equivalent scale would have to be provided and (2) Exelon failed to provide a rational analysis of why the results it alleged would occur if license renewal were denied - i.e. the reasonable alternatives scenarios for energy generation incorporated by reference - represent the likely consequences of denial of license renewal. The ER omitted an analysis of facts of this case, where 13 to 18 years of lead 12

time will exist before Limerick would actually have to shut down.

C. The Motions To Strike Should Be Denied Although Exelon and NRC Staff Answers assert that NRDC provided no support for its contention or bases, in fact the Declaration of its expert, Christopher Paine and the cited statutory and regulatory provisions, provided ample support. Mr. Paines analysis was anything but speculative. First, he pointed to the ER discussion of alternatives and the DSM to illustrate the limitations of the ER discussion of the likely consequences of the No Action Alternative. Paine Declaration at 3-4. Then he noted that the ER failed to provide a discussion of the likely consequences of the No Action Alternative and thus the ER failed to provide a basis to justify Exelons assumption that the alternatives it analyzed would be likely to be adopted should license renewal be rejected 13 to 18 years before Limerick would be shut down. Id. at 2-3; see also NRDC Petition at 24.

The ER does not include an analysis of the likely outcome in the event that license renewal is denied. Rather, it treats selected energy generation technologies as alternatives to license renewal, assuming that continuing the Limerick electric output was essential, without ever justifying the assumption that if license renewal were denied, use of those alternatives would be the likely result. As noted above, NRDC focused its Petition to Intervene and the Paine Declaration on this failure of the ER and relied on 10 C.F.R. §§ 51.45 (c), 51.53(c)(2) and 51.53(c)(3)(iii) in support. It was when NRC Staff sought to use the GEIS, particularly Sections 8.1-8.3, which as Exelon correctly notes is only guidance and not binding (Exelon Answer at 69),

that NRDC particularly addressed those portions of the GEIS.

In its opposition to Contention 4-E Exelon focused on the fact that it had discussed some 13

energy alternatives and demand side management (DSM) in the ER and had cross-referenced them in the No Action Alternative discussion, making it appear that NRDC objected to cross-referencing. Exelon Answer at 63-69. However, Contention 4-E does not object to cross-referencing but rather to the ER insistence on evaluating the viability of renewable energy and DSM as alternatives to the meet the stated purpose of license renewal -- i.e. providing ongoing base load capacity -- when the issue urged in Contention 4-E is that this test is wrong, and that the No Action Alternative requires considering the consequences of no action, not alternatives to meet the alleged purpose of the proposed license renewal. NRDC support for this Contention was both the Paine Declaration and the reasoning - not any bald assertions - contained in that Declaration, and in the statutory and regulatory citations to both NRC and Council on Environmental Quality (CEQ) regulations as well as to NEPA.

The essence of the Motions to Strike portions of NRDCs Reply regarding Contention 4-E is that NRDC should have cited the specific provisions of the GEIS it referenced in its Reply as support for Contention 4-E, in its initial Petition to Intervene and Expert Declaration, even though NRDC had referenced the GEIS as an authority in support of Contention 4-E. Paine Declaration at 2-3, 7. NRC Staff quoted the ASLB for the proposition that boards do not sit to flyspeck environmental documents or to add details or nuances. Exelon Generation Company, LLC (Early Site Permit for Clinton ESP), CLI-05-29, 62 NRC 801, 811 (2005). NRC Staff Answer at 48. That sage observation applies with equal force to Motions to Strike which, at most, quibble with NRDCs failure to cite to specific provisions of the GEIS in its Petition and Declaration. We further note that NRC Staff cannot credibly claim to be surprised by NRDC citations to a document it had itself authored and repeatedly cited in its Answer, 14

Although Exelon asserts in its Motion to Strike that it was unaware of reliance on the GEIS to support Contention 4-E, even though NRDC referenced the GEIS with the same precision used by Exelon in its ER -- i.e. a general reference to the GEIS -- in fact Exelon knew exactly what NRDC meant and sought to rebut NRDCs reliance on the GEIS to support the view that DSM must be considered as a reasonable consequence of the No Action Alternative and not as an alternative to replace Limericks generating capacity. Reliance on the GEIS is not dispositive because the GEIS itself is clear that, as a guidance document, it carries no binding legal requirement with respect to the alternatives analysis . . . Exelon Answer at 69 (footnotes omitted). NRC Staff was more direct, devoting several pages to its interpretation of the meaning of the GEIS language regarding the No Action Alternative and relying on that language to challenge Contention 4-E. NRC Staff Answer at 44-51.

In both instances, Exelon and NRC Staff sought to challenge NRDCs Contention 4-E on the merits by arguing that it was acceptable to analyze the No Action Alternative in the manner used in the ER, as if the only choices were between replacing the base load capacity of Limerick or relicensing Limerick, ignoring an evaluation of the likely consequences of the No Action Alternative. For instance, although NRC Staff claimed [t]he no action alternative, denial of a renewed license, results in removal of base-load nuclear power from the grid and therefore likely requires other electric generating sources, power purchases, or conservation to replace it. See GEIS at 8.1, 8.2 (NRC Staff Answer at 46), it now asserts NRDC is barred from answering those misapplications of the cited GEIS sections in Reply. NRC Staff Motion to Strike at 5-9.

In its Reply, NRDC took issue with the assertions by Exelon and NRC Staff in their Answers regarding the adequacy of the ER discussion of alternatives and its alleged sufficiency 15

for purposes of the No Action Alternative analysis. NRDC challenged both the assertion that the GEIS provided support for (1) Exelons distorted perception of its responsibilities and (2) to Exelon and NRC Staff attempts to demonstrate that the truncated and unrealistic discussion of energy alternatives and DSM in the ER represented a discussion that met the requirements of 10 C.F.R. §§ 51.45 (c), 51.53(c)(2) and 51.53(c)(3)(iii).

Neither Exelon nor NRC Staff challenged NRDCs allegation that the ER is deficient because it narrowly confines the analysis of consequences of rejection of license renewal to adoption of large discrete energy generating alternatives. Additionally, neither Exelon nor Staff challenged NRDCs assertion that the ER is deficient for failing to provide an analysis of the likely consequences of denial of license renewal. Finally, neither party challenged NRDCs allegation that the ER discussion of the No Action Alternative fails to provide the NRC with sufficient data to aid the Commission in its development of an independent analysis. 10 C.F.R.

§ 51.45(c). Rather, Exelon and NRC Staff focused on the argument that the ER analysis of energy alternatives as substitutes for Limerick today was sufficient to meet NRCs NEPA requirements for alternative analyses, disregarding whether those analyses fulfilled the separate requirements for consideration of the No Action Alternative. NRDC has every right to confront these arguments on the merits. If NRC Staff and Exelon did not want NRDC to rebut its arguments, they should not have made merits arguments in the first instance, confining their Answers to the assertion that NRDC had failed to provide sufficient bases or supporting evidence for their contention. Apparently aware of the weakness of that argument, Exelon and NRC Staff went further and opened the door to the NRDC Reply.

16

CONCLUSION For all the reasons discussed supra the Motions to Strike should be denied.

Respectfully Submitted, s/ (electronically signed) s/(electronically signed)

Anthony Z. Roisman Geoffrey H. Fettus National Legal Scholars Law Firm, P.C. Natural Resources Defense Council 241 Poverty Lane, Unit 1 1152 15th Street, NW, Suite 300 Lebanon, NH 03766 Washington, D.C. 20005 603-443-4162 202-289-2371 aroisman@nationallegalscholars.com gfettus@nrdc.org Filed this 27th day of January, 2012 17

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing Natural Resources Defense Council (NRDC) Combined Opposition to Motions to Strike was served via the Electronic Information Exchange (EIE) on the 27th day of January 2012, which to the best of my knowledge resulted in transmittal of same to those on the EIE Service List for the captioned proceeding.

Administrative Judge Administrative Judge William J. Froehlich, Chair Michael F. Kennedy Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: william.froehlich@nrc.gov E-mail: michael.kennedy@nrc.gov Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: William.kastenberg@nrc.gov Chief Judge Roy Hawkens U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Office of the Secretary of the Commission Mail Stop: T-3F23 Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 hearingdocket@nrc.gov Roy.Hawkens@nrc.gov U.S. Nuclear Regulatory Commission Exelon Generation Company, LLC Office of Commission Appellate Adjudication 4300 Warrenville Road Mail Stop: O-16C1 Warrenville, IL 60555 Washington, DC 20555-0001 J. Bradley Fewell, Deputy General Counsel ocaamail@nrc.gov Bradley.Fewell@exeloncorp.com Morgan, Lewis & Bockius LLP Office of the General Counsel 1111 Pennsylvania Avenue, N.W. U.S. Nuclear Regulatory Commission Washington, DC 20004 Mail Stop O-15D21 Alex S. Polonsky, Esq. Washington, DC 20555-0001 apolonsky@morganlewis.com ogcmailcenter@nrc.gov Kathryn M. Sutton, Esq. Catherine Kanatas ksutton@morganlewis.com catherine.kanatas@nrc.gov 18

Brooke E. Leach Brian Newell bleach@morganlewis.com brian.newell@nrc.gov Maxwell Smith maxwell.smith@nrc.gov Mary Spencer mary.spencer@nrc.gov Ed Williamson edward.williamson@nrc.gov

/Signed (electronically) by/

Anthony Z. Roisman 19

ATTACHMENT 1 TABLE COMPARING PORTIONS CHALLENGED IN EXELON MOTION TO STRIKE WITH NRDC PETITION TO INTERVENE, NRDC DECLARATIONS AND ANSWERS

Location of New Information Exelons Description of New Information NRDCs Petition To Intervene and Exelon Answer NRC Staff Answer in NRDCs Combined Reply Declaration Contention 1-E These portions of the Combined Reply raise a new In the argument portion of the Petition to In its Answer Exelon asserted that the Staff made the same argument. NRDC

  • The text on page 19 beginning with legal argument that was not identified in the Intervene, but not in either the bases or statement in the GEIS Statement of replied to this assertion in the same By not notifying the public, through Petition. The Petition (at 2-3, 31) argued that the supporting evidence, NRDC noted the fact Considerations was a binding manner as it did to Exelon.

the parenthetical quote ending with 1989 SAMDA in the Limerick FES Supplement could that the legal sufficiency of the 1989 determination of the status of the 1989 provide interested persons an not be relied upon because it was not adjudicated, SAMDA had never been adjudicated. SAMDA. NRDC replied to this assertion, opportunity to comment. (Citations but NRDC did not provide any legal citation for this Reply at 2-3 and 31 n. 9. That fact is not raised for the first time in Exelons Answer omitted)) on page 20. argument. In the Combined Reply, NRDC seeks to disputed by Exelon or Staff. and not asserted in its ER, by arguing that bolster Contention 1-E by, for the first time, citing the SOC was not a binding determination the Administrative Procedures Act (APA) (5 U.S.C. because it failed to comply with the APA.

§§ 553(b), 554(b) and 554(c)(2)) as requiring That argument was only ripe when Exelon adjudication of the adequacy of the 1989 SAMDA to sought to use the SOC statement to avoid trigger the exception for Limerick under 10 C.F.R. § having to produce new and significant 51.53(c)(3)(ii)(L). Neither the Petition nor supporting information relevant to the 1989 SAMDA.

affidavits mentioned the APA or 5 U.S.C. § 553 or 554.

Contention 1-E These portions of the Combined Reply provide new A basis for Contention 1-E is that the ER

  • The text on page 23 beginning with information and arguments that were not identified misinterprets and/or misuses new But that argument misses and in the Petition. Contention 1-E raised arguments information regarding increased ending with understating the impact regarding the purported inadequacy of Exelons population in the area within 10 miles of of a severe accident. Id. population estimates in the 10-mile and 50-mile the plant and thus fails to account for the radius surrounding Limerick, but did not assert that significant increase in total person-rems collective dose would be more significant within 10 of exposure that could occur in the event miles of a nuclear reactor site than at other of a severe accident . . . thus the ER locations. NRDC cites to NRDC E Declaration at 22- substantially understates or fails to 30 for support, but those paragraphs of the analyze the potential adverse impact in Declaration do not provide support that the 10-mile terms of person-rems of collective radius is the most vulnerable zone. exposure from a severe accident at Limerick. Pet. at 16. The Reply reaffirmed that the mistake in population within ten miles results in substantially understating the collective exposures noting that since a significant component of the human exposure, i.e. collective dose, is expected within 10 miles of the plant, the key figure is the population within that 10 mile zone. Reply at 23.

Since the significant component of the dose is within 10 miles, it is the most vulnerable.

Contention 3-E This sentence of the Combined Reply provides a The legal argument supporting

  • The text on page 37 beginning with new argument and reference that was not identified Contention 3-E, specifically referenced all The applicable standard for in the Petition. Contention 3-E in the Petition (at 21- of the deficiencies identified in

application of the, including the 22) only alleged a deficiency to meet NEI-05-01 Rev. Contention 2-E. The deficiencies quotation of 10 C.F.R. § A; it did not discuss or reference 10 C.F.R. § identified in Contention 2-E, coupled with 51.53(c)(3)(iii), and ending with an 51.53(c)(3)(iii) as the legal standard for applying the the total failure to consider critical factors adequate analysis of severe accident Section 51.53(c)(3)(ii)(L) exception to Limerick. The that are essential for a valid consideration mitigation alternatives. supporting Declaration also fails to mention Section of mitigation alternatives, as set forth in 51.53(c)(3)(iii) to support Contention 3-E. Discussion Contention 3-E, provide ample basis to of Section 51.53(c)(3)(iii) was limited to Contention reject the 1989 FES Supplement as 2-E in the Petition meeting the NEPA standards. Pet. at 31.

Location of New Information Exelons Description of New NRDCs Petition To Intervene and Exelon Answer NRC Staff Answer in NRDCs Combined Reply Information Declaration Contention 4-E These portions of the Combined Reply NRDC made reference to the GEIS in Exelon Answer refers to Section 8.2 of The NRC Staff Answer references and

  • References to Section 8.2 of the GEIS in the provide new arguments and references support of Contention 4-E. The Paine the GEIS on pg. 68: The Board in Indian quotes from Sections 8.0, 8.1, 8.2 and 8.3 following sentences: to the GEIS to support Contention 4-E. Declaration cites the GEIS in his decl. on Point interpreted Section 8.2 of the GEIS of the GEIS.

o The last full sentence on page 53 beginning with When referring to the GEIS, the Petition pg. 7, and lists it as a Reference. Id. at 7. to mean that the No-Action alternative The GEIS outlines the necessary scope and (at 24) and the Paine Declaration (for must consider the markets response to The NRC Staff Answer references the GEIS ending on page 54 with in a manner that example, paragraph 4) limit their However, both Exelon and the NRC Staff denial of the license renewal application Sections 8.0 and 8.1 on page 42.

supports NRDCs contention. arguments to the GEIS guidance of cited and quoted from Sections in part 8 specifically, the possibility of increased o On page 55, the phrase but also fails to limiting an alternative to analysis of of the GEIS in their Answers. NRDCs energy conservation measures. On page 44, the NRC Staff Answer quotes consider . . . as called for in the GEIS. GEIS at 8-2. single, discrete electric generation Reply addressed this GEIS reliance and from Section 8.1 of the GEIS: To o The second to last full sentence on page 56 sources. They cite to no other portions demonstrated how Exelon and NRC Staff determine alternatives to license renewal, beginning with Moreover, in the case of no of the GEIS to support their arguments. were misapplying the GEIS. the GEIS defines the purpose and action and ending with the cite GEIS at 8-2 need of the action as providing an option (emphasis added). Contention 4-E, however, now In addition, Exelon and NRC Staff made that allows for power generation o On page 67, the last full paragraph, beginning references other portions of the GEIS. arguments on the merits in an attempt to capability beyond the with Finally and ending with several of them This includes the guidance that an defend the ER discussion of the no-action term of a current nuclear power plant are not. alternative be technically feasible and alternative which arguments were operating license to meet future system

  • References to Section 8.3 & 8.3.14 of the GEIS: commercially viable (GEIS, § 8.1), rebutted by NRDC by, in part, citation to generating needs o On page 57, beginning with In fact, the GEIS discussion of the No-Action Alternative portions of the GEIS. Exelon and NRC Staff as such needs may be determined by recognizes and ending with municipal solid (GEIS, § 8.2), preferred sets of attempted to justify the discussion of state, utility, or federal regulators. GEIS at waste combination would be the preferred set of alternatives (GEIS, § 8.3) and alternatives in the ER as fulfilling the 8.1 alternatives to replace a single nuclear plant. GEIS conservation technologies (GEIS, § obligation to consider the likely at 8-16; and the third and fourth full sentences 8.3.14). Contention 4-E, as initially consequences of the no-action alternative Also on page 44, the NRC Staff Answer on page 66 that discuss and contain references to proffered, nowhere mentions these and attacked NRDC for not challenging quotes from Section 8.2 of the GEIS:

Section 8.3 of the GEIS beginning with However, sections of the GEIS or otherwise quotes those specific discussions. Exelon Answer Accordingly, the GEIS identifies the no-as already noted and ending with and or references those sections of the GEIS at 61-63; NRC Staff Answer at 48-51, action alternative for license commercially viable.. on which NRDC now belatedly relies. However, Contention 4-E was not focused renewal as denial of a renewed license.

o On the bottom of page 69, references to and on the inadequacy of the analysis of the GEIS at 8.2.

discussion of Section 8.3.14 of the GEIS, beginning Furthermore, the Petition chosen alternatives but on the method by with: But this contravenes the findings of the unambiguously characterized which they were chosen - i.e. only On page 47 of the NRC Staff Answer, the GEIS ending with . . . nuclear plant(GEIS at Contention 4-E as a contention of alternatives that would meet the same GEIS Section 8.3 is quoted: As the GEIS 8.3.1.4).; and the last full sentence on page 71 omission (Petition at 31), and now need as Limerick and without any recognizes, the environmental impacts of beginning with The GEIS assumes and ending NRDC contends for the first time that consideration of whether they would alternative energy sources with . . . nuclear plant. GEIS at 8.3.14.. the ERs existing discussion of represent likely consequences of license such as those as analyzed in Section 8.3 of

  • General, new references to the GEIS: reasonable alternatives and demand- renewal denial. the GEIS are equally applicable to the no-o The phrase which is governed by other GEIS side management (DSM) contravenes action determinations on the top of page 57. the findings of the newly-cited alternative in that the alternatives o On page 70, the phrase and cited to portions of provisions of the GEIS. analyzed in this section are all possible the GEIS that Exelon failed to follow, and the last actions resulting from full sentence beginning with But, contrary to NRC denial of a renewed license.

Staffs and ending with No Action Alternative..

Location of New Information Exelons Description of New NRDCs Petition To Intervene and Exelon Answer NRC Staff Answer in NRDCs Combined Reply Information Declaration Contention 4-E These portions of the Combined Reply This objection is, at best, semantic. What Exelon Answer on page 52: And Exelon NRC Staff Answer at 44: Because denial

  • On page 55, the first full sentence beginning provide new arguments and the Paine Declaration said was that ER evaluated the environmental impacts of of a license renewal as a power with Items 1, 2, and 3 and ending with as information that were not identified in failed to make an informed projection of combinations of generation sources, generating capability may lead to a described in the GEIS; and the phrase but also the Petition. NRDC asserts for the first the likely portfolio of PJM electricity including combinations of renewable variety of potential outcomes, the GEIS fails to consider a combination of these different time in the Combined Reply that the ER system resources available in the region energy sources as reasonable alternatives states that the no-action alternative outcomes as called for in the GEIS. GEIS at 8-2, omitted discussion of combinations of served by LGS beginning 13 years and 18 by 2024. should include selection of other electric which discuss combinations of resources. the PJM energy portfolio and other years hence that could reasonably be generating sources to meet energy
  • The second to last full sentence on page 56 resources, and provides new facts as to expected to supply the energy services And in a footnote on page 57: Contrary demands or conservation measures beginning with Moreover, in the case of no what Exelon should have considered in currently supplied by LGS. Paine to NRDCs assertion, the power and/or decisions to import power, or a action and ending with the cite GEIS at 8-2 its ER. This is the first time NRDC has Declaration at 3-4 (emphasis added). generation alternatives considered in the combination of these different (emphasis added); and the sentence on page 57 raised the purported missing discussion There is no difference between a portfolio ER are not limited to single discrete outcomes. (Quotation marks as beginning with The GEIS goes on to postulate of combinations (other than a single of system resources and a combination of generation sources. See ER at 7-13 to 7- provided in the original) and ending with the cite GEIS at 8-16, which ambiguous reference in the Paine alternatives. The factual discussion in the 15 (considering several combinations of discuss combinations of resources under the No- Declaration to combined heat and Reply was responsive to Exelons attempt renewable energy sources as reasonable Action alternative. power), including DSM combined with to prove that it had considered alternatives).
  • The phrases combinations of and with conventional nonrenewable reasonable alternatives.

conventional nonrenewable technologies at the technologies. And this is the first time bottom of page 57. that NRDC argued facts related to other

  • The text on page 62 beginning (a) to comply factors that Exelon should have with existing PJM-area state renewable considered, such as evolution of gas mandates and ending with the word prices.

technologies on the top of page 63.

Contention 4-E These portions of the Combined Reply Contrary to these assertions, the

  • The first full paragraph on page 56, beginning provide new arguments and arguments are not new but respond to with While employing and ending with playing information that were not identified in contrary arguments by NRC Staff and a larger role in the future. the Petition. Contention 4-E as Exelon to the following statement in the .
  • The first full paragraph on page 61 beginning submitted in the Petition does not Paine decl. at pg.4: The ERs analysis of with In the introduction to its alternatives challenge any aspect of the ERs the No Action Alternative fails to consider analysis and ending with would do so. ER at p. 7- consideration of reasonable the environmental impacts of this 10.; and the second full sentence on page 65 alternatives, including the use of reasonably foreseeable portfolio of PJM beginning with On the contrary and ending with hypothetical scenarios. system resources, and thus fails to make not feasible and indeed, speculative, which the required comparison between the discuss the ERs use of hypothetical scenarios in its environmental impacts of No Action and alternatives analysis. the continued operation of LGS for an additional 20 years.

Pet. at 23: The ER violates 40 C.F.R. § 1502.14(d) and 10 C.F.R. Part 51, Subpart A, Appendix A, § 4, by improperly and illogically narrowing discussion of the No Action alternative

Location of New Information Exelons Description of New NRDCs Petition To Intervene and Exelon Answer NRC Staff Answer in NRDCs Combined Reply Information Declaration Contention 4-E These portions of the Combined Reply Paine acknowledges that the ER contains

  • The phrase decentralized and in the second provide new arguments and analysis of discrete replacement sources full sentence on page 56; and the phrase massive information that were not identified in for Limerick but does so without providing but wildly unrealistic centralized on page 57. the Petition. Instead of confronting an analysis that the demonstrates those
  • All but the first paragraph of Section III.B.4 of directly the substance of the ER resources and combinations are the the Combined Reply, beginning on page 58, discussion on renewable energy reasonably likely results of the No Action challenging the ERs discussion of and conclusions alternatives and DSM, NRDCs general Alternative:

regarding reasonable alternatives, including solar approach in the Petition was to insist photovoltaic generation. that the ER omitted these subjects. Now Paine decl. pg. 3: Unlike the Applicants

  • The phrase on the top of page 61: nor do they that the NRDC has realized that these selection of individual utility-scale power plausibly represent the way in which these alternatives were actually cross- plant alternatives that it subjectively resources will be deployed and integrated in the referenced in the discussion of the No- deems reasonable and appropriate to its future if relicensing is denied. Action Alternative, it contends that the own business purpose of generating and
  • The paragraph beginning As noted above on existing discussion of the purported selling electricity to replace LGS the bottom of page 61 through the sentence missing information is not adequate, in ending to assume a portion of the system load an attempt to rehabilitate its deficient And Paine decl. pg. 4: in addition to the now served by LGS on the middle of page 62, contention of omission. single, discrete electric generation discussing solar photovoltaic generation and sources reviewed by the Applicant as battery storage systems. In addition, the new claims in the reasonable alternatives to extended
  • The phrase either alone or in combination with Combined Reply relating to operation of Limericks base load distributed renewable generation or other decentralized generation, solar capacity.

electricity resources, such as natural gas-fired photovoltaic energy, wind energy, generation or Canadian hydropower imports on battery storage systems, natural gas- Thus, the Paine Declaration highlights the the bottom of page 69. fired generation and Canadian omissions in the ER - failure to hydropower imports impermissibly demonstrate that the scenarios discussed expand Contention 4-E to the point that are reasonable and only consideration of it barely resembles the original alternatives that will meet Limericks contention contained in the Petition. current generating capacity.

Contention 4-E This portion of the Combined Reply NRDC used almost identical language to In fact Exelon answer refers to 10 C.F.R. §

  • On page 63, the text beginning thereby provides a new argument and legal 51.103: The ER violates 10 C.F.R. § 51.45( 51 in its entirety: Part 51 codifies a providing a bona fide basis through the end of reference that was not identified in the c) because it unreasonably and arbitrarily standard that federal courts have applied the paragraph ending minimize environmental Petition. Contention 4-E in the Petition limits its analysis of the No Action consistently in reviewing agency harm. did not discuss or reference 10 C.F.R. § alternative in a manner that fails, to the environmental impact statements.

51.103(a)(4) as a legal standard for fullest extent practicable, [to] quantify Exelon answer at 59.

analysis of the No-Action Alternative. the various factors considered and neglects discussion of important qualitative considerations or factors that cannot be quantified. Paine Expert Decl.

at ¶¶ 4-10. - Pet. at pg. 23.