1 Davis-BesseNPEm Resource From:
CuadradoDeJesus, Samuel Sent:
Thursday, December 08, 2011 4:26 PM To:
dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc:
Davis-BesseHearingFile Resource
Subject:
Draft Telecon Summary Nov 1, 2011 Attachments:
11 1 2011 DB NRC Telecon Summary.docx Steve and Cliff, Please review the attached Teleconference Summary and let me know if you have any comments.
- Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov
Hearing Identifier:
Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:
2827 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806FAAF209)
Subject:
Draft Telecon Summary Nov 1, 2011 Sent Date:
12/8/2011 4:26:19 PM Received Date:
12/8/2011 4:26:19 PM From:
CuadradoDeJesus, Samuel Created By:
Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 388 12/8/2011 4:26:19 PM 11 1 2011 DB NRC Telecon Summary.docx 29178 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
LICENSEE:
FirstEnergy Nuclear Operating Company FACILITY:
Davis-Besse
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 1, 2011 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE, LICENSE RENEWAL APPLICATION (TAC. NO. ME4640)
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 1, 2011, to discuss and clarify the applicants responses to the staffs requests for additional information (RAIs) concerning the Davis-Besse license renewal application.
provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant, a brief description on the status of the items is also included.
The applicant had an opportunity to comment on this summary.
Samuel Cuadrado de Jesús License Renewal Branch, RPB1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346
Enclosures:
- 1. List of Participants
- 2. List of Requests for Additional Information cc w/encls: See next page
DOCUMENT NAME: Insert document name and full path.
OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de Jesús D Morey DATE
/ /
/ /
/ /
TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 1, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)
John Klos NRC Naeem Iqbal NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)
Steve Dort FENOC Allen McAllister FENOC Larry Hinkle FENOC John Hartigan FENOC
REQUESTS FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION NOVEMBER 1, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 1, 2011, to discuss and clarify the following response to requests for additional information (RAI) concerning the Davis-Besse license renewal application (LRA).
10/7/2011 Supplemantal Response to RAI 3.3.2.14-1 Discussion: The staff discussed with the applicant why the Davis-Besse fire water storage tank heat exchanger was removed from the scope of license renewal. The staff stated that the fire water storage tank heat exchanger and related equipment used to keep the fire water above the Davis-Besse Fire Hazards Analysis Report (FHAR) minimum temperature limit needs to be included in the scope of license renewal and subject to aging management. The applicant identified that the heat exchanger and tank recirculation equipment in question is credited with ensuring the appropriate initial conditions and, therefore, this equipment is not in scope.
Additionally, the applicant stated that NUREG-1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants, Revision 2, Section 2.1.3.1.3, Regulated Events, page 2.1-8, specifically states that an applicant need not consider hypothetical failures or second-, third-, or fourth-level support systems in determining the systems, structures and components within the scope of the rule under 10 CFR 54.4(a)(3).
ACTION: Staff would review the response and the information discussed, and consider whether another RAI is necessary.
There was no further discussion, and the call was concluded.
SUBJECT:
Summary of Telephone Conference Call conducted on November 1, 2011 DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC [or NON-PUBLIC, if applicable]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney ICouret, OPA TReilly, OCA BHarris, OGC