UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 7, 2011 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

TURKEY POINT UNIT 3 AND UNIT 4 - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Nazar:

During the week of January 23 - 27, 2012, the NRC will conduct baseline radiation safety inspection activities at your Turkey Point Nuclear Plant site. The inspection will evaluate activities in the Public Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124.06 and IP 71124.07.

Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has requested that the subject informational material be made available to the NRC staff by January 13, 2012, if not earlier, to allow preparation for the upcoming inspection We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Stavroula Mihalakea of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658.

FP&L 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251, License Nos.: DPR-31, DPR-41

Enclosure:

Public Radiation Safety Inspection Document Request cc w/encl: (See page 3)

FP&L 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-250, 50-251, License Nos.: DPR-31, DPR-41

Enclosure:

Public Radiation Safety Inspection Document Request cc w/encl: (See page 3)

(*) See previous concurrence page X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML113410408 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE DRS/PSB1 DRS/PSB1 SIGNATURE RA/GK

  • RA/BB
  • NAME G. KUZO B. BONSER DATE 12/07/2011 12/07/2011 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRSII\\PSB1\\INFORMATION REQUEST LETTERS\\TURKEY POINT\\2012001_PTN_RFO_LTTR REV1.DOCX

FP&L 3

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Michael Kiley Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Niel Batista Emergency Management Coordinator Department of Emergency Management and Homeland Security Electronic Mail Distribution Robert J. Tomonto Licensing Manager Turkey Point Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Eric McCartney Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Mitch S. Ross Vice President and General Counsel Nuclear Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission 9762 SW 344th St.

Florida City, FL 33035 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 County Manager of Miami-Dade County 111 NW 1st Street, 29th Floor Miami, FL 33128 Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution George Gretsas City Manager City of Homestead Electronic Mail Distribution

Enclosure PUBLIC RADIATION SAFETY INSPECTION DOCUMENT REQUEST SITE: Turkey Point Nuclear Plant (PTN) Units 3 & 4 REPORT NUMBER:

05000250, 251/2012001 INSPECTION DATES:

January 23 - 27, 2012 NRC INSPECTORS:

George B. Kuzo, George.Kuzo@NRC.GOV (404) 997-4658 N. Jeff Griffis, Jeff.Griffis@NRC.GOV (423) 855-6639 PRELIMINARY LICENSEE CONTACTS: Radiation Protection: Cynthia Cashwell (RPM) (305 246-1631/Bill Hinson (-6012); Chemistry: Gabriel Mendoza (-6866 [O] / 786-525-6051 [C]), or Paul Skinner (-6134); Ventilation: Ed Lyons (-6967) and Licensing/Compliance: Stavroula Mihalakea (-6454)

Inspection Procedures:

IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program Note: This is a broad list of the documents the lead NRC inspector will be interested in reviewing and obtaining during the pre-inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available. (The preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.

CD-ROM. Information in the document lists should contain enough information to be easily understood by someone who has knowledge of the subject. During the inspection, the inspectors may request additional documents.

Documentation is requested from January 2009, to the present for all items.

We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review. If any of the requested information is too burdensome to provide electronically or as hard copies, simply indicate that the requested material is available for on-site review by the inspectors.

If you have any questions, please call George B. Kuzo at (404) 997-4658. Thank you in advance for your efforts in putting together this material.

RADIOACTIVE GASEOUS AND LIQUID EFFLUENT TREATMENT [IP 71124.06]

Provide the following:

Copies of the CY 2009 and CY 2010 Annual Radiological Effluent Release Report (ARERR) documents; Procedures/Guidance Documents for collection, analysis, release and dose evaluations for gaseous and/or liquid effluents, including guidance for both batch and continuous

2 Enclosure effluent release modes; determination of set-points for main plant gaseous and liquid effluent discharge pathways; Provide a copy of the current ODCM revision and a list of any significant changes to the ODCM since January 1, 2009; Provide a list of any non-radioactive systems that have become contaminated since January 1, 2009; Provide a list of any abnormal gaseous or liquid releases identified since January 1, 2009; Provide a list of 10 CFR 50.75(g) entries made since January 1, 2009; Provide system health reports for radiological effluent waste process monitoring systems since January 1, 2009; Provide a list of the main liquid and gaseous effluent pathway process monitors listed as out-of-service (OOS) since January 1, 2009. [Note do not include monitors listed as OOS for less than 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s];

Provide a list of significant changes to the effluent monitoring program or equipment since January 1, 2009, Provide groundwater monitoring results since January 1, 2009; Provide records since January 1, 2009, for:

detailed inter-laboratory comparison program results; and list of abnormal liquid and gaseous releases.

Provide records of the two most recent HEPA ventilation and Charcoal filtration surveillance results for each of the following systems:

Unit 3 Control Room A Train; Unit 4 Post-Accident Containment Vent System; Unit 3 B Emergency Containment Filtration System.

Provide copies of all audits, self-assessments, and/or reviews of liquid and gaseous effluent monitoring program activities since January 1, 2009. The data should include any reviews conducted of vendor activities and their facilities; Provide List of Action Request (AR) / Condition Report (CR) documents generated since January 1, 2009, as a result of gaseous and liquid effluent processing and/or release Activities; and TS HEPA ventilation systems. [Note: only titles/summary statement should be provide for use by the inspectors to select a sample of issues for in-depth review].

RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM (REMP) [IP 71124.07]

Prior to the Onsite Inspection Provide Copies of the CY 2009 and CY 2010 Annual Radiological Environmental Operating Report (AREOR) documents; Provide Procedures/Guidance Documents for:

collection and analysis of environmental samples; calibration and maintenance of REMP air and/or water samplers; calibration of meteorological monitoring instrument loop (wind speed & direction, air temperature sensors currently in use); and monthly/quarterly meteorological instrumentation surveillance requirements (control room and local tower activities).

Provide records since January 1, 2009, for:

calibrations of REMP air and water sampling equipment (as applicable);

meteorological monitoring instrument calibrations (wind speed & direction, air temperature); and detailed inter-laboratory comparison program results.

3 Enclosure Provide copies of all audits, self-assessments, and/or reviews of REMP activities. The data should include any reviews conducted of vendor activities and their facilities; Provide a list of systems, structures, or components (SSCs), identified as credible mechanism(s) having the potential for release of licensed material to the groundwater environs; Provide a list of significant REMP changes documented within the ODCM since January 1, 2009; and Provide a list of Action Request / Condition Report documents generated as a result of REMP and Meteorological Monitoring activities since January 1, 2009. [Note: only titles/summary statement should be provided for use by the inspectors to select a sample of issues for in-depth review]