Plant Issues Tracking Application (PITA) Entries 9/30/11 Entry:
Sept. 29, 1740, the licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. The licensee plans to commence excavation today to locate the source of the tritium. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/3/11 & 10/4/11 Entry:
Sept. 29, 1740: The licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/3 UPDATE: Excavation to locate the source of the tritium has proceeded through the weekend. Testing is in progress to determine the leak source.
10/5/11 Entry:
10/5 UPDATE: Two areas are excavated to gain access to pipes near the Unit 1 CST and Unit 1 reactor building. Guided wave scan and pipe pressure tests are being accomplished to aid in locating a pipe leak.
10/6/11 Entry:
10/6 UPDATE: Pressure tests have confirmed leakage on a suspected line identified by guided wave scan. Additional pressure tests are scheduled today to ensure no additional leak sources.
Identified leaking line will be abandoned in place and a new line installed above ground.
10/11/11 Entry:
10/11 UPDATE: The licensee identified no additional leaks. Identified leaking line will be abandoned in place and a new line installed above ground.
All
Modify Plant Issue Page I of 1 plant status daily enter daily plant status branch chiet reports focus items pita search guides , ROl's drp items archives Siformtion Hatch Information for 09/30/2011 (Modify/Update)
Unit 1 status: (no commas, please)
[100% - GREEN Unit 2 status: (no commas, please)
" G G9.
REEN R./% ........... . ................
RCS Leak:
I...........
9:15mtg. C Yes (F No Routine Activities / TS Activities:
Unit 2 is holding at 91%/1000 psig due to 3 stage Target Rock SRV second stage pilot valve leakage. The licensee has scheduled an outage to perform Unit 2 SRV pilot valve replacement in mid-October.
Cask 2 of 6 for this campaign will be transferred to the ISFSI pad today.
-j add attachment Significant TS / Issues:
9:15 mtg. C( Yes t; No Risk Significant / Emergent Activities:
Sept. 29, 1740, the licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed.-The area the tritium was discovered is in the vicinity of the Unit 1 CST. The licensee plans to commence excavation today to locate the source of the tritium. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
9:15 mtg. C Yes (T No EIf add attachment Findings and Observations:
9:15 mtg. C Yes (F No Site Visits:
I..................................................................
... ..... ........... . . 2A 9:15 mtg. (- Yes OFNo Other:
PIT&R team conducted the exit Thursday afternoon.
Weekend coverage is available by the residents.
- 1 9:15 mtg. C Yes r- No [
add attachment update Last updated: 0t130120111 7:50AM http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=24704&sname=Hatch 10/18/2011
Modify Plant Issue Page 1 of 1 plant statu dal entrdail plantstau o ety Dealin archivs inomaton Hatch Information for 10/03/2011 (Modify/Update)
Unit 1 status: (no commas, please) 1100% -.GREEN . . . .
Unit 2 status: (no commas, please) 191% - GREEN RCS Leak:
I .......
9:15 mtg. C( Yes 17 No Routine Activities I TS Activities:
Unit 2 is holding at 91*11000 psig due to 3 stage Target Rock SRV second stage pilot valve leakage. The licensee has scheduled an outage to perform Unit 2 SRV pilot valve replacement in mid-October.
2C Plant Service Water pump is out, of ervice for a system outage.
II add attachment Significant TS / Issues:
Unt2 is holding at 9194/1000 psig due to 3 stage Target Rock 5EV second rsaepilot valve leakage. The licensee has scheduled an outage to perform Unt2 BEV pilot valve replacement in aid-October.
9:15 mtg. (- Yes r No add attachment Risk Siqnificant / Emerqent Activities:
Sept. 29, 1740: The licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/3 UPDATE: Exlcavation to locate the source of the tritium has proceeded through the weekend. Testing is in progress to determine the leak source.
9:15 mtg. ( Yes C No t' add attachment Findings and Observations:
9:15 mtg. C4 Yes C No Site Visits:
9:15 mtg. C Yes (- No Other:
9:15 mtg. C. Yes re No Last updaled: 10/03/2011 19:07 AM http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=24724&sname=Hatch 10/18/2011
Modify Plant Issue Page 1 of 1 plant status daily enter daily plant status safety mfeeting archives information Hatch Information for 10/05/2011 (Modify/Update)
Unit 1 status: (no commas, please) 11009% .'.GREEN . . ................... ................
Unit 2 status: (no commas, please) 188% - GREEN RCS Leak:
9:15 mtg. C Yes ,': No Routine Activities / TS Activities:
Unit 2 reduced power to 88% due to a partial loss of feedwater heater.
Unit 2 currently is limited by the licensee to 91%/1000 psig due to 3 stage Target Rock SRV second stage pilot valve leakage. The licensee has scheduled an outage to perform Unit 2 SRV pilot valve replacement in mid-October.
2C Plant Service Water pump is out of service for a system outage.
add attachment Significant TS tissues:
9:15mtg. 0 Yes (7 No Risk Significant / Emergent Activities:
Sept. 29, 1740: The licensee made a notification to the HOO (Event Number A.
47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/5 UPDATE: Two areas are excavated to gain access to pipes near the Unit 1 CST and Unit 1 reactor building. Guided wave scan and pipe pressure tests are being accomplished to aid in locating a pipe leak.
9: 5 mtg Y N.. ... ..
add attachment Findings and Observations:
9:15 mtg. r Yes ro No Site Visits:
9:15mtg. C Yes (F: No Other:
9:15 mtg. C( Yes (*: No Last updated: 15,550/2011 I 8:43 AM http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=24762&sname=Hatch 10/18/2011
Modify Plant Issue Page 1 of 2 Hatch Information for 10/06/2011 (Modify/Update)
Unit 1 status: (no commas. please) 1100% - GREEN Unit 2 status: (no commas, please) 191%- G R E E N . ...............................................................................
RCS Leak:
9:15 mtg. C Yes 6Z No Routine Activities / TS Activities: ,
Unit 2 currently is limited by the licensee to 91%/1000 psig due to 3 stage Target Rock SRV second stage pilot valve leakage. The licensee has scheduled an outage to perform Unit 2 SRV pilot valve replacement starting October 15.
2C Plant Service Water pump is out of service for a system outage.
add attachmen Significant TS / Issues:
9:15 mtg. C Yes (67 No Risk Significant / Emergent Activities:
Sept. 29, 1740: The licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/5 UPDATE: Two areas are excavated to gain access to pipes near the Unit 1 CST and Unit 1 reactor building. Guided wave scan and pipe pressure tests are being accomplished to aid in locating a pipe leak.
10/6 UPDATE: Pressure tests have confirmed leakage on a suspected line identified by guided wave scan. Additional pressure tests are scheduled today to ensure no additional leak sources. Identified leaking line will be abandoned in place and a new line installed above ground.
9:15mtg. G Yes C( No Re add attachment Findings and Observations:
I ...................................
9:15 mtg. C Yes ( No Site Visits:
9:15 mtg. C Yes (" No Other:
Weekend coverage scheduled.
9:15mtg. C Yes (" No [?
add attachment http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=2478 1&sname=Hatch 10/18/2011
Modify Plant Issue Page 1 of 2 plant status daily enter daily plant status safety meeting branch chief reports locus items pita search guides ROl'e drp items archives informatlon Hatch Information for 10/11/2011 (Modify/Update)
Unit 1 status: (no commas, please)
[100% - GREEN Unit 2 status: (no commas, please) 191% - GREEN EE.I ......
RCS Leak:
9:15 mtg. C( Yes iF; No Routine Activities / TS Activities:
Unit 2 currently is limited by the licensee to 91%/1000 psig due to 3 stage Target Rock SRV second stage pilot valve leakage. The licensee has scheduled an outage to perform Unit 2 SRV pilot valve replacement starting October 22.
add attachment Significant TS / Issues:
9:15 mtg. C( Yes OF:No Risk Significant / Emergent Activities:
Sept. 29, 1740: The licensee made a notification to the HOO (Event Number 47305)in accordance with 50.72(b)(2)(xi) - OFFSITE NOTIFICATION following notification to the Georgia DNR of tritium levels above background at onsite sample points. On Sept. 28, 2011, results from routine monitoring of groundwater indicated tritium above historical background levels at two sample points on site. Tritium concentrations up to 5.34 million picocuries per liter were observed. The area the tritium was discovered is in the vicinity of the Unit 1 CST. Additional samples have been taken and no tritium levels above background have been detected or migrated outside the area where the two sample points are located.
10/5 UPDATE: Two areas are excavated to gain access to pipes near the Unit 1 CST and Unit 1 reactor building. Guided wave scan and pipe pressure tests are being accomplished to aid in locating a pipe leak.
10/6 UPDATE: Pressure tests have confirmed leakage on a suspected line identified by guided wave scan. Additional pressure tests are scheduled today to ensure no additional leak sources.
10/11 UPDATE: The licensee identified no additional leaks. Identified leaking line will be abandoned in place and a new line installed above ground.
9:15mtg. 6 Yes C No _--
add attachment Findings and Observations:
9:15mtg. C Yes (*7 No Site Visits:
I.. ... .............
9:15 mtg. C Yes C, No Other:
9:15mtg. C Yes - No http://r2.nrc.gov/webapps/pita/Modifylssue.cfm?iid=24817 &sname=Hatch 10/18/2011