January 4, 2012 David J. Bannister, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550, Fort Calhoun, NE 68023-0550
SUBJECT:
FEDERAL EMERGENCY MANAGEMENT AGENCY DETERMINATION OF CONTINUED REASONABLE ASSURANCE FOLLOWING THE JUNE THROUGH AUGUST 2011 FLOODING EVENT
Dear Mr. Bannister:
Enclosed is a copy of the Federal Emergency Management Agencys letter from Mr. A. Mitchell, Director, Technical Hazards Division, to Mr. R. Lewis, NRC Director, Division of Preparedness and Response, dated November 22, 2011. This letter discusses the Federal Emergency Managements determination that offsite emergency preparedness remains adequate to protect the health and safety of the public in the event of an emergency at Fort Calhoun Station. Based on the current state of offsite preparedness the Federal Emergency Management Agency has no concerns about Fort Calhoun Station returning to full-power operations.
The purpose of this letter is to communicate FEMAs official determination that offsite emergency preparedness remains adequate to respond to events at Fort Calhoun Station. No response to the Nuclear Regulatory Commission is required.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any further questions, please contact Paul J. Elkmann at (817) 200-1539 or Gilbert Guerra at (817) 200-1557.
Sincerely,
/RA/
Michael Hay, Chief Plant Support Branch-1 Division of Reactor Safety UNITED STATES NUCLEAR REGULATORY COMMISSION RE GIO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511
Docket: 50-285 License: DPR-40
Enclosure:
FEMA Letter to Mr. R. Lewis, Director, Division of Preparedness and Response, dated November 22, 2011 cc/w enclosure via Electronic Distribution
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Jeffrey.Clark@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
Project Manager (Lynnea.Wilkins@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (Mark.Franke@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
ADAMS No
- Yes
- SUNSI Review Complete Reviewer Initials
- MCH
- Publicly Available Non-publicly Available Sensitive
- Non-sensitive Category A - KEYWORD
- A.#
Sensitive-Sensitive-Security-Related-Periodic Review Required PSB1 C:PSB1 PElkmann MHay
/RA/
/RA/
1/4/12/
1/4/12
Enclosure
Enclosure