Lr - DB 12/12/2011 Draft Telecon Summary
ML11358A039
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML11358A039 (7)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, December 21, 2011 2:05 PM To: dorts@firstenergycorp.com Cc: custerc@firstenergycorp.com; Davis-BesseHearingFile Resource

Subject:

DB 12/12/2011 Draft telecon summary Attachments: 12 12 2011 DB NRC Telecon Summary.docx

Steve, Attached is the draft telecom summary of our 12/12/2011 conference call. Please let me know if you have any comments.
Regards, Samuel Cuadrado de Jesús Project Manager Projects Branch 1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 2375 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806FB41AE7)

Subject:

DB 12/12/2011 Draft telecon summary Sent Date: 12/21/2011 2:05:18 PM Received Date: 12/21/2011 2:05:20 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 403 12/21/2011 2:05:20 PM 12 12 2011 DB NRC Telecon Summary.docx 28498 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

LICENSEE: FirstEnergy Nuclear Operating Company FACILITY: Davis-Besse

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON DECEMBER 12, 2011 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FIRSTENERGY NUCLEAR OPERATING COMPANY, CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE DAVIS-BESSE, LICENSE RENEWAL APPLICATION (TAC. NO.

ME4640)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 12, 2011, to discuss and clarify the applicants response to the staffs request for additional information (RAI) concerning the Davis-Besse license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant, a brief description on the status of the items is also included.

The applicant had an opportunity to comment on this summary.

Samuel Cuadrado de Jesús License Renewal Branch, RPB1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Number:50-346

Enclosures:

1. List of Participants
2. Summary of Telephone Conference Call cc w/encls: See next page

DOCUMENT NAME: Insert document name and full path.

OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR NAME S Cuadrado de D Morey Jesús DATE / / / / / /

TELEPHONE CONFERENCE CALL DAVIS-BESSE LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS DECEMBER 12, 2011 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)

Christopher Hunt NRC Seung Min NRC Kenneth Karwoski NRC Andrew Johnson NRC Cliff Custer FirstEnergy Nuclear Operating Company (FENOC)

Allen McAllister FENOC Larry Hinkle FENOC Luke Twarek FENOC Enclosure 1

SUMMARY

OF TELEPHONE CONFERENCE CALL LICENSE RENEWAL APPLICATION DECEMBER 12, 2011 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of FirstEnergy Nuclear Operating Company (FENOC or the applicant) held a telephone conference call on December 12, 2011, to discuss and clarify the applicants November 23, 2011, response to request for additional information (RAIs) 3.1.2.2.16-2 and the staffs potential follow-up RAI 3.1.2.2.16-3 concerning the Davis-Besse license renewal application (LRA).

Discussion:

The staff and the applicant discussed the applicants response to NRC RAI 3.1.2.2.16-2 regarding the inspections to manage cracking due to primary water stress corrosion cracking of the steam generator tube-to-tubesheet welds, submitted by FENOC letter dated November 23, 2011. This discussion included the extent and method of the visual inspections.

In the discussion to clarify the extent of the visual inspections, the applicant indicated the gross visual inspection will be conducted on each of the welds on both hot legs and cold legs. The applicant also indicated that the extent of the visual inspections is 100 percent for both the hot leg tube-to-tubesheet welds and the cold leg tube-to-tubesheet welds.

In the discussion to clarify the method of the visual inspection, the applicant indicated that the visual inspection will consist of a remote-visual examination using a camera manipulator to obtain a straight on view of the weld from the primary side. The applicant also indicated that the visual inspections will be performed by personnel who are trained and knowledgeable in the steam generator tube-to-tubesheet welds and degradation of these welds. In addition, the applicant indicated that the eddy-current inspections are qualified to detect cracking in the tubing (e.g,, when a crack propagates into a tube).

The staff stated that a follow-up RAI (RAI 3.1.2.2.16-3) will be issued to obtain information that clarifies the extent and method of the visual inspections.

There was no further discussion, and the call was concluded.

ACTION: The staff will issue RAI 3.1.2.2.16-3 to address the extent and method of the visual inspections.

Enclosure 2

SUBJECT:

Summary of Telephone Conference Call Held on December 12, 2011 DISTRIBUTION: