ML112920216

From kanterella
Jump to navigation Jump to search
Organization Change
ML112920216
Person / Time
Site: Vallecitos Nuclear Center, 07000754, Vallecitos
Issue date: 10/19/2011
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, NRC/FSME, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
SPM 11-058
Download: ML112920216 (2)


Text

GE Hitachi Nuclear Energy SPM 11-058 October 19, 2011 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Reactor Regulation Washington, DC 20555-0001 US Nuclear Regulatory Commission Attn: Document Control Desk Director, Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Vallecitos Nuclear Center Organization Change

References:

1 - License TR-1, Docket 50-70 (GETR) 2-License DR-1O, Docket 505-183 (EVESR) 3-License DPR-1, Docket 50-18 (VBWR) 4-License R-33, Docket 50-73 (NTR) 5-SNM 960, Docket 70-754 Pursuant to the Technical Specifications requirements of References 1 and 4 this 30-day report is being provided regarding personnel changes in the Manager, Vallecitos Nuclear Center.

Specifically, License TR-1 Docket 50-70 (GETR), Technical Specification (6.6.2.2.a) requires issuance of a thirty day report for permanent changes in the facility organization involving Level 1-2 personnel while License R-33 Docket 50-73 Technical Specification (6.6.2.b) requires a written report within 30 days to the NRC following permanent changes in the facility organization involving Level 2 or Level 3 management.

Effective September 26, 2011 Mr. Anthony McFadden assumed the Manager, VNC role replacing Mr. Mark Varno and assumed full responsibility and authority defined for the Manager, VNC for all aspects associated with the Reference 1 Level 1 Organization Head and Reference 4 Level 3 Manager.

References 2, 3, and 5 do not contain specific requirements of this nature, but are reported here for completeness.

GE Hitachi Nuclear Energy Scott P. Murray Manager, Licensing & Liabilities 3901 Castle Hayne Road P.O. Box 780 Wilmington, NC 28402 USA (910) 819-5950 (910) 362-5950 scott.murray@ge.com

u.s. NRC October 19, 2011 If you have any questions in the above matters, please contact me.

Sincerely, f:!.~~~

Commitments: None cc:

John Buckley-NRC, NRR Project Manager Chris Ryder-NRC, NMSS Project Manager Tony McFadden-VNC GE Hitachi Nuclear Energy