December 2, 2011

Mr. Eric W. Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000458/2012002) AND REQUEST FOR INFORMATION

Dear Mr. Olson:

From January 30 through February 10, 2012, Reactor Inspectors from the U.S. Nuclear

Regulatory Commissions (NRC) Region IV office will perform the baseline inspection of

changes, tests, experiments, and permanent plant modifications at River Bend Station, using

NRC Inspection Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and

Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Upon review of these documents, the inspectors will select additional documentation for review

upon arrival. It is important that all of these documents are up-to-date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Christina Perino of your regulatory affairs

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector Wayne Sifre at 817-200-1193 or by email (wayne.sifre@nrc.gov).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Mr. E. Olson

-3-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-458

Licenses: NPF-47

Enclosure:

Information Request for River Bend Station

Evaluations of Changes, Tests, or Experiments and

Permanent Plant Modifications Inspection

cc: via Electronic Distribution for River Bend

Mr. E. Olson

-3-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (Mark.Franke@nrc.gov)

DRS/TSB STA (Dale.Powers@nrc.gov)

R:\\

ADAMS ML

ADAMS: No x Yes

x SUNSI Review Complete

Reviewer Initials:TRF

x Publicly Available

x Non-Sensitive

Non-publicly Available

Sensitive

DRS/EB1/SRI

DRS/EB1/BC

WSifre

TFarnholtz

/RA/

/RA/

11/30/2011

12/2/2011

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

Evaluations of Changes, Tests, or Experiments and Permanent Plant Modification

Inspection Dates:

January 30 - February 10, 2012

Inspection Procedures:

IP 71111.17 Evaluation of Changes, Tests, or Experiments and

Permanent Plant Modifications

Inspectors:

Wayne Sifre, Senior Reactor Inspector, Lead Inspector

Shiattin Makor, Reactor Inspector

Dustin Reinert, Reactor Inspector

Information Requested for sample selection and the In-Office Preparation Week

The information in Section I and Section II should be sent to the Region IV office in hard copy or

electronic format (Certrec database preferred), in care of Wayne Sifre. To facilitate the

selection of specific items that will be reviewed during the onsite inspection week, please submit

Section I by January 2, 2012 and Section II by January 23, 2012. We ask that you categorize

the documents in your response with the numbered list below. If requested documents are

large and only hard copy formats are available, please inform the inspectors. If you have any

questions regarding this information request, please call the lead inspector as soon as possible.

Section I (Information by January 2, 2012)

The first group lists information necessary for our initial inspection scoping. Upon review of

these documents, the inspectors will select a number of samples greater than required sample

size. This will allow for the inspectors to focus on the most safety significant requests.

Note: Description of screenings should be of sufficient detail that inspectors can determine the

significance of the issue.

1. A list with descriptions, of all 10 CFR 50.59 screenings (or equivalent) performed since

February 24, 2009, which did not result in an evaluation.

2. A list with descriptions, of all 10 CFR 50.59 evaluations performed which did not result in

an application for license amendment to NRC and meet the following criteria from

February 24, 2009, to the present.

Updated Final Safety Analysis Report changes that have been updated in

accordance with 10 CFR 50.71(e)(4).

Modifications that are field work complete.

Changes to calculations that have been issued

3. A list with descriptions of all permanent plant modifications dating from February 24,

2009. For this inspection, permanent plant modifications include permanent plant

changes, design changes, setpoint changes, procedure changes, equivalency

evaluations, suitability analyses, calculations, and commercial grade dedications.

- 2 -

Enclosure

4. A list with descriptions of all Corrective Action documents related to 50.59 activities,

including screenings and evaluations and your permanent plant modification program

and its implementation since February 24, 2009.

Section II (Information by January 23, 2012)

The second group of documents requested is needed to support our in-office preparation week

and our on-site inspection activities. It is also requested that corrective action documents and

responses to questions developed during the inspection be provided to the inspector as the

documents are generated.

5. Complete documentation/packages pertaining to the requested 50.59 screens, 50.59

evaluations, modifications, and corrective action documents to support final sample

selection.

6. River Bend Station procedures for conducting 10 CFR 50.59 screenings and

evaluations.

7. A listing of personnel qualified to prepare 10 CFR 50.59 screenings and evaluations,

including qualification dates.

8. A listing of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

9. River Bend Station procedures for implementing and controlling permanent plant

modifications.

Inspector Contact Information:

Wayne Sifre

Shiattin Makor

Dustin Reinert

Senior Reactor Inspector

Reactor Inspector

Reactor Inspector

817-860-8193

817-276-6507

817-860-8244

wayne.sifre@nrc.gov

shiattin.makor@nrc.gov

dustin.reinert@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Wayne Sifre

1600 E. Lamar Blvd.

Arlington, TX 76011-4511