Category:License-Operator
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16321A2432016-10-20020 October 2016 2016-10 Final Written Exam 2024-08-02
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24250A0182024-08-0202 August 2024 DC-2024-07 Public Forms DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis IR 05000275/20243012024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20213012023-08-0909 August 2023 Errata for Diablo Canyon Power Plant, Units 1 and 2 - NRC Examination Report 050002752021301 and 050003232021301 ML22342B2442022-12-13013 December 2022 DC-2023-07 Corporate Notification Letter DCL-21-017, DC-2021-01 Post Exam Comments Analysis2021-02-12012 February 2021 DC-2021-01 Post Exam Comments Analysis ML21075A2312021-02-12012 February 2021 DC-2021-01 Public Forms DCL-20-017, 2020-02-Post-Exam Comments2020-03-18018 March 2020 2020-02-Post-Exam Comments ML20106E2762020-03-0606 March 2020 2020-02-Public Forms ML20106E4662020-03-0606 March 2020 2020-02-DRAFT Outlines ML20106F1862020-03-0606 March 2020 2020-02-Form ES-403-1-Written Examination Grading.Pdf ML20106E4632020-03-0606 March 2020 2020-02-DRAFT Operating Test ML20106E4612020-03-0606 March 2020 2020-02-DRAFT Operating Test Comments ML20097A4462020-03-0606 March 2020 2020-02-FINAL Operating Test ML20106E4652020-03-0606 March 2020 2020-02-Draft Outline Comments ML20097A4502020-03-0606 March 2020 2020-02-FINAL Written Exam ML20106E4672020-03-0606 March 2020 2020-02-DRAFT Written Exam Comments ML20106E4682020-03-0606 March 2020 2020-02-DRAFT Written Exam ML20106E4702020-03-0606 March 2020 2020-02-FINAL Outlines DCL-19-027, Supplement to Request for Exemption from Operator Written Examination and Operating Test2019-04-0303 April 2019 Supplement to Request for Exemption from Operator Written Examination and Operating Test ML19007A1132019-01-0303 January 2019 NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301 DCL-18-039, Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-05-14014 May 2018 Response to NRC Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations IR 05000275/20183012018-03-20020 March 2018 NRC Examination Report 05000275/2018301; 05000323/2018301 ML18064A3562018-02-27027 February 2018 DC 2018-01 Post Examination Analysis ML18064A3482018-02-0909 February 2018 DC 2018-01 Draft Operating Test Comments ML18081A9642018-02-0909 February 2018 DC 2018-01 Public Forms ML18064A3572018-02-0909 February 2018 DC-2018-01 Draft Written Examination ML18064A3502018-02-0909 February 2018 DC 2018-01 Draft Outline Comments ML18064A3542018-02-0909 February 2018 DC 2018-01 Final Outlines ML18064A3552018-02-0909 February 2018 DC 2018-01 Final Written Examination ML18064A3532018-02-0909 February 2018 DC 2018-01 Final Operating Test ML18064A3522018-02-0909 February 2018 DC 2018-01 Draft Written Examination Comments ML18064A3492018-02-0909 February 2018 DC 2018-01 Draft Operating Test ML18064A3512018-02-0909 February 2018 DC 2018-01 Draft Outlines ML18019A0162018-01-19019 January 2018 NRC Initial Operator Licensing Examination Approval 05000275/2018301; 05000323/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 DCL-17-042, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17103A2512017-04-13013 April 2017 Notification of NRC Initial Operator Licensing Examination 05000275/2018301; 05000323/2018301 ML16321A2602016-10-20020 October 2016 2016-10 Final Operating Test ML16336A5572016-10-20020 October 2016 2016-10 Draft Operating Test ML16336A5752016-10-20020 October 2016 2016-10 Final Outlines ML16336A5732016-10-20020 October 2016 Diablo-2016-10 Draft Written Examination ML16336A5722016-10-20020 October 2016 2016-10 Draft Outlines ML16337A0232016-10-20020 October 2016 2016-10 Public Forms ML16336A5782016-10-20020 October 2016 2016-10 Written Exam Comments ML16336A5762016-10-20020 October 2016 2016-10 Operating Test Comments ML16321A3212016-10-20020 October 2016 2016-10 Post Examination Comments DCL-16-112, Diablo Canyon-2016-10 Post Examination Comments2016-10-20020 October 2016 Diablo Canyon-2016-10 Post Examination Comments 2024-08-02
[Table view] |
Text
Diablo Canyon-2011-11 DRAFT OPERATING TEST COMMENTS ADMIN JPMS
- 4. Job Content
- 3. Attributes
- 1. 2. Errors 6.
5.
JPM# Dyn LOD Explanation U/E/S (D/S) (1-5) IC Cues Critical Scope Over- Job- Minutia (See below for instructions)
Focus Steps (N/B) lap Link RO (A1) NA RO (A2) NA RO (A3) NA RO (A4) NA SRO (A5) NA SRO (A6) NA SRO (A7) NA SRO (A8) NA SRO (A9) NA Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
- 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
- 3. Check the appropriate box when an attribute weakness is identified:
- The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
- The JPM does not contain sufficient cues that are objective (not leading).
- All critical steps (elements) have not been properly identified.
- Scope of the task is either too narrow (N) or too broad (B).
- Excessive overlap with other part of operating test or written examination.
- 4. Check the appropriate box when a job content error is identified:
- Topics not linked to job content (e.g., disguised task, not required in real job).
- Task is trivial and without safety significance.
- 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 6. Provide a brief description of any U or E rating in the explanation column.
- 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 1 of 3 OBDI 202 - IOLE Process
Diablo Canyon-2011-11 DRAFT OPERATING TEST COMMENTS CONTROL ROOM/IN-PLANT SYSTEMS JPMS
- 4. Job Content
- 1. 2. 3. Attributes 6.
Errors 5.
JPM# Dyn LOD Explanation IC Cues Critical Scope Over- Job- Minutia U/E/S (D/S) (1-5) (See below for instructions)
Focus Steps (N/B) lap Link S1 NA S2 NA S3 NA S4 NA S5 NA S6 NA S7 NA S8 NA P1 NA P2 NA P3 NA Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating tests. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. Determine whether the task is dynamic (D) or static (S). A dynamic task is one that involves continuous monitoring and response to varying parameters. A static task is basically a system reconfiguration or realignment.
- 2. Determine level of difficulty (LOD) using established 1-5 rating scale. Levels 1 and 5 represent inappropriate (low or high) discriminatory level for the license being tested.
- 3. Check the appropriate box when an attribute weakness is identified:
$ The initiating cue is not sufficiently clear to ensure the operator understands the task and how to begin.
$ The JPM does not contain sufficient cues that are objective (not leading).
$ All critical steps (elements) have not been properly identified.
$ Scope of the task is either too narrow (N) or too broad (B).
$ Excessive overlap with other part of operating test or written examination.
- 4. Check the appropriate box when a job content error is identified:
- Topics not linked to job content (e.g., disguised task, not required in real job).
- Task is trivial and without safety significance.
- 5. Based on the reviewer=s judgment, is the JPM as written (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory?
- 6. Provide a brief description of any U or E rating in the explanation column.
- 7. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 2 of 3 OBDI 202 - IOLE Process
Diablo Canyon-2011-11 DRAFT OPERATING TEST COMMENTS SCENARIOS Scenario 1. 2. 3. 4. 5. 6. 7. 8. 9.
- 10. Explanation (See below for instructions)
Set ES TS Crit IC Pred TL L/C Eff U/E/S 1 S No Comments 2 S No Comments 3
Instructions for Completing Matrix This form is not contained in or required by NUREG-1021. Utilities are not required or encouraged to use it. The purpose of this form is to enhance regional consistency in reviewing operating test scenario sets. Additional information on these areas may be found in Examination Good Practices Appendix D. Check or mark any item(s) requiring comment and explain the issue in the space provided.
- 1. ES: ES-301 checklists 4, 5, & 6 satisfied.
- 2. TS: Set includes SRO TS actions for each SRO, with required actions explicitly detailed.
- 3. Crit: Each manipulation or evolution has explicit success criteria documented in Form ES-D-2.
- 4. IC: Out of service equipment and other initial conditions reasonably consistent between scenarios and not predictive of scenario events and actions.
- 5. Pred: Scenario sequence and other factors avoid predictability issues.
- 6. TL: Time line constructed, including event and process triggered conditions, such that scenario can run without routine examiner cuing.
- 7. L/C: Length and complexity for each scenario in the set is reasonable for the crew mix being examined, such that all applicants have reasonably similar exposure and events are needed for evaluation purposes.
- 8. Eff: Sequence of events is reasonably efficient for examination purposes, especially with respect to long delays or interactions.
- 9. Based on the reviewer=s judgment, rate the scenario set as (U)nacceptable (requiring repair or replacement), in need of (E)ditorial enhancement, or (S)atisfactory.
- 10. Provide a brief description of problem in the explanation column.
- 11. Save initial review comments as normal black text; indicate how comments were resolved using blue text so that each JPM used on the exam is reflected by a (S)atisfactory resolution on this form. 0 Page 3 of 3 OBDI 202 - IOLE Process