Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 13, 2011 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 2 Facility Operating License No. DPR-79 NRC Docket No. 50-328

Subject:

Unit 2 Cycle 17 - 180-Day Steam Generator Inspection Report In accordance with Sequoyah Nuclear Plant (SQN), Unit 2, Technical Specification (TS) 6.9.1.16, "Steam Generator (SG) Tube Inspection Report," SQN is providing the 180-day SG inspection report. This report is required to be submitted within 180 days after initial entry into MODE 4 following completion of inspection activities performed in accordance with TS 6.8.4.k, "Steam Generator (SG) Program," and includes the results of inservice inspections performed on the Unit 2 SGs during the Unit 2 Cycle 17 refueling outage. Since MODE 4 following the Unit 2 Cycle 17 refueling outage was entered on June 18, 2011, this report is being submitted no later than December 15, 2011.

There are no commitments contained in this letter. If you have any questions concerning this report, please contact Geoffrey Cook at (423) 843-7170.

Resp c ully, J.

S ea an er, Corporate Nuclear Licensing nclosure:

Unit 2 Cycle 17 - 180-Day Steam Generator Inspection Report cc: See Page 2 Printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 December 13, 2011 cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant