1 Davis-BesseNPEm Resource From:
CuadradoDeJesus, Samuel Sent:
Tuesday, December 13, 2011 11:29 AM To:
dorts@firstenergycorp.com Cc:
Davis-BesseHearingFile Resource
Subject:
FW: NRC-FENOC Telephone Conference Notes from December 12, 2011 Attachments:
NRC telecon 20111212 RAI 3.1.2.2.16-2.pdf Thanks From: dorts@firstenergycorp.com [1]
Sent: Tuesday, December 13, 2011 10:44 AM To: CuadradoDeJesus, Samuel Cc: custerc@firstenergycorp.com
Subject:
NRC-FENOC Telephone Conference Notes from December 12, 2011 Sam..... attached are the telephone conference notes from the call held on December 12, 2011, for your information.
Please contact Cliff Custer or me with any questions regarding the attached.
Thank you, Steve Dort DBNPS License Renewal
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
Hearing Identifier:
Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:
2726 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806FAAF967)
Subject:
FW: NRC-FENOC Telephone Conference Notes from December 12, 2011 Sent Date:
12/13/2011 11:29:06 AM Received Date:
12/13/2011 11:29:07 AM From:
CuadradoDeJesus, Samuel Created By:
Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1112 12/13/2011 11:29:07 AM NRC telecon 20111212 RAI 3.1.2.2.16-2.pdf 23487 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
Doc No. 121211 TO:
File DATE: December 12, 2011 FROM:
Larry Hinkle
SUBJECT:
NRC Telecon Regarding Davis-Besse License Renewal NRC Attendees:
Sam Cuadrado de Jesus, Seung Min, Kenneth Karwoski, Christopher Hunt, Andrew Johnson FENOC Attendees: Cliff Custer, Allen McAllister, Larry Hinkle, Luke Twarek This telephone conference call was initiated by Sam Cuadrado de Jesus, NRC Project Manager for Davis-Besse License Renewal. The teleconference took place at 11:00 A.M.
on December 12, 2011. The purpose of the call was to discuss the FENOC response to NRC request for additional information (RAI) 3.1.2.2.16-2 regarding inspections to manage cracking due to primary water stress corrosion cracking of the steam generator tube-to-tubesheet welds, submitted by FENOC letter dated November 23, 2011.
The NRC began the teleconference with two requests listed as follows:
- 1. Clarify if the gross visual inspection will be conducted on the welds on the hot leg, cold leg, or both legs. In addition, describe the extent of the visual inspection, and clarify if the gross visual inspection will be conducted on each tube-to-tubesheet weld.
- 2. Clarify whether the gross visual inspection is equivalent to EVT-1, VT-1, or VT-3 inspection. In addition, describe how the visual inspections will be coupled to the eddy-current inspections in order to detect and manage the aging effect.
For request number 1, FENOC responded that the extent of the visual inspections is 100% for both the upper tubesheet tube-to-tubesheet welds (i.e., tube-to-tubesheet welds subjected to hot leg temperatures) and the lower tubesheet tube-to-tubesheet welds (i.e., tube-to-tubesheet welds subjected to cold leg temperatures).
For request number 2, FENOC responded that the gross visual inspection is not an ASME inspection. The gross visual inspection will consist of a remote-visual examination using a camera manipulator to obtain a straight on view of the weld from above. The gross visual examinations will be performed by personnel who are qualified for visual examination (i.e., are certified VT-1 or VT-3 examiners) and are knowledgeable in the type of tube-to-tubesheet welds being examined (i.e., fillet welds). In addition, FENOC responded that the eddy-current inspections are fully qualified to detect cracking in the tube-to-tubesheet joint. Any crack in the weld that would propagate to the tube OD or into the tube would be detected.
The NRC indicated that an RAI will be issued to address the above requests.
There was no further discussion, and the call was concluded.