MONTHYEARML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML24009A1112024-01-0909 January 2024 NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23354A2032023-12-18018 December 2023 Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23304A2272023-10-31031 October 2023 NRR E-mail Capture - Request for State of Georgia Comment by 5pm Monday, Nov. 6, 2023 - License Amendment Request for Vogtle Unit 4 - to Remove Combined License Appendix C ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 ML23283A0332023-10-10010 October 2023 COL Docs - FW Vogtle Units 3 and 4 (LAR 23-009) ML23283A0452023-10-0808 October 2023 E-Mail Re Plant Vogtle - Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request ML23279A2082023-10-0505 October 2023 Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23275A1002023-10-0202 October 2023 COL Docs - Re Action Summary of 9.27.23 Clarification Call with Southern Nuclear Company on LAR-22-0002, TS 3.8.3 Inverters - Operating Completion Time ML23270B1912023-09-27027 September 2023 COL Docs - Update Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters Operating ML23263A1042023-09-20020 September 2023 COL Docs - FW Fyi for Tomorrow'S Psm Meeting ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23264A0142023-09-14014 September 2023 NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR ML23256A2682023-09-13013 September 2023 COL Docs - Acceptance Review of Southern Nuclear Operating Companys License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23257A0632023-09-13013 September 2023 NRR E-mail Capture - Acceptance Review of Southern Nuclear Operating Company'S License Amendment Request to Remove Combined License Appendix C ML23249A2082023-09-0606 September 2023 NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) ML23248A3482023-09-0505 September 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) ML23243A9172023-08-31031 August 2023 NRR E-mail Capture - (External_Sender) Re Question - Legal Contact(S) for Vogtle Electric Generating Plant, Units 3 & 4 ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23241A0452023-08-29029 August 2023 COL Docs - FW Draft LAR and Exemption Request Regarding Tier 1 and Tier 2 Requirements ML23229A2322023-08-17017 August 2023 COL Docs - FW Re LAR 22-002 Second Round RAI Approved ML23188A151 for Vogtle Units 3 & 4 ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23221A3982023-08-0909 August 2023 COL Docs - LAR 22-002 Second Round RAI Approved ML23188A151 ML23216A1592023-08-0404 August 2023 COL Docs - FW Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-0149) ML23212A9642023-07-31031 July 2023 COL Docs - Action - Start of Annual Fees - Vogtle Unit 3 Completion of Power Ascension Testing and Declaration of Commercial Operations ML23220A0572023-07-26026 July 2023 Document Request for Vogtle Units 1 and 2 - Radiation Protection Inspection - Inspection Report 2023-03 2024-01-09
[Table view] |
Text
A Nielsen, Adam From: Bonser, Brian Sent: Friday, June 18, 2010 11:13 AM -
To: Dykes, Carmen; Nielsen, Adam Cc: Kuzo, George
Subject:
FW: Historical List of Reactor Sites with Groundwater Tritium greater than 20,000 pCi/I Fyi From: Conatser, Richard Sent: Wednesday, June 16, 2010 8:56 AM To: Martin, Robert Cc: Bonser, Brian; Shoop, Undine
Subject:
Historical List of Reactor Sites with Groundwater Tritium greater than 20,000 pCi/I Bob, Below (in RED) is the suggested response to Southern Company regarding the NRC including Hatch and Vogtle on "The List" of spills and leaks at power plants. Read this and see if you think it is OK. Feel free to edit it. If you want me to send it, just let me know. If you would like to send it to the licensee, feel free to do that as well, but please include the following individuals on the response:
- Bob Trojanoski (NRC State Liaison Officer, Region 1I)
NRR Health Physicists compiled a list of reactor sites with leaks or spills involving tritium (from abnormal radioactive releases) in concentrations greater than 20,000 pCi/I in either soil, soil moisture, groundwater, or the leak/spill source. Both Hatch and Vogtle appear on this list based on records supplied by the licensee to the NRC. The list has been posted on the NRC Public Web Page at http://www.nrc.gov/reactors/operatinq/ops-experience/tritium/sites-arndwtr-contam.html (via hyperlink in center of web page).
The licensee questioned whether Hatch and Vogtle should be included in the list, and whether the date associated with the Hatch event should be revised. NRR Health Physicists evaluated the situation for both Vogtle and Hatch, and have come to the following conclusions:
- Hatch should appear on the list based on a spill from the Spent Fuel Pool in 2003.
E The date for the Hatch event was verified as 2003, and the list was revised to reflect this information.
- Vogtle should appear on the list based on a multiple spills or leaks from the RWST in the 1990s.
- In both cases, the data indicates an abnormal release from the sites involving tritium greater than 20,000 pCi/I contacting the soil, which is the criteria for inclusion in the list.
The Historical List of Reactor Sites with Groundwater Tritium greater than 20,000 pCi/I was revised and reissued as Revision 5 with the change indicated above (i.e., the date for the Hatch event was changed from 1986 to 2003).
If you have questions, please contact me.
h~mIm41 hi~n this ,reodWV dstetdM9 ._
rwdaimmw iththe
-. ..F_J_+ eedom rof n bonFO Exemptions Np+, al... " :2--
CI 7L LI
S Best Regards, Health Physicist Nuclear Regulatory Commission 301-415-4039 Richard.Conatser@ NRC.Rov 2