.Entergy*
QUALITY RELATED IP-SMM-IPECSITE ADMINISTRATIVE PROCEDURE CY-110 Revision 4 MANAGEMENT MANUAL INFORMATIONAL USE Page 23 of 25 10.7 RGWMP QUARTERLY INTEGRATED REVIEW CHECKLIST
<r*** Pr6drarn.***
c****i*******(************ :t~,r,... ****(****>***.c****.****
- ~: t*~::: ~:: ************** i (******* tteviewtQomnh~nt$<>*************************
The following condition reports were written to document MW IL exceedences in 1st QTR 2011:
Monitoring Well MW Sample Results
. CR-IP2-2011-01493: MW-32 & MW-36 Sample Data MW Result Trends
- CR-IP2-2011-02695: MW-66
- CR-IP2-2011-02696: MH-5
- CR-IP3-2011-02995: MW-40, 41, 45, 51 & U3-T2 Storm Drain Storm Drain Activities
- CR-IP3-2011-01548: 03/21/11-Unit 3 Storm Drain Sample Data Storm Drain Trends 8 system has slightly increased tritium above their baselines.
IE Bulletin New 80-10 File Reports
- No anomalies were noted with samples collected in No. 80-10 support 80-10 program for this quarter.
Facility Refueling Activities
- A Unit 3 refueling outage was commenced on Spent Fuel Moves Operations Construction Activities 03/08/11.
Spill Reports Water was contained to the concrete pad. Sample of the system (sample 356743) the previous day Spills & Leaks Condition Reports contained no activity.
10CFR50. 75(g)
EN-RP-113 Reports
- CR-IP3-2011-01723: 03/26/11-31 RHR pump seal package leak is overflowing the pump casing into the moat. Leakage is approximately 1 gallon/hour.
Pump is currently in service.
- CR-IP2-2011~01426: On 3/16/2011 the Unit 2 SFP Leak Collection increased to 2167 mls of fluid. This had been averaging less than 100 ml during the SFP Chemistry weekly collection. A subsequent collection on System Chemistry RWST Chemistry 3/20/2011 yielded 4829 mls. Investigation showed
&Activity RCS Activity that the increase in volume collection occurred after the Spent Fuel Pool level was increased to 93 feet 1 0 inches. This is similar to the event which occurred in 2010 reference CR IP2-2010-4734 &
5175.
IPEC00233515 RIV000084 Submitted: December 22, 2011
A QUAI,.ITY RELATED IP-SMM-IPECSITE ADMINISTRATIVE PROCEDURE CY-110 Revision 4
~Entergy MANAGEMENT MANUAL INFORMATIONAL USE Page 23 of 25
- CR-IP3-2011-02583: 04/29/11-Du~ng the rain Other storm on 4/28 storm water entered the Unit 3 RAMS bldg through the door #303.
Quarter: ___
1.._st_a=ua...,.rt..,e.... r.20... 1,_,1....._ __