ML11356A393

From kanterella
Jump to navigation Jump to search
Riverkeeper (Riv) Pre-Filed Evidentiary Hearing Exhibit RIV000054, Letter from P. Bessette to D. Brancato, 10/18/11
ML11356A393
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/18/2011
From: Bessette P, Sutton K
Entergy Nuclear Operations, Morgan, Morgan, Lewis & Bockius, LLP
To: Brancato D
Atomic Safety and Licensing Board Panel, Riverkeeper
SECY RAS
Shared Package
ML11356A390 List:
References
RAS 21625, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML11356A393 (5)


Text

Morgan, Lew 1111 Pennsy Washington, Tel. 202.739 Fax: 202.739 www.morgan Kathryn M Partner 202.739.5738 ksutton@Mo Paul M. Be Partner 202.739.5796 pbessette@M DB1/ 68263946 October VIA ELE Deborah Staff Atto Riverkee 20 Secor Ossining R

Dear Ms T

letters da initial ma Riverkee or otherw cooperati below are clarificat related to understan S

Contentio requests Rund and remainin wis & Bockius LLP ylvania Avenue, NW DC 20004 9.3000 9.3001 nlewis.com M. Sutton 8

rganLewis.com essette 6

MorganLewis.com 6

18, 2011 ECTRONIC Brancato orney eper, Inc.

r Road g, New York Re:

Enterg Units

. Brancato:

This is a resp ated Septemb atter, Enterg eper may not wise, except ion, but with e relevant or tion of inform o the metal f nd will comp ince your in on TC-1B (M and provide d Ray Kuyle ng requests.

W m

C MAIL AN 10562 rgy Nuclear 2 and 3), D onse, on beh ber 1 and 26 y restates its t seek discov as permitted hout waiving r material to mation provi fatigue conte plete Entergy nitial May 13 Metal Fatigu d numerous er, discussed ND FEDER Operations, Docket Nos.

half of Enter

, 2011 seeki s objection to very in this p d in 10 C.F.R g these objec the admitted ided in our p ention, and p ys response 3, 2011 letter ue), Entergy additional d d with you on RAL EXPRE

, Inc. (India 50-247-LR rgy Nuclear O ing documen o Riverkeep proceeding fr R. § 2.336(a) ctions or con d contention previous resp provides two es to your req r seeking do has diligentl documents to n October 14 ESS an Point Nuc R and 50-286 Operations, nts pursuant ers ongoing from Entergy

). Nonethele nceding that ns, Entergy p ponse to you additional d quests.

cuments rela ly worked to o Riverkeepe 4, we unders clear Gener 6-LR Inc. (Enter to 10 C.F.R g discovery r y, whether by ess, in the sp the documen provides the ur letters seek documents th ated to River o respond to er. As our a stand that the rating rgy), to you

. § 2.336. A requests bec y interrogato pirit of nts discussed following king docume hat we rkeeper Riverkeeper ssociates, Jo ere are two ur As an cause ories d

ents rs on RIV000054 Submitted: December 22, 2011

DB1/ 68263946 Deborah Brancato October 18, 2011 Page 2 First, on September 1, 2011, Riverkeeper asked for Indian Point specific plant data used in the June 2010 Westinghouse environmentally-assisted fatigue evaluations for certain components. Specifically, you asked whether WCAP-14950, Mitigation and Evaluation of Pressurizer Insurge/Outsurge Transients (Proprietary Log No. 572, Production No.

IPECPROP00059247) (WCAP-14950) contains the referenced plant data, or, if not, where such information was located. As discussed on the October 14 telephone conference, this information is provided in two different documents that Entergy has already disclosed to Riverkeeper, and that we referenced in our August 10, 2011 letter to Riverkeeper:

Westinghouse Calculation Note Number CN-PAFM-09-63, Rev. 0, Indian Point unit 2 Pressurizer Insurge/Outsurge Transient Development, (Proprietary Log No. 561, Production No. IPECPROP00057991) and Westinghouse Calculation Note Number CN-PAFM-09-64, Rev. 0, Indian Point Unit 3 Pressurizer Insurge/Outsurge Transient Development, (Log No. 562, Production Number IPECPROP00058077).

As Mr. Rund and Mr. Kuyler further explained, the raw data referenced in these two calculations is voluminous, would be burdensome to obtain and produce, and would be of little use to Riverkeeper. We understand that you agree. Therefore, Entergy has fully responded to your request for plant data.

Second, on May 13, 2011, Riverkeeper asked for information on the heat transfer coefficient equations used in Westinghouses June 2010 environmentally-assisted fatigue evaluations. Entergy responded to that request in its August 8 and September 8, 2011 letters.

More recently, on September 26, 2011, Riverkeeper agreed that WCAP-14950 provides this information for the pressurizer surge nozzles, but asked whether any such comparable information/documents exist for other components, including but not limited to the other components listed in Tables 4.3-13 and 4.3-14 of Entergys License Renewal Application (i.e.,

the vessel shell and lower head/bottom head to shell; vessel inlet and outlet nozzles; RCS piping charging system nozzle; RCS piping safety injection nozzle; and RHR Class 1 piping)[.]

In response to this additional request, Entergy provides two new documents: (1)

Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 2, CENC 1110, January 1967; and (2) Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 3, CENC 1122, June 1969. A copy of each document is on the enclosed compact disc (CD), in TIFF file format. These documents will be listed in the next update to Entergys mandatory disclosures. By producing the enclosed documents, Entergy does not necessarily concede that the documents are in fact relevant or material to the admitted contentions.

For your convenience, the following table lists the components in Tables 4.3-13 and 4.3-14 of the License Renewal Application, and identifies the documents Entergy has produced that provide information on the heat transfer coefficients used in the fatigue analysis of each location.

RIV000054 Submitted: December 22, 2011

DB1/ 68263946 Deborah Brancato October 18, 2011 Page 3 These tables therefore show that Entergy has fully responded to your request for information on heat transfer coefficients.

IPEC Unit 2 (LRA Table 4.3-13)

Location Document Vessel shell and lower head -

Bottom head to shell Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Vessel inlet and outlet nozzles -

Reactor vessel inlet nozzle Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Vessel inlet and outlet nozzles -

Reactor vessel outlet nozzle Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 2, CENC 1110, January 1967 (on attached CD)

Pressurizer surge line nozzles -

Pressurizer surge nozzle Westinghouse Calculation Note Number CN-PAFM-09-100, Rev. 0, Indian Point Unit 2 Insurge/Outsurge and Environmental Fatigue Evaluations, (Proprietary Log No. 563, Production No.

IPECPROP00058158); and WCAP-14950 (Proprietary Log No. 572, Production No.

IPECPROP00059247)

Pressurizer surge line nozzles -

Surge line piping to safe end weld Westinghouse Calculation Note Number CN-PAFM-09-117, Rev. 0, Indian Point Units 2 and 3 Hot Leg Surge Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 551, Production No.

IPECPROP00057247)

RCS piping charging system nozzle - Charging system nozzle Westinghouse Calculation Note Number CN-PAFM-09-21, Rev. 0, Indian Point Units 2 and 3 Charging Nozzles Environmental Fatigue Evaluation, (Proprietary Log No. 553, Production No.

IPECPROP00057382)

RCS piping safety injection nozzle Westinghouse Calculation Note Number CN-PAFM-09-79, Rev. 0, Indian Point Unit 2 Boron Injection Tank Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 555, Production No.

IPECPROP00057531)

RHR class 1 piping Westinghouse Calculation Note Number CN-PAFM-09-77, Rev. 0, Indian Point Units 2 and 3 Accumulator Nozzle Environmental Fatigue Evaluation, (Proprietary Log No. 559, Production No.

IPECPROP00057823)

RIV000054 Submitted: December 22, 2011

DB1/ 68263946 Deborah Brancato October 18, 2011 Page 4 IPEC Unit 3 (LRA Table 4.3-14)

Location Document Vessel shell and lower head -

Bottom head to shell Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Vessel inlet and outlet nozzles -

Reactor vessel inlet nozzle Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Vessel inlet and outlet nozzles -

Reactor vessel outlet nozzle Combustion Engineering, Inc., Analytical Report for Indian Point Reactor Vessel - Unit 3, CENC 1122, June 1969 (on attached CD)

Pressurizer surge line nozzles -

Pressurizer surge line nozzle Westinghouse Calculation Note Number CN-PAFM-09-105, Rev. 0, Indian Point Unit 3 Insurge/Outsurge and Environmental Fatigue Evaluations, (Proprietary Log No. 564, Production No.

IPECPROP00058206); and WCAP-14950 (Proprietary Log No. 572, Production No.

IPECPROP00059247)

Pressurizer surge line nozzles -

Surge line piping to safe end weld Westinghouse Calculation Note Number CN-PAFM-09-117, Rev. 0, Indian Point Units 2 and 3 Hot Leg Surge Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 551, Production No.

IPECPROP00057247)

RCS piping charging system nozzle Westinghouse Calculation Note Number CN-PAFM-09-21, Rev. 0, Indian Point Units 2 and 3 Charging Nozzles Environmental Fatigue Evaluation, (Proprietary Log No. 553, Production No.

IPECPROP00057382)

RCS piping safety injection nozzle Westinghouse Calculation Note CN-PAFM-09-74, Rev. 0, Indian Point Unit 3 Boron Injection Tank Nozzle Environmental Fatigue Evaluations, (Proprietary Log No. 557, Production No.

IPECPROP00057667)

RHR class 1 piping Westinghouse Calculation Note Number CN-PAFM-09-77, Rev. 0, Indian Point Units 2 and 3 Accumulator Nozzle Environmental Fatigue Evaluation, (Proprietary Log No. 559, Production No.

IPECPROP00057823)

In summary, based on the October 14 teleconference and your October 17 e-mail, the new documents in the attached CD, along with the clarifications in this letter and the numerous other documents disclosed by Entergy on this contention, complete Entergys responses to Riverkeepers September 1 and September 26, 2011 document requests, and complete Entergys responses to all Riverkeeper document requests in this matter. Therefore, Entergy has complied RIV000054 Submitted: December 22, 2011

DB1/ 68263946 Deborah Brancato October 18, 2011 Page 5 with the Boards October 7, 2011 Order, directing Entergy and Riverkeeper to attempt to resolve all outstanding disclosure issues with all deliberate speed.

Sincerely, Signed (electronically) by Paul M. Bessette Kathryn M. Sutton, Esq.

Paul M. Bessette, Esq.

Counsel for Entergy Nuclear Operations, Inc.

Enclosure:

(CD) cc:

Sherwin Turk RIV000054 Submitted: December 22, 2011