New York State (NYS) Pre-Filed Hearing Exhibit NYS000081, NYS PSC, Order, Approving Fast Track Utility-Administered Electric Energy Efficiency Programs with Modifications, Case Nos. 08-E-1003, 08-E-1007, 08-E-1014, and 08-E-1019 (Jan. 16, 2ML11348A167 |
Person / Time |
---|
Site: |
Indian Point |
---|
Issue date: |
12/14/2011 |
---|
From: |
Atomic Safety and Licensing Board Panel |
---|
To: |
|
---|
SECY RAS |
Shared Package |
---|
ML11348A126 |
List: |
---|
References |
---|
RAS 21536, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 |
Download: ML11348A167 (4) |
|
|
---|
Category:Legal-Pre-Filed Exhibits
MONTHYEARML16081A3252016-03-21021 March 2016 NRCR12001 - NRC Staff Prefiled Hearing Exhibit List (Revised) ML16078A4172016-03-18018 March 2016 ENTR20726 - Entergy Track 2 Exhibit List ML16078A4122016-03-18018 March 2016 NRC000236 - Crack Growth Rate Comparison - Eason Pathania Model to MRP Model- Excel Spreadsheet ML16078A4132016-03-18018 March 2016 NRCR11001 - Exhibt List NRC Staff Prefiled Hearing Exhibit List (Revised) ML15321A0352015-11-17017 November 2015 NYS000582 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15315A0132015-11-11011 November 2015 ENTR00726 - Track 2 Hearing Exhibit List ML15309A1292015-11-0505 November 2015 ENT000726 - Entergy Track 2 Hearing Exhibit List ML15309A1712015-11-0505 November 2015 RIVR14001 - Riverkeeper Tailored Track 2 Exhibit List ML15309A2212015-11-0505 November 2015 NRCR10001 - NRC Staff Track 2 Exhibit List ML15309A1552015-11-0404 November 2015 NYSR25001 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15313A4602015-11-0404 November 2015 NYSR25001 - Corrected Page 24 to Exhibits List Relevant to Track 2 Contentions ML15307A1152015-11-0303 November 2015 NYSR24001 - State of Ny Revised Hearing Exhibits List ML15307A8112015-11-0303 November 2015 NRC000230 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15302A4672015-10-29029 October 2015 ENTR16001 - Entergy Revised Exhibit List ML15252A4442015-09-0909 September 2015 NYS000563 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15252A4432015-09-0909 September 2015 NYS000566 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15252A5042015-09-0909 September 2015 NYS000568 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15252A5062015-09-0909 September 2015 NYS000570 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15252A5092015-09-0909 September 2015 RIV000164 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15252A5112015-09-0909 September 2015 RIVR13001 - Riverkeeper Updated Exhibit List ML15252A5752015-09-0909 September 2015 NYS000573 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15252A5792015-09-0909 September 2015 NYS Updated Exhibit List ML15261A8302015-09-0404 September 2015 ENTR00615 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15222A9152015-08-10010 August 2015 ENT000648 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227, Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (Undated) ML15223A4512015-08-10010 August 2015 NRC000206 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) ML15223A4542015-08-10010 August 2015 NRC000207 - Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) ML15223A4502015-08-10010 August 2015 NRC000205 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 3 - Reactor (2014) ML15223A3932015-08-10010 August 2015 NRCR00104 - on Yee Statement of Professional Qualifications (Revised) ML15223A3912015-08-10010 August 2015 NRCR00105 - Ching Ng Statement of Professional Qualifications (Revised) ML15222A8212015-08-10010 August 2015 ENT000617 - Curriculum Vitae of Timothy J. Griesbach ML15223A6712015-08-10010 August 2015 NRCR00147- NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15223A6752015-08-10010 August 2015 NRC000227 - Gary Stevens Statement of Professional Qualifications ML15222A8222015-08-10010 August 2015 ENT000618 - Curriculum Vitae of Randy G. Lott ML15223A7022015-08-10010 August 2015 NRCR900001 - NRC Staff Pre-filed Hearing Exhibit List (Revised) ML15222A8252015-08-10010 August 2015 ENT000629 - Letter from C. Grimes, NRC, to D. Walters, NEI, License Renewal Issue No. 98-0030 Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000) ML15222A8302015-08-10010 August 2015 ENT000634 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15223A7792015-08-10010 August 2015 NRC000224 - IP3 FSAR Rev. 04 Chapter 16 ML15223A7812015-08-10010 August 2015 NRC000226 - Jeffrey C. Poehler Statement of Professional Qualifications ML15223A7832015-08-10010 August 2015 NRC000228 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15223A7852015-08-10010 August 2015 NRC000229 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15223A7872015-08-10010 August 2015 NRC000196 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15223A3872015-08-10010 August 2015 NRCR00118 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15222A8352015-08-10010 August 2015 ENT000621 - Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 2 (Sept. 2014) ML15223A8052015-08-10010 August 2015 NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15223A9452015-08-10010 August 2015 NRC000223 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15223A3862015-08-10010 August 2015 NRC000222 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15222B1242015-08-10010 August 2015 ENT000680 - Curriculum Vitae of Barry M. Gordon ML15222B1262015-08-10010 August 2015 ENT000687 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15222B1612015-08-10010 August 2015 ENTR00186 - Curriculum Vitae of Mark A. Gray ML15222A8482015-08-10010 August 2015 ENT000637 - NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) 2016-03-21
[Table view] |
Text
NYS000081 Submitted: December 14, 2011 EXCERPT STATE OF NEW YORK PUBLIC SERVICE COMMISSION At a session of the Public Service Commission held in the City of Albany on January 15, 2009 COMMISSIONERS PRESENT:
Garry A. Brown, Chairman Maureen F. Harris Robert E. Curry, Jr.
James L. Larocca CASE 08-E-1003 - Petition of Orange and Rockland Utilities, Inc.
for Approval of an Energy Efficiency Portfolio Standard (EEPS) "Fast Track" Utility-Administered Electric Energy Efficiency Program.
CASE 08-E-1007 - Petition of Consolidated Edison Company of New York, Inc. for Approval of an Energy Efficiency Portfolio Standard (EEPS) "Fast Track" Utility-Administered Electric Energy Efficiency Program.
CASE 08-E-1014 - Petition of Niagara Mohawk Power Corporation for Approval of an Energy Efficiency Portfolio Standard (EEPS) "Fast Track" Utility-Administered Electric Energy Efficiency Program.
CASE 08-E-1019 - Petition of Central Hudson Gas & Electric Corporation for Approval of an Energy Efficiency Portfolio Standard (EEPS) "Fast Track" Utility-Administered Electric Energy Efficiency Program.
ORDER APPROVING "FAST TRACK" UTILITY-ADMINISTERED ELECTRIC ENERGY EFFICIENCY PROGRAMS WITH MODIFICATIONS (Issued and Effective January 16, 2009)
OAGI0001113_00001
CASE 08-E-1003, et al.
BY THE COMMISSION:
INTRODUCTION In this order, the Commission approves, with modifications, Energy Efficiency Portfolio Standard (EEPS) "Fast Track" utility-administered electric energy efficiency programs for Central Hudson Gas & Electric Corporation (Central Hudson),
Consolidated Edison Company of New York, Inc. (Con Edison),
Orange and Rockland Utilities, Inc. (O&R) and Niagara Mohawk Power Corporation (Niagara Mohawk). The "Fast Track" utility-administered electric energy efficiency programs consist of a Small Business Direct Installation Program (Small Business Program) and a Residential Energy Star electric heating, ventilation and air conditioning program (Residential HVAC Program). O&R is given only a one-year authorization for its Residential HVAC Program as modified and Niagara Mohawk is directed to proceed with its Residential HVAC Program but to file revisions.
BACKGROUND AND
SUMMARY
On June 23, 2008,1 the Commission adopted a goal of reducing electricity usage (as forecast in 2007) by 15%
statewide by 2015. An Energy Efficiency Portfolio Standard (EEPS) program was created for New York State to develop and encourage cost-effective energy efficiency over the long term, and immediately to commence or augment near-term efficiency measures. The six large investor-owned electric utilities were invited to submit for approval proposals for certain "Fast Track" utility-administered electric energy efficiency programs.
The program plans were to include detailed benefit/cost estimates using the Total Resource Cost methodology and were to 1
Case 07-M-0548, Energy Efficiency Portfolio Standard (EEPS),
Order Establishing Energy Efficiency Portfolio Standard and Approving Programs (issued June 23, 2008).
OAGI0001113_00002
CASE 08-E-I003, et al.
demonstrate that collaborative discussions had been held including participating utilities, the New York State Energy Research and Development Authority (NYSERDA), and other interested parties to establish uniformity, particularly with respect to eligible equipment and rebate levels, to the extent compatible with the needs of utilities to design programs that meet the needs of their service territories. The program plans were also to include a detailed plan for evaluation of each individual program, including details on the scope and method of measurement and verification activities. The Commission stated program cost and megawatt-hour efficiency savings targets for the desired program proposals (for details, see attached Appendix 1, Table 1).
Central Hudson, Con Edison, O&R and Niagara Mohawk filed petitions seeking approval of Energy Efficiency Portfolio Standard (EEPS) "Fast Track" utility-administered electric energy efficiency programs (collectively, the "Electric Petitions"). New York State Electric & Gas Corporation (NYSEG) and Rochester Gas & Electric Corporation (RG&E) did not file 2
proposals. The following tables summarize the filings in relation to the key metrics in the original Commission targets:
Central Hudson EEPS Order As Filed Difference Residential HVAC Program MWh Savings 1,976 2,922 47.9%
Total Budget $1,782,518 $2,330,505 30.7%
BIC Ratio 3.9 2.0 -48.5%
$$/MWh $902 $798 -11.6%
2 NYSEG and RG&E later filed program proposals for similar programs, but not on the expedited basis established in the June 23, 2008 Order.
OAGI0001113_00003
CASE 08-E-I003, et al.
Central Hudson EEPS Order As Filed Difference Small Business Program MWh Savings 45,803 45,360 -1.0%
Total Budget $12,286,910 $12,370,030 0.7%
BIC Ratio 2.7 3.6 34.4%
$$/MWh $268 $273 1.7%
Con Edison EEPS Order As Filed Difference Residential HVAC Program MWh Savings 12,461 12,569 0.9%
Total Budget $11,243,211 $11,128,323 -1.0%
BIC Ratio 3.9 3.2 -18.7%
$$/MWh $902 $885 -1.9%
Small Business Program MWh Savings 288,902 289,875 0.3%
Total Budget $77,499,523 $76,702,688 -1.0%
BIC Ratio 2.7 2.4 -10.7%
$$/MWh $268 $265 -1.4%
O&R EEPS Order As Filed Difference Residential HVAC Program MWh Savings 1,461 949 -35.0%
Total Budget $1,318,412 $1,917,383 45.4%
BIC Ratio 3.9 2.2 -43.6%
$$/MWh $902 $2,020 123.9%
Small Business Program MWh Savings 33,877 35,912 6.0%
Total Budget $9,087,821 $16,800,667 84.9%
BIC Ratio 2.7 2.3 -14.8%
$$/MWh $268 $468 74.4%
Note: For O&R, "As Filed" includes O&R's so-called "90 Day" revisions.
OAGI0001113_00004