2011 Davis - Besse Nuclear Power Station Initial Examination Miscellaneous Correspondence
ML120250275
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/12/2011
From: David Reeser
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML11354A077 List:
References
Download: ML120250275 (22)


Text

2011 DAVIS-BESSE NUCLEAR POWER STATION INITIAL EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, ILLINOIS 60532*4352 December 1, 2011 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Allen:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Robert C. Hovland, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, o'f NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of December 12, 2011. The NRC staff will administer the operating tests during the weeks of December 5 and 12, 2011. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630 829-9707.

Please contact your Chief Examiner, Mr. David W. Reeser at 630-829-9859, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

B. Allen

-2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

Distribution via ListServ'

B. Allen

-2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

Distribution via ListServ' DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Amy Snyder RidsNrrPM DavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource John McHale DOCUMENT NAME: Exam approvalltr-DB2011.doc T'

o receive a copy 0 fth' document,.Indi I the b "C" = C enel "E" = 0 'Y'j with attaeh/enel "N" =

IS cate n ox OPY w/o attaehi C

No copy OFFICE RIII:DRS Ic RIII:DRS IN RIII:DRS N

NAME JRKweiser:'7W1(

HPeterson )VI f(P:

DWReeser st fJ-"

DATE 111 30 111 i"P' I

111Vft/p' 111 t1" 111 OFFICIAL RECORD COPY

(

I

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 17, 2011 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-30BO Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Allen:

In a telephone conversation on June 16, 2011, with Mr. Paul Timmerman arrangements were made for the administration of licensing examinations at the Davis-Besse Station during the week(s) of December 5 and 12,2011. In addition, the U. S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of November 14,2911.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 12, 2011. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by October 24, 2011.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55..40(b )(3>>, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

B. Allen Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or 'from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Paul Timmerman has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact R. Keith Walton at 630-829-9836, or me at 630-829-9707.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 cc: Distribution via ListServ Robert Hovland, Training Department

Letter to Barry Allen from Hironori Peterson dated August 17, 2011.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource Daniel Merzke RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource James McHale, NRR J. R. Kweiser, DRS DOCUMENT NAME: G:\\DRSIII\\DRS\\WORK IN PROGRESS\\LTR 8_11 DAVIS BESSE PREPARING EXAMINATION.DOCX To receive a copy of this document, indicate in the concurrence box..c.. =Copy without attach/encl "En =Copy with attachiencInN" =N0 copy OFFICE RIII:DRS I ~RS I I

J NAME KWalton~b HPeterson DATE 8/17/11 8/17111 OFFICIAL RECORD COPY

fY cK011

..,' 'FENOC 5501 North Siale Route 2 ArslEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Bsrry S. AIlen 419-321-7676 Vice President - Nuclear Fax,' 419-321-7582 August 14, 2009 L-09-219 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2009-11. "Preparation and Scheduling of Operator licenSing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary (RIS) 2009-11, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2017 for Initial Operator License Examinations and through calendar year 2012 for Generic Fundamentals Examinations.

Note that the requested primary date for the 2011 Initial Operator License Examination is different than previously submitted. This operator license class was originally scheduled to start immediately following the DBNPS sixteenth refueling outage.

However, this refueling outage has been rescheduled, and the examination dates submitted under RIS 2008-16 for 2011 and 2013 are affected.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.

Sincerely, 07 5.Aa.-

Barry S. Allen LJS I?

l1.ic CI Ji4 cJ ~

AUG 182009

"I Enclosure A

NRC Form 536 - Operator Licensing Examination Data cc:

Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager 08-1 NRC Senior Resident Inspector Chief. Operations Branch. NRC Region III Utility Radiological Safety Board

Enclosure A L-09-219 Form NRC - 536 Operator Licensing Examination Data (one page follows)

',I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (1()'2008)

OPERA TOR LICENSING EXAMINATION DATA APPROVED BY OMS: NO, 3150.Q131 EXPIRES: 10/31/2011 Estimated burden per res~onse to comply with this voluntary Informallon collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, his information collecllon Is used to plan budgets and resources for operator examinations. Send comments ref.ardin~ burden estimate to the Records and FOIA/Privacy ServIces Branch

  • 5 F 3), U,S, Nuclear R~ulatOry Commission, Washington. DC 20555*000
  • or blc inlemet e-mail to In ocoliects@nrcoov, and to the Desll Oflk:er, Office of In ormation and RegUlato~ Affairs. NE 8-10202. (3150-0131), Office of Management and Budget, Wash ngton. DC 20503.

II a means used to impose an information collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and s person is not rSQuired to respond 10. Ihe Information collecllon.

FACIUTY Davis-Besse Nuclear Power Station, Unit 1 NRCREClION NRC Region IIJ A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 11 CY 13 --

Cy 15 -

CY 17 -

ESTIMATEO NUMBER OF LlCENSEE*PREPARED EXAMINATIONS 1

]

1

]

ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS 0

0 0

0 B. INITIAL OPERA TOR LICENSE EXAMINA,'IONS PROPOSED NUMBER CY 11-CY 13 CY 15--

Cy 17-NUMBER OF REACTOR OPERATORS 6

6 6

6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8

8 8

8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2

2 2

2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12/05/2011 12/02/2013 12/0712015 12/0412017 ALTERNATE DATE 01/09/2012 01/06/2014 01/1112016 01/08/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER Cy 2010 Cy 12 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 16 NRC FORM 536 (10-2008)

PRINTED ON RECYCLED PAPER

October 7, 2008 Mr. Barry Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Allen:

In a letter dated August 4, 2008 (L-08-246), your staff requested we schedule initial license operator examinations during the weeks of July 13, 2009, August 22,2011, and August 19, 2013.

We have tentatively scheduled the requested examinations to occur during the requested weeks.

On-site validation of these examinations is tentatively scheduled to occur approximately three weeks before the examination week. In the unlikely event that we are unable to support an examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

We understand that your staff will develop the examinations scheduled for August 2011 and August 2013. We have notified your training staff that the NRC will be developing the July 2009 initial license examination. The letter indicated that more than nine applicants were being considered for each of the examinations. Each examination has been scheduled for two weeks to accommodate this number of applicants. If the number of applicants should decrease below ten applicants, please inform us, as this result in a schedule change. Please inform us at your earliest opportunity if you discover you need to change the scheduled date for the examination.

A supplementary letter will be sent to the training department approximately 120 days prior to the initial examination. The letter will inform the training department of the chief examiner's name, outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination dates, and reconfirm the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and

B. Allen

-2 Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. O'Claire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners

B. Allen

-2 Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.govlreading-rm/adams.html.

Sincerely, IRA!

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc:

The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC P. Harden, Vice President, Nuclear Support D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC C. O'Claire, State Liaison Officer, Ohio Emergency Management Agency R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners DISTRIBUTION:

RidsNrrDorlLpl3-2 Tamara Bloomer RidsNrrPMDavisBesse Resource RidsNrrDirslrib Resource Mark Satorius Kenneth Obrien Jared Heck Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DRS\\WORK IN PROGRESS\\DAV 100708 DRS OL.DOC X Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T'

fth' document, 10

. d' i

he bo "e".'" C I

enc Copy Wit hiencI "N" No copy o receive a COP] 0 IS Icate 0 t x

opy W 0 attachi! "En =

. h attac

=

II II Urrlvl::

Rill: DRS I

RIII:DRS I

RIII:DRS

[

I NAME JKweiser:co DMcNeil HPeterson DATE 09/30/08 10/02/08 10/07/08 OFFICIAL RECORD COPY

Janet Kweiser From:

Carmen Olteanu Sent:

Monday, October 20,20082:52 PM To:

RidsNrrDorlLpl3-2 Resource; Tamara Bloomer; RidsNrrPMDavisBesse Resource; RidsNrrDirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; DRPIII; DRSIII; Patricia Buckley; Tammy Tomczak

Subject:

Davis-Besse Letter Re Confirmation of Initial Exam Attachments:

DAV 100708 DRS OLdoc The subject document has been completed and has been submitted to ope to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880655.

1

t FENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Barry S. Allen 419-321-7676 Vice President Nuclear Fax. 419-321-7582 August 4, 2008 L-08-246 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Response to Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations" The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2013 for Initial Operator License Examinations and through calendar year 2012 for Generic Fundamentals Examinations.

There are no regulatory commitments included in this letter. If there are any questions or if additional information is required, please contact Mr. Robert C. Hovland, Site Training Manager, at (419) 321-8406.

Sincerely, 0~5.~

Barry S. Allen LJS Enclosure A

NRC Form 536 - Operator Licensing Examination Data cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board AUG 5 2008

Enclosure A L-08-246 Form NRC - 536 Operator licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (8-2005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his informalion collection is used to plan budgets and resources for operator examinations. Send comments re~rdin~ burden estimate to the Records and FOIAIPrivacy Services Branch \\ -5 F 3), U.S.

Nuclear Rey,ulatory Commission. Washington, DC 20555-000,or b~ internet e-mail to in ocollects@nrc'gov, and 10 Ihe Desk Officer, Office of In ormation and Regulalory Affairs, NE B*10202, (3150*0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY Davis-Besse Nuclear Power Station, Unit 1 NRC REGION NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 09 CY 11 CY 13 CY-ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 0

1 1

ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 1

0 0

B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 09 CY 11-CY 13-CY -

NUMBER OF REACTOR OPERATORS 1

6 6

NUMBER OF SENIOR REACTOR OPERATORS INSTANT 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS UPGRADE 2

2 2

NUMBER OF SENIOR REACTOR OPERATORS LIMITED PROPOSED DATES PRIMARY DATE 07/13/2009 0812212011 08/20/2013 ALTERNATE DATE 09/1212011 09110/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA"flON (GFE) SCHEDULE PROPOSED NUMBER CY 10 CY 12 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF CANDIDATES 16 16 NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER

FENOC FirstEnergy Nuclear Operating Company I' ~~L I

':,,<. k\\

v-V".

\\

/1\\', l.:.....'-'

i "

5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B, 8ezilla 419-321-7676 Vice President - Nuclear Fax. 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3361 August 29, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Response to Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlemen:

The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2007 -17, "Preparation and Scheduling ofOperator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2011 for Operator License Examinations and through calendar year 2009 for the Generic Fundamentals Examination, Should you have any questions or require additional information, please contact Mr. Robert Co Hovland, Site Training Manager, at (419) 321-8406.

Very truly yours,

l?li (),

Mark B. Bezilla LJS Attachment Enclosure cc:

Regional Administrator, NRC Region III DB-l NRCINRR Project Manager DB-l NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board SEP 5 zo01

Docket Number 50-346 License Number NPF-3 Serial Number 3361 Page 1 of 1 COMMITMENT LIST The following list identifies actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance at 419-321-8000, at Davis Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A

Docket Nwnber 50-345 License Nwnber NPF-3 Serial Number 3361 Form NRC - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPiRES: 08/31/2008 (8-2005)

Estimated burden per res~onse to comply with Ihis volunlary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

his Information collection is used to plan budgets and resources for operator examinations, Send comments reltarding burden OPERATOR LICENSING estimate to the Records and FOIAlPrivacy Services Branch 1*5 F53). U.S.

Nuclear Rer,UlalOry Commission. Washington, DC 20555-000, or bl: internet EXAMINATION DATA e-mail 10 in ocollects@nrc-s0v, and 10 the Desk Officer. Office of In ormation and Regulalory Affairs, NE B-10202, (3150-0131). Office of Management and Budget. Washington, DC 20503.

if a means used 10 Impose an information collection does nol display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is nol required to respond 10, the information collection.

FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 Cy2009 Cy2010 Cy2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAM INA TIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2008 C)'2009 C)'2010 C)'2011 NUMBER OF REACTOR 4

OPERATORS 6

0 4

NUMBER OF SENIOR REACTOR 10 10 0

10 OPERATORS INSTANT NUMBER OF SENIOR REACTOR 0

2 0

2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/18/2008 09/14/2009 09/1912011 ALTERNATE DATE 03/17/2008 10/19/2009 10/1712011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED

~".--

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 CANDIDATES NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER