Text
ACCELERATED D8TRIBUTION DEMONS-ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9109110110 DOC.DATE: 91/08/29 NOTARIZED: NO DOCKET #
FACIL:50-263 Monticello Nuclear Generating Plant, Northern States 05000263 50-282 Prairie Island Nuclear Station, Unit 1, Northern Stat 05000282 50-306 Prairie Island Nuclear Station, Unit 2, Northern Stat 05000306 AUTH.NAME AUTHOR AFFILIATION FEY,F.L.
Northern States Power Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 14 to Corporate Nuclear Emergency Plan to incorporate changes as result of annual internal review, update & certification of emergency plans & agreements.
DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR IENCL /
SIZE:
)L3L TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedures, C NOTES:NRR/LONG,W.
05000263 RECIPIENT ID CODE/NAME PD3-1 PD MASCIANTONIO INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL:
NRC PDR COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME LONG,B.
1 1
NRR/DREPIPE PB9D 1
1 REGILE 1
1 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 9
ENCL 9
R I
D S
/
A D
D S
R D
S A
D D
S Vt
Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 August 29, 1991 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 CORPORATE NUCLEAR EMERGENCY PLAN MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Furnished with this letter is a copy of Revision 14 to the NSP Corporate Nuclear Emergency Plan. This revision contains changes as a result of our annual internal
- review, update, and certification of emergency plans and agreements.
As such, revisions to this plan have been reviewed and approved and do not decrease the effectiveness of this plan.
Significant changes have been identified with the use of a vertical line in the margin.
It should be noted that the plant and Corporate Plans are companion documents.
Each plan does not, by itself, address or reference all of the emergency planning requirements or guidance criteria. It is intended that the plant plan cover site specific requirements and that the Corporate Plan cover off-site requirements and functions normally assigned to the corporate offices.
Instructions:
Replace the existing Emergency Plan pages with the attached revised pages.
Colored slip sheets indicate -tab placement.
All superseded pages should be destroyed and plan holders should review the changes in this revision.
Posting should be completed, and the attached ACKNOWLEDGEMENT OF RECEIPT RETURNED WITHIN TEN (10)
WORKING DAYS.
9109110110 910829 PDR ADOCK 05000263 F
Attached is the summary of revision 14 to the Corporate Emergency Plan.
If you have any questions regarding the revisions to or distribution of the plan, please contact Lisa Vrieze at (612) 337 20 2.
F L Fey Nuclear Radiological Services Attachments
-Summary of Revision 14 to the Corporate Emergency Plan
-Corporate Emergency Plan cc:
USNRC -
Incident Response Center (w/o attachment)
NRC Resident Inspector - Monti (w/o attachment)
NRC Resident Inspector -
PI (w/o attachment)
J Silberg (w/o attachment)
File (w/o attachment)
FLF/ lmv
Internal Corresponcwe Date September 5, 1991 From Michael Offerdahl Location IC 4 To Donald Martin Location IC 4 Subject Summary of Revision 14 to the Corporate Emergency Plan The following summarizes the changes incorporated in revision 14 of the Corporate Emergency Plan:
GENERAL The creation of the Site General Manager position at each of the nuclear plants has resulted in a reorganization of the reporting structure at each site. As a result the EOF Response Organization and the management of the EOF facility has been transferred from the Corporate Emergency Response Organization to the Site Emergency Response Organization.
The revisions to the Corporate Emergency Plan reflect this change.
Section 1 Section 1.1.24 was revised to remove reference of the EOF from the Corporate Emergency Response Organization.
Section 2 Section 2
page 1 of 3
was revised to only discuss functions applicable to the HQEC and remove those functions which are applicable to the EOF.
Section 3 No changes Section 4 Section 4 page 10 Corporate ERO was revised to remove the EOF Organization from the Corporate Emergency Response Organization chart.
The EOF organizational chart is contained in the Site Plans.
Section 5 Section. 5.1.2 was revised to remove specific EOF functions from the Corporate Plan since this information is presented in greater detail in the site plans.
Tab A was completely revised to reflect the Monticello EOF modifications.
Section 6 Section 6.1.1 Site has been substituted for Plant and added a statement describing where a detailed description of the activation process was located.
Section 6.1.2 Site has been substituted. for plant and reference to EOF removed from Corporate Activation.
Section 6.2.1 Site has been substituted for plant.
Section 6.2.2 Site has been substituted for plant and the detail of EOF operations has been removed since they are contained in the site plans.
Section 9 Figure 9-1 Title was revised to remove Corporate since the recovery organization falls under the Site Manager.
Appendix A was revised to reflect biannual updating of the letters of agreement.
Respectfully, Michael Of ferdahl Coordinator, Corporate Emergency Preparedness