ML113640131

From kanterella
Jump to navigation Jump to search
Initial Exam 2011-302 General Correspondence
ML113640131
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/14/2011
From: Richard Anderson
Florida Power & Light Co
To: Phillip Capehart, Widmann M
Division of Reactor Safety II
References
50-335/11-302, 50-389/11-302
Download: ML113640131 (3)


Text

THERE WERE NO POST EXAM COMMENTS.

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 September 26, 2011 FPL 10 CFR 55.5 10 CFR 55.40 Mr. Malcolm Widmann L-2011-405 Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Reactor Operator Retake Examination Materials 050000335/2011302 & 05000389/20 1 1302 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1 021, Revision 9, Supplement 1, the proposed operating examination, supporting documents and reference material is due 45 days prior to the Nuclear Regulatory Commission (NRC) examination date. St. Lucie Plant Reactor (RO) retake examinations are scheduled to be administered the week of November 14, 2011.

Enclosed per these requirements are:

  • NRC Simulator Scenarios
  • ES-301-3, Operating Test Quality Checklist
  • LS-301-4, Simulator Scenario Quality Checklist
  • ES-201-3, Examination Security Agreement
  • 1 flash drive with supporting documentation including plant procedures.

Questions or comments should be directed to Mr. Fred Dennis at (772) 468-4104 (office) or (772) 631-1235: or Mr. Andy Terezakis at (772) 467-71 18 (office) or (772) 285-9136 (cell).

In accordance with 10 CFR 2.390 and NUREG-1 021 (Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until after the examinations are complete.

Very truly yours, Richard L. Anderson Site Vice President St. Lucie Plant RLAItlt Enclosures an FPL Group company

Flonda Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 August 26, 2011 FPL 10 CFR 55.5 10 CFR 55.40 Mr. Malcolm Widmann L-201 1-351 Attn. Mr. Phillip Capehart U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1 257 RE: St. Lucie Units 1 & 2 Docket Nos. 50-335 and 50-389 Reactor Operator Retake Examination Outline 050000335/2011302 & 05000389/2011302 Facility License Nos. DPR-67 and NFP-16 In accordance with the requirements of NUREG-1021, Revision 9, Supplement 1, the operating test outline is due 75 days prior to the Nuclear Regulatory Commission (NRC) examination date. St. Lucie Plant Reactor Operator (RO) retake examination is scheduled to be administered during the week of November 14, 2011.

Enclosed per these requirements are:

  • ES-201-2, Examination Outline Quality Checklist
  • ES-201-3, Examination Security Agreement
  • ES-301-2, Control Room/In-Plant Systems Outline
  • ES-D-1, Scenario Outline Questions or comments should be directed to Mr. Fred Dennis at (772) 468-4104 (office) or (772) 631-1235 (cell); or Mr. Andy Terezakis at (772) 467-7118 (office) or (772) 285-9136 (cell).

In accordance with 10 CFR 2.390 and NUREG-1021(Revision 9, Supplement 1, ES-201) information must be withheld from public disclosure until after the examinations are complete.

Very trulyh s, ic r L Anderson / .L 2

Si Vc resident St. Lucie Plant RLAItlt Enclosures an FPL Group company