Browns Ferry NRC Material Control and Accounting Inspection Report 05000259/2011406, 05000260/2011406, and 05000296/2011406 - W/O Enclosure
ML113081723
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/04/2011
From: Guthrie E F
Division Reactor Projects II
To: James Shea
Tennessee Valley Authority
References
IR-11-406
Download: ML113081723 (5)


See also: IR 05000259/2011406

Text

November 4, 2011

Joseph Shea Acting Vice President, Nuclear Licensing Tennessee Valley Authority LP 4B 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT: BROWNS FERRY NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000259/2011406, 05000260/2011406, AND 05000296/2011406

Dear Mr. Shea:

On September 29, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Browns Ferry Nuclear Plant, Units 1, 2, and 3. The enclosed inspection report documents the inspection results, which were discussed on September 30, 2011, with Mr. C. J. Gannon and other members of your staff. This inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The attached report documents one NRC identified finding of very low security significance (Green) as determined by the Baseline Security Significance Determination Process. This deficiency was promptly corrected and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors completed the inspection. The finding had a cross-cutting aspect of Human Performance and Error Prevention in the Work Practices component of the Human Performance area because of the licensee's failure to perform adequate peer checks and independent reviews. [H.4.(a)] This finding was determined to involve a violation of NRC requirements. However, because of the very low safety significance and because it was entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) consistent with the Enforcement Policy. If you contest any NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to: (1) the Regional TVA 2 Administrator, Region II; (2) the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and (3) the Senior Resident Inspector at Browns Ferry Nuclear Plant. In addition, if you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II, and the Senior Resident Inspector at Browns Ferry Nuclear Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,/RA/

Eugene F. Guthrie, Chief Special Project, Browns Ferry Division of Reactor Projects Docket No.: 50-259, 50-260, 50-296 License No.: DPR-33, DPR-52, DPR-68

Enclosure:

NRC Material Control and Accounting Inspection Report 05000259/2011406, 05000260/2011406, AND 05000296/2011406

w/Attachment:

Supplemental Information cc w/encl.: (See page 3) TVA 2 Administrator, Region II; (2) the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and (3) the Senior Resident Inspector at Browns Ferry Nuclear Plant. In addition, if you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region II, and the Senior Resident Inspector at Browns Ferry Nuclear Plant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,/RA/

Eugene F. Guthrie, Chief Special Project, Browns Ferry Division of Reactor Projects Docket No.: 50-259, 50-260, 50-296 License No.: DPR-33, DPR-52, DPR-68

Enclosure:

NRC Material Control and Accounting Inspection Report 05000259/2011406, 05000260/2011406, AND 05000296/2011406

w/Attachment:

Supplemental Information cc w/encl.: (See page 3) X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:___ML113081723 X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP RII:DRP RII:DRP SIGNATURE Via email Via telecom Via email EFG /RA/ NAME CStancil TRoss CKontz EGuthrie DATE 10/31/2011 11/03/2011 11/02/2011 11/04/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB6\BROWNS FERRY\REPORTS\2011\406\BROWNS FERRY MCA 2011406-PUBLIC.DOCX TVA 3 cc w/o Encl: K. J. Polson Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution C.J. Gannon General Manager Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. E. Emens Manager, Licensing Browns Ferry Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution T. C. Matthews Manager, Corporate Nuclear Licensing - BFN Tennessee Valley Authority Electronic Mail Distribution E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority Electronic Mail Distribution Chairman Limestone County Commission 310 West Washington Street Athens, AL 35611 Donald E. Williamson State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 30317 Montgomery, AL 36130-3017 James L. McNees, CHP Director Office of Radiation Control Alabama Dept. of Public Health P. O. Box 303017 Montgomery, AL 36130-3017 4 Letter to from Eugene Guthrie dated November 4, 2011

SUBJECT: BROWNS FERRY NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000259/2011406, 05000260/2011406, AND 05000296/2011406 Distribution w/encl: RidsNrrPMBrownsFerry Resource C. Evans, RII L. Douglas, RII RIDSNRRDIRS OE Mail PUBLIC