ML12018A194
From kanterella
Jump to navigation
Jump to search
ML12018A194 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 02/11/2005 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
References | |
LRA-M-1107H M-1107H, Rev 003 | |
Download: ML12018A194 (1) | |
Similar Documents at Grand Gulf | |
---|---|
Category:Drawing
MONTHYEARML12019A0152011-10-18018 October 2011
[Table view]Drawing VPF-KA3622-030 (LRA-VPF-KA3622-030), Rev. B, Schematic-Oil Piping for E51-C002 RCIC Turbine. ML12018A2892011-10-13013 October 2011 Drawing M-1116B (LRA-M-1116B), Rev. 002, Piping & Instrumentation Diagram Miscellaneous Vents & Drains for Allis Chalmer Power System Incorporated Turbine Generator Equipment. ML12018A1162011-10-13013 October 2011 Drawing M-1098H (LRA-M-1098H), Rev. 003, P & I Diagram Embedded & Suspended Drains Auxiliary Bldg. Above El. 135'-0. ML12018A0682011-10-13013 October 2011 Drawing M-1089 (LRA-M-1089), Rev. 026 Piping & Instrumentation Diagram Filter Demineralizer System Fuel Pool Cooling & Cleanup-Unit 1 ML12018A0552011-10-13013 October 2011 Drawing M-1081C (LRA-M-1081C), Rev. 008, P & I Diagram Control Rod Drive Hydraulic System, Unit 1. ML12019A3052011-10-10010 October 2011 Drawing M-1066D (LRA-M-1066D), Rev. 0 Piping & Instrumentation Diagram Lube Oil System (Turbine Generator), Unit 1 ML12019A0882011-09-29029 September 2011 Drawing M-1053D, (LRA-M-1053D), Rev. 002, P & I Diagram Condensate System Unit 1 ML12019A0382011-09-29029 September 2011 Drawing M-0050B, (LRA-M-0050B), Rev. 007, P & I Diagram Control Room Building HVAC System Units 1 & 2 ML12019A0372011-09-29029 September 2011 Drawing M-0050A, (LRA-M-0050A), Rev. 012, P & I Diagram Control Room Building HVAC System Unit 1 & 2 ML12019A0312011-09-29029 September 2011 Drawing M-0035R (LRA-M-0035R), Rev. 001, P & I Diagram Fire Protection System Unit 1 ML12019A0292011-09-29029 September 2011 Drawing M-0035K (LRA-M-0035K), Rev. 013, P & I Diagram Fire Protection System, Units 1 . ML12019A0162011-05-0303 May 2011 Drawing LRA-E-001 (LRA-E-001), Rev. 0, Grand Gulf Nuclear Station Offsite Power Recovery Diagram. Sheet 1 ML12019A0862011-02-21021 February 2011 Drawing M-1053B, (LRA-M-1053B), Rev. 29, P & I Diagram Condensate System ML12019A0802011-02-21021 February 2011 Drawing M-1051A, (LRA-M-1051A), Rev. 034, P & I Diagram Main & Reheat Steam System Unit 1 ML12019A1062011-01-21021 January 2011 Drawing M-1061A (LRA-M-1061A), Rev. 064, Piping & Instrumentation Diagram Standby Service Water System, Unit 1 ML12017A2302011-01-21021 January 2011 Drawing M-1077E (LRA-M-1077E), Rev. 003, P & I Diagram Nuclear Boiler System. ML12019A1082010-12-16016 December 2010 Drawing M-1061C (LRA-M-1061C), Rev. 037, Piping & Instrumentation Diagram Standby Service Water System, Unit 1 ML12019A1072010-12-16016 December 2010 Drawing M-10618, (LRA-M-1061B) Rev 049, Piping & Instrumentation Diagram Standby Service Water System, Unit 1 ML12018A1202010-12-16016 December 2010 Drawing M-1101 (LRA-M-1101), Rev. 018, P & I Diagram Drywell Cooling System. ML12018A1182010-12-16016 December 2010 Drawing M-1100A (LRA-M-1100A), Rev. 025, P & I Diagram Containment Cooling System. ML12019A0142010-11-18018 November 2010 Drawing M-1127A (LRA-M-1127A), Rev. 000, Piping & Instrumentation Diagram Noblechem Monitoring System. ML12019A0192010-11-18018 November 2010 Drawing M-0033A (LRA-M-0033A), Rev. 037, P & I Diagram Make Up Water Treatment Sys., Unit 1. ML12019A3112010-11-18018 November 2010 Drawing M-1067H (LRA-M-1067H), Rev. 005, Piping & Instrumentation Diagram Instrument Air System, Unit 1 Containment. ML12017A2362010-11-18018 November 2010 Drawing M-1079 (LRA-M-1079), Rev. 046, P & I Diagram Reactor Water Cleanup System, Unit 1. ML12018A2002010-11-18018 November 2010 Drawing M-1109D (LRA-M-1109D), Rev. 022, Piping & Instrumentation Diagram Plant Chilled Water System. ML12019A0412010-10-29029 October 2010 Drawing M-1044A, (LRA-M-1044A), Rev. 003, P & I Diagram Hydrogen & Carbon Dioxide System ML12019A0262010-10-0606 October 2010 Drawing M-0035F (LRA-M-0035F), Rev. 020, P & I Diagram Fire Protection System, Units 1 & 2. ML12019A1042010-10-0606 October 2010 Drawing M-1060A, (LRA-M-1060A), Rev. 032, P & I Diagram Condenser Air Removal System Unit 1 ML12019A3022010-09-22022 September 2010 Drawing M-1066B-002 (LRA-M-1066B-SH02), Rev. 002, Piping & Instrumentation Diagram Lube Oil System, Unit 1 ML12019A3012010-09-22022 September 2010 Drawing M-1066B-001 (LRA-M-1066B-SH01), Rev. 0 02, Piping & Instrumentation Diagram Lube Oil System, Unit 1 ML12019A0902010-09-0909 September 2010 Drawing M-1054, (LRA-M-1054), Rev. 038, P & I Diagram Feedwater System ML12017A2242010-08-20020 August 2010 Drawing M-1072F (LRA-M-1072F), Rev. 010, P & I Diagram Plant Service Water System, Unit 1. ML12019A0222010-08-20020 August 2010 Drawing M-0034B (LRA-M-0034B), Rev. 048, P & I Diagram Domestic Water System, Unit 1. ML12019A3072010-08-19019 August 2010 Drawing M-1067A (LRA-M-1067A), Rev. 063 Piping & Instrumentation Diagram Instrument Air System, Unit 1 ML12019A0872010-06-0101 June 2010 Drawing M-1053C, (LRA-M-1053C), Rev. 020, P & I Diagram Condensate System ML12018A1872010-05-13013 May 2010 Drawing M-1104A (LRA-M-1104A), Rev. 020, P & I Diagram Fuel Handling Area Ventilation System. ML12017A2202010-05-0505 May 2010 Drawing M-1072A (LRA-M-1072A), Rev. 041, P & I Diagram Plant Service Water System, Unit 1. ML12019A2962010-05-0303 May 2010 Drawing M-1064H (LRA-M-1064H), Rev. 013, Piping & Instrumentation Diagram Condensate Cleanup System (Pre-Coat Filters) Unit 1 ML12019A2972010-05-0303 May 2010 Drawing M-1064J (LRA-M-1064J), Rev. 011, Piping & Instrumentation Diagram Condensate Cleanup System (Pre-Coat Filters) Unit 1 ML12019A3102010-05-0303 May 2010 Drawing M-1067E (LRA-M-1067E), Rev. 022 Piping & Instrumentation Diagram Instrument Air System Turbine Bldg., Unit 1 ML12017A2292010-03-0101 March 2010 Drawing M-1077D (LRA-M-1077D), Rev. 007, P & I Diagram Nuclear Boiler System. ML12017A2262010-03-0101 March 2010 Drawing M-1077A (LRA-M-1077A), Rev. 034, P & I Diagram Nuclear Boiler System. ML12018A0572010-02-0505 February 2010 Drawing M-1083A (LRA-M-1083A), Rev. 034, P & I Diagram Reactor Core Isolation Cooling System-Unit 1. ML12017A2372010-02-0505 February 2010 Drawing M-1080A (LRA-M-1080A), Rev. 033, P & I Diagram Filter / Demineralizer System Reactor Water Cleanup. ML12019A3122009-12-21021 December 2009 Drawing M-1067M (LRA-M-1067M), Rev. 003 Piping & Instrumentation Diagram Instrument Air, Unit 1 ML12019A0232009-10-19019 October 2009 Drawing M-0035A (LRA-M-0035A), Rev. 028, P & I Diagram Fire Protection System, Unit 1. ML12019A0822009-09-0808 September 2009 Drawing M-1051C, (LRA-M-1051C), Rev. 025, P & I Diagram Main & Reheat Steam System Unit 1 ML12018A0702009-08-0707 August 2009 Drawing M-1090B (LRA-M-1090B), Rev. 037 Piping & Instrumentation Diagram Leak Detection System ML12019A0172009-07-0909 July 2009 Drawing M-0030A, Rev. 28, P & I Diagram Legend, Units 1 & 2. ML12019A0202009-06-27027 June 2009 Drawing M-0033B (LRA-M-0033B), Rev. 049, P & I Diagram Makeup Water Treatment System. 2011-09-29 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22257A0132022-09-0808 September 2022
[Table view]Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22257A0052022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22257A0062022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22251A3672022-09-0808 September 2022 Submittal of Updated Final Safety Analysis Report, Cover Letter ML22257A0422022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22257A0432022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22257A0092022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 4, Reactor ML22257A0072022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 6, Engineering Safety Features ML22257A0172022-09-0808 September 2022 Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement ML22257A0182022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related Requirements ML22257A0272022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22257A0392022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22257A0372022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22257A0202022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22257A0302022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related Requirements ML22257A0322022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22257A0112022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22257A0162022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22257A0212022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22257A0152022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22257A0142022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22257A0252022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22257A0102022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22257A0222022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22257A0232022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22257A0362022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 4, Reactor ML22257A0332022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22257A0282022-09-0808 September 2022 Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement ML22257A0262022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22257A0402022-09-0808 September 2022 Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22073A1862022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22073A1772022-03-0808 March 2022 Updated Final Safety Analysis Report, Affected Pages ML22073A1762022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML22073A1752022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22073A1782022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22073A1732022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22073A1722022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22073A1712022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 4, Reactor ML22073A1692022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22073A1672022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22073A1822022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related Requirements ML22073A1832022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22073A1842022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22073A1852022-03-0808 March 2022 Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML21039A2562021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML21039A2592021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 4, Reactor ML21039A2652021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems ML21039A2552021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 8, Electric Power ML21039A2512021-01-27027 January 2021 Submittal of Updated Final Safety Analysis Report ML21039A3202021-01-27027 January 2021 Updated Final Safety Analysis Report, Chapter 8, Electric Power 2022-09-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML12018A194&oldid=2220769"