ML12019A408
| ML12019A408 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/02/2011 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| Download: ML12019A408 (2) | |
Text
1 Davis-BesseNPEm Resource From:
CuadradoDeJesus, Samuel Sent:
Tuesday, August 02, 2011 10:59 AM To:
'custerc@firstenergycorp.com'; dorts@firstenergycorp.com
Subject:
Additioanl topic for today's Teleconference Cliff:
Below is our concern with the OTI enhancement. Let me know if we can still discuss this issue on todays teleconference or if youll rather discuss this later.
LRA Section B.2.30s amendment dated June 3, 2011 states an enhancement that the scope program element is to include visual and volumetric inspections of the stainless steel makeup pump casings for cracking due to cyclic loading but it does not state what type of visual examinations will be used to detect cracking.
The GALL AMP XI.M32, One-Time Inspection states in the detection of aging effects program element that the program manages cracking due to cyclic loading using enhanced visual (EVT-1 or equivalent), surface, or volumetric examinations.
Some types of visual examination may not be sufficient to identify cracking and it is unclear what visual examinations will be performed to meet this need.
The NRC is requesting a discussion, followed by a docketed letter response later, of the type of visual examinations that will be used to identify cracking as part of the One-Time Inspection Program.
- Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov
Hearing Identifier:
Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:
3094 Mail Envelope Properties (Samuel.CuadradoDeJesus@nrc.gov20110802105800)
Subject:
Additioanl topic for today's Teleconference Sent Date:
8/2/2011 10:58:38 AM Received Date:
8/2/2011 10:58:00 AM From:
CuadradoDeJesus, Samuel Created By:
Samuel.CuadradoDeJesus@nrc.gov Recipients:
"'custerc@firstenergycorp.com'" <custerc@firstenergycorp.com>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1391 8/2/2011 10:58:00 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received: