Riverkeeper (Riv) Pre-Filed Evidentiary Hearing Exhibit RIV000054, Letter from P. Bessette to D. Brancato, 10/18/11
ML11356A393
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/18/2011
From: Bessette P, Sutton K
Entergy Nuclear Operations, Morgan, Morgan, Lewis & Bockius, LLP
To: Brancato D
Atomic Safety and Licensing Board Panel, Riverkeeper
SECY RAS
Shared Package
ML11356A390 List:
References
RAS 21625, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML11356A393 (5)


Text

RIV000054 Submitted: December 22, 2011 Morgan, Lewwis & Bockius LLP 1111 Pennsyylvania Avenue, NWW Washington, DC 20004 Tel. 202.7399.3000 Fax: 202.7399.3001 www.morgannlewis.com Kathryn M.M Sutton Partner 202.739.5738 8 ksutton@MorganLewis.com Paul M. Be essette Partner 202.739.5796 6 pbessette@M MorganLewis.comm October 18, 2011 VIA ELE ECTRONIC C MAIL AN ND FEDER RAL EXPRE ESS Deborah Brancato Staff Attoorney Riverkeeeper, Inc.

20 Secorr Road Ossiningg, New York 10562 R

Re: Entergrgy Nuclear Operations,, Inc. (Indiaan Point Nucclear Generrating Units 2 and 3), Docket D Nos. 50-247-LR R and 50-2866-LR ___

Dear Ms. Brancato:

This is a response, on behhalf of Enterrgy Nuclear Operations, T O Inc. (Enterrgy), to youur letters daated Septemb ber 1 and 26, 2011 seekiing documennts pursuant to 10 C.F.R. § 2.336. As A an initial maatter, Entergy restates itss objection too Riverkeepers ongoingg discovery requestsr beccause Riverkeeeper may nott seek discovvery in this proceeding p fr from Entergyy, whether byy interrogatoories or otherw wise, except as permittedd in 10 C.F.R R. § 2.336(a)). Nonetheleess, in the sppirit of cooperatiion, but with hout waivingg these objecctions or connceding that the documennts discussedd below aree relevant orr material to the admittedd contentionns, Entergy provides p the following clarificattion of inform mation proviided in our previous p respponse to youur letters seekking documeents related too the metal fatigue f conteention, and provides p two additional documents d thhat we understannd will comp plete Entergyys responsees to your reqquests.

Since your in nitial May 133, 2011 letterr seeking documents relaated to Riverrkeeper Contentioon TC-1B (M Metal Fatiguue), Entergy has diligentlly worked too respond to Riverkeeperrs requests and provided numerous additional documents d too Riverkeepeer. As our associates, Joon Rund andd Ray Kuyleer, discussedd with you onn October 144, we undersstand that theere are two remaininng requests.

DB1/ 682639466

RIV000054 Submitted: December 22, 2011 Deborah Brancato October 18, 2011 Page 2 First, on September 1, 2011, Riverkeeper asked for Indian Point specific plant data used in the June 2010 Westinghouse environmentally-assisted fatigue evaluations for certain components. Specifically, you asked whether WCAP-14950, Mitigation and Evaluation of Pressurizer Insurge/Outsurge Transients (Proprietary Log No. 572, Production No.

IPECPROP00059247) (WCAP-14950) contains the referenced plant data, or, if not, where such information was located. As discussed on the October 14 telephone conference, this information is provided in two different documents that Entergy has already disclosed to Riverkeeper, and that we referenced in our August 10, 2011 letter to Riverkeeper:

Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian Point unit 2 Pressurizer Insurge/Outsurge Transient Development, (Proprietary Log No. 561, Production No. IPECPROP00057991) and Westinghouse Calculation Note Number CN-PAFM-09-64, Rev. 0, Indian Point Unit 3 Pressurizer Insurge/Outsurge Transient Development, (Log No. 562, Production Number IPECPROP00058077).

As Mr. Rund and Mr. Kuyler further explained, the raw data referenced in these two calculations is voluminous, would be burdensome to obtain and produce, and would be of little use to Riverkeeper. We understand that you agree. Therefore, Entergy has fully responded to your request for plant data.

Second, on May 13, 2011, Riverkeeper asked for information on the heat transfer coefficient equations used in Westinghouses June 2010 environmentally-assisted fatigue evaluations. Entergy responded to that request in its August 8 and September 8, 2011 letters.

More recently, on September 26, 2011, Riverkeeper agreed that WCAP-14950 provides this information for the pressurizer surge nozzles, but asked whether any such comparable information/documents exist for other components, including but not limited to the other components listed in Tables 4.3-13 and 4.3-14 of Entergys License Renewal Application (i.e.,

the vessel shell and lower head/bottom head to shell; vessel inlet and outlet nozzles; RCS piping charging system nozzle; RCS piping safety injection nozzle; and RHR Class 1 piping)[.]

In response to this additional request, Entergy provides two new documents: (1)

Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 2, CENC 1110, January 1967; and (2) Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 3, CENC 1122, June 1969. A copy of each document is on the enclosed compact disc (CD), in TIFF file format. These documents will be listed in the next update to Entergys mandatory disclosures. By producing the enclosed documents, Entergy does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.

For your convenience, the following table lists the components in Tables 4.3-13 and 4.3-14 of the License Renewal Application, and identifies the documents Entergy has produced that provide information on the heat transfer coefficients used in the fatigue analysis of each location.

DB1/ 68263946

RIV000054 Submitted: December 22, 2011 Deborah Brancato October 18, 2011 Page 3 These tables therefore show that Entergy has fully responded to your request for information on heat transfer coefficients.

IPEC Unit 2 (LRA Table 4.3-13)

Location Document Vessel shell and lower head - Combustion Engineering, Inc., Analytical Report for Indian Point Bottom head to shell Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Vessel inlet and outlet nozzles - Combustion Engineering, Inc., Analytical Report for Indian Point Reactor vessel inlet nozzle Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Vessel inlet and outlet nozzles - Combustion Engineering, Inc., Analytical Report for Indian Point Reactor vessel outlet nozzle Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Pressurizer surge line nozzles - Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Pressurizer surge nozzle Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (Proprietary Log No. 563, Production No.

IPECPROP00058158); and WCAP-14950 (Proprietary Log No. 572, Production No.

IPECPROP00059247)

Pressurizer surge line nozzles - Westinghouse Calculation Note Number CN-PAFM-09-117, Rev. 0, Surge line piping to safe end weld Indian Point Units 2 and 3 Hot Leg Surge Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 551, Production No.

IPECPROP00057247)

RCS piping charging system Westinghouse Calculation Note Number CN-PAFM-09-21, Rev. 0, nozzle - Charging system nozzle Indian Point Units 2 and 3 Charging Nozzles Environmental Fatigue Evaluation, (Proprietary Log No. 553, Production No.

IPECPROP00057382)

RCS piping safety injection nozzle Westinghouse Calculation Note Number CN-PAFM-09-79, Rev. 0, Indian Point Unit 2 Boron Injection Tank Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 555, Production No.

IPECPROP00057531)

RHR class 1 piping Westinghouse Calculation Note Number CN-PAFM-09-77, Rev. 0, Indian Point Units 2 and 3 Accumulator Nozzle Environmental Fatigue Evaluation, (Proprietary Log No. 559, Production No.

IPECPROP00057823)

DB1/ 68263946

RIV000054 Submitted: December 22, 2011 Deborah Brancato October 18, 2011 Page 4 IPEC Unit 3 (LRA Table 4.3-14)

Location Document Vessel shell and lower head - Combustion Engineering, Inc., Analytical Report for Indian Point Bottom head to shell Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Vessel inlet and outlet nozzles - Combustion Engineering, Inc., Analytical Report for Indian Point Reactor vessel inlet nozzle Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Vessel inlet and outlet nozzles - Combustion Engineering, Inc., Analytical Report for Indian Point Reactor vessel outlet nozzle Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Pressurizer surge line nozzles - Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Pressurizer surge line nozzle Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations, (Proprietary Log No. 564, Production No.

IPECPROP00058206); and WCAP-14950 (Proprietary Log No. 572, Production No.

IPECPROP00059247)

Pressurizer surge line nozzles - Westinghouse Calculation Note Number CN-PAFM-09-117, Rev. 0, Surge line piping to safe end weld Indian Point Units 2 and 3 Hot Leg Surge Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 551, Production No.

IPECPROP00057247)

RCS piping charging system Westinghouse Calculation Note Number CN-PAFM-09-21, Rev. 0, nozzle Indian Point Units 2 and 3 Charging Nozzles Environmental Fatigue Evaluation, (Proprietary Log No. 553, Production No.

IPECPROP00057382)

RCS piping safety injection Westinghouse Calculation Note CN-PAFM-09-74, Rev. 0, Indian Point nozzle Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 557, Production No.

IPECPROP00057667)

RHR class 1 piping Westinghouse Calculation Note Number CN-PAFM-09-77, Rev. 0, Indian Point Units 2 and 3 Accumulator Nozzle Environmental Fatigue Evaluation, (Proprietary Log No. 559, Production No.

IPECPROP00057823)

In summary, based on the October 14 teleconference and your October 17 e-mail, the new documents in the attached CD, along with the clarifications in this letter and the numerous other documents disclosed by Entergy on this contention, complete Entergys responses to Riverkeepers September 1 and September 26, 2011 document requests, and complete Entergys responses to all Riverkeeper document requests in this matter. Therefore, Entergy has complied DB1/ 68263946

RIV000054 Submitted: December 22, 2011 Deborah Brancato October 18, 2011 Page 5 with the Boards October 7, 2011 Order, directing Entergy and Riverkeeper to attempt to resolve all outstanding disclosure issues with all deliberate speed.

Sincerely, Signed (electronically) by Paul M. Bessette Kathryn M. Sutton, Esq.

Paul M. Bessette, Esq.

Counsel for Entergy Nuclear Operations, Inc.

Enclosure:

(CD) cc: Sherwin Turk DB1/ 68263946