ML11358A043

From kanterella
Jump to navigation Jump to search
Lr - 11/14/2011 DB Teleconference Summary
ML11358A043
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML11358A043 (7)


Text

1 Davis-BesseNPEm Resource From:

CuadradoDeJesus, Samuel Sent:

Wednesday, December 21, 2011 3:26 PM To:

dorts@firstenergycorp.com Cc:

custerc@firstenergycorp.com; Davis-BesseHearingFile Resource

Subject:

11/14/2011 DB teleconference summary Attachments:

11 14 2011 DB nrc Telecon Summary.docx

Steve, Please let me know if you have any comments on the attached teleconference summary.

Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov

Hearing Identifier:

Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:

2379 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806FB41B51)

Subject:

11/14/2011 DB teleconference summary Sent Date:

12/21/2011 3:25:50 PM Received Date:

12/21/2011 3:25:59 PM From:

CuadradoDeJesus, Samuel Created By:

Samuel.CuadradoDeJesus@nrc.gov Recipients:

"custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 371 12/21/2011 3:25:59 PM 11 14 2011 DB nrc Telecon Summary.docx 29118 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

LICENSEE:

FirstEnergy Nuclear Operating Company FACILITY:

Davis-Besse

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 14, 2011 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE, LICENSE RENEWAL APPLICATION (TAC. NO.

ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 14, 2011, to discuss and clarify the applicants responses to the staffs requests for additional information (RAIs) concerning the Davis-Besse license renewal application.

provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant, a brief description on the status of the items is also included.

The applicant had an opportunity to comment on this summary.

Samuel Cuadrado de Jesús License Renewal Branch, RPB1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: See next page

DOCUMENT NAME: Insert document name and full path.

OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de Jesús D Morey DATE

/ /

/ /

/ /

TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS NOVEMBER 14, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)

Bryce Lehman NRC Abdul Sheikh NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Jake Hofelich FENOC Allen McAllister FENOC Richard Bair FENOC Don Kosloff FENOC

REQUESTS FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION NOVEMBER 14, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on November 14, 2011, to discuss and clarify the following response to requests for additional information (RAIs) concerning the Davis-Besse license renewal application (LRA).

Response to RAI B.2.22-5 Containment Annulus Area Degradation

Background:

By letter dated September 16, 2011, the applicant provided a response to RAI B.2.22-5 regarding management of the containment vessel exterior surface in the annulus area (sand pocket region). The staff discussed the response with the applicant in a telephone conference call held on October 5, 2011 and agreed to have a future followup conference call to further discuss the staff concerns. The purpose of this conference call was to continue the discussion related to the applicants response to RAI B.2.22-5 as agreed on October 5, 2011 conference call.

Discussion:

The staff stated that, based on NRC observation of the annulus moisture barrier during the Cycle 17 Mid-cycle Outage in October 2011, the third bulleted item in license renewal future Commitment 36 needed to be revised to address periodic inspection of the moisture barrier. The applicant agreed that, while the moisture barrier is periodically inspected, the moisture barrier was not currently identified for inspection in license renewal documents, and would add the moisture barrier inspection to license renewal future Commitment 36.

There was no further discussion, and the call was concluded.

ACTION:

FENOC to provide a supplemental response to RAI B.2.22-5 to revise the third bulleted item in license renewal future Commitment 36 to include periodic inspections of the annulus moisture barrier.

SUBJECT:

Summary of Telephone Conference Call conducted on November 14, 2011 DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC [or NON-PUBLIC, if applicable]

RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource PCooper BHarris SCuadrado EMiller MMahoney ICouret, OPA TReilly, OCA BHarris, OGC