ML113190861

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures A.2-406 Re Offsite Dose Projection & A.2-422 Re Stack Iodine/ Particulate Sampling & Analysis
ML113190861
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/08/1983
From: Ward P
Northern States Power Co
To:
NRC/OI/RGN-III/FO
Shared Package
ML113190860 List:
References
NUDOCS 8303090691
Download: ML113190861 (1)


Text

  • 9 A

Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 Telephone (612) 330-5500 February 8, 1983 Regional Administrator Region III U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No.

DPR-22 Emergency Response Plan Implementing Procedures Furnished with this letter is one copy of revisions to Generating Plant Emergency Implementing Procedures.

These revisions include the following procedures:

List of Current Procedures A.2-406 Off-site Dose Projection A.2-422 Stack Iodine/Particulate Sampling & Analysis A.2-423 Reactor Building Vents Iodine/Particulate Sampling and Analysis We.have deleted telephone numbers from the copies sent which will be docketed.

the Monticello Nuclear (Dated 1/31/83)

(Pages.1 thru 17) REV 6 (Pages 1 thru 5) REV 1 (Pages 1 thru 5) REV 1 to NRR, a portion of E C Ward, P E Manager-Nuclear Environmental Services ECW/GDH/dab Encls cc: Director of NRR (2)

NRC Resident Inspector (w/o enclosure)

G Charnoff (w/o enclosure)

( 00!r 8303090691 830302 PDR ADOCK 05000263 F

PDR I