ML113110636
| ML113110636 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 02/20/1990 |
| From: | Parker T Northern States Power Co |
| To: | NRC/IRM |
| Shared Package | |
| ML113110635 | List: |
| References | |
| TAC-75101 NUDOCS 9002260129 | |
| Download: ML113110636 (3) | |
Text
ACCELERATED DISBUTION DEMONSTR0ON SYTTEM REGULATO NFORMATION DISTRIBUTION WTEM (RIDS)
ACCESSION NBR:9002260129 DOC.DATE: 90/02/20 NOTARIZED: NO DOCKET #
FACIL:50-263 Monticello Nuclear Generating Plant, Northern States 05000263 AUTH.NAME AUTHOR AFFILIATION PARKER,T.M.
Northern States Power Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards addl info re proposed in-vessel visual PT insp schedule for plant feedwater nozzles,per 900112 ltr.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal: Inservice Inspection/Testing/Relief SIZE:
from ASME ode NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA LONG,B.
INTERNAL: AEOD/DSP/TPAB NRR/DET/EMEB 9H OC/LF MB EG FILE 0_>
EXTERNAL: EG&G BROWN,B LPDR NSIC COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1 O0 1
1 1
1 1
RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EG&G RANSOME,C NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 0
1 1
1 N=IE TO ALL "RIDS" RECIPIEIS:
PIEASE HELP US TO RE 1ASTE! CDNIACT THE DOCJMENI (INIRL DESK, ROOM Pl-37 (EXT.
20079)
M10 ELIMNTE !00 NME FRCH DISTRBUTIN LISTS FOR DOCUMEWNS YOU DCAV T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR IR I
D S
D D
S R
I D
S A
D S
20 ENCL 17 I.p/
0
&W February 20, 1990 Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 TAG 75101 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Additional Information Related to Proposed In-Vessel Visual PT Inspection Schedule for Monticello Feedwater Nozzles This letter responds to a letter dated January 12, 1990, requesting additional information on the proposed Monticello Feedwater Nozzle Inservice Inspection Program. This letter asked for information to supplement our request for approval of our proposed long term feedwater nozzle monitoring and inspection program which was transmitted to your office by letter dated October 4, 1990.
Your request for additional information asked that we:
- 1.
Provide a brief summary of inservice inspections performed on the feedwater nozzles, and the total number of startup/shutdown cycles since the 1981 installation of the welded thermal sleeve spargers.
- 2.
Submit a copy of our Feedwater Nozzle inspection procedures.
- 3.
Provide a brief description of UT equipment and procedures specifically used for the Feedwater Nozzle Inspection Program, including a discussion of the inspector qualifications, mockups, calibration techniques, etc.
00263 F-J L:c-AOp 44o1
S Northern States Power Company Director of NRR February 20, 1990 Page 2 to this letter contains the information requested in items 1 and
- 3. Attachment 2 contains our Feedwater Nozzle Inspection Procedures.
Please contact us if you have any questions related to this response.
Manager Nuclear Support Services c:
Regional Administrator, Region III NRR Project Manager, NRC Resident Inspector, NRC G Charnoff (Without Attachment 2)
Attachments:
- 1) Additional Information Relating to the Proposed In-Vessel Visual PT Inspection Schedule for Monticello Feedwater Nozzles
- 2) Feedwater Nozzle Inspection Procedures