ML12012A249
| ML12012A249 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 08/30/2011 |
| From: | Reinhart J Omaha Public Power District |
| To: | Document Control Desk, NRC Region 4 |
| References | |
| FOIA/PA-2011-0339 | |
| Download: ML12012A249 (7) | |
Text
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390, UPON SEP.ARATION OF THE ENCLOSURE, THIS LETTER IS DECONTROLLED
.I,
%n m m Omaha Fubl1c PowerOlsfict 444 South 16th Street Mall Omaha, NE 68102-2247 i
A ono "1
rUUyu0L,,U, (..
I I LIC-1 1-0096
) U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
References:
SUBJECT:
- 1. Docket No. 50-285
- 2. Nuclear Regulatory Commission Public Meeting, July 27, 2011
- 3. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk) dated August 10, 2011 (LIC-11-0092)
- 4. Letter from OPPD (J. A. Reinhart) to NRC (Document Control Desk) dated August 30, 2011 (LIC-1 1-0095)
Fort Calhoun Station Post-Flooding Security Recovery Action Plan, Revision 1 Due to Missouri river flooding, Fort Calhoun Station (FCS) entered a Notice of Unusual Event (NOUE) on June 6, 2011, as required by station procedures. On August 29, 2011, due to receding river levels, FCS exited the NOUE. Additionally, since April 9, 2011, FCS has been shutdown for a refueling outage and will remain shutdown until the Missouri river recedes to a safe level and site conditions allow for restart.
In Reference 3 OPPD provided the initial FCS post-flooding recovery action plan that provides for extensive reviews of plant systems, structures, and components (SSCs) to assess the impact of the flood waters. Attached to this letter is revision 1 to the subject action plan. The revision contains changes in format and numbering of action items.
OPPD understands that selected actions in the attached plan will be included in a Confirmatory Action Letter (CAL) that must be satisfactorily completed prior to FCS plant restart. Therefore, this letter contains no commitments; the commitments will be described in the CAL.
OPPD is committed to the safe operation of FCS and will not ascend in mode without concurrence from the NRC that applicable commitments have been satisfied. The attached Security FCS flooding recovery action plan is intended to be a living document; however, only substantive changes will be re-submitted.
The material enclosed herewith is exempt from public disclosure in accordance with 10 CFR 2.390 and it disclosure to unauthorized individuals could present a security vulnerability.
Sincere*
ly I norai
.. fornatior, h Itn is record was deleted in accordance wvt h dmo no~to e rey A. Reinhart Act, egem - S re it Vice President FO-A.
PmrIrvvnPrnt welsi den,,)
nnrttnti.'.
P-lo ent with Pnual nnnorturtitv
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390' Enclosure LIC-11-0096 Page 1 FLOODING RECOVERY ACTION PLAN REVISION 1
(b)(4)
(b)(4)
(b)(4)