ML11280A118
| ML11280A118 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/27/2011 |
| From: | Troyer G American Nuclear Society (ANS) |
| To: | Rulemaking, Directives, and Editing Branch |
| References | |
| 76FR54502 00033 | |
| Download: ML11280A118 (2) | |
Text
Eastern Washington Section - American Nuclear Society P.O. Box 784 9 Richland. WA 99352-0941
- ans-ews.org 20011-12 OFFICERS Gary' Trovcr Don Todd Chair Elect Tom Patten Past Chairman Eva Mr-t Secretary Carl Holder Treasurer BOARD OF DIRECTORS Bill Farris (03) q1// /)2! //1 Sentember 27. 20l11 Nuclear Regulatory Commission Public Ilearing, Richland Washington
' 1 Re: Renewal of Operating License for Energy Northwest's Columbia--Qeneratingu F Station Ciordon Crav.,ford 1I S3)
Daryl Prancis ( 13)
Ed Ray f 13)
COmM [flEE CIJA IRS Prozranis Floyd Ivey P~ublic Info'rmation (jer' WVondeock The Nuclear Regulatory Commission is chartered with overseeing the technical and operational safety of US nuclear power units. This agency is respected worldwide 6or its work in ensuring safe designs and operation. i'he Columbia Generating Station of Energy Northwest is an example of those efforts resulting in sustainable, reliable, dispatchable, and economical electrical energy for regional customers.
Renewing the operating license is supported by the Eastern Washington Section of the American Nuclear Society. This essential resource ensures that the region continues an abundance of base load electrical energy. Lack of renewal would require replacement with higher cost energy sources including a mix of carbon fuel supplies which is currently unnecessary. With reliability and capacity factors for scheduled operation approaching 100%. the Columbia Generating Station is our region's best supplement to hydropower.
Therefore, we fully endorse renewal of the operating license for Columbia Generating Station Membership Roger lhicdc id Rxa, Education 1-harty Uabad Marlenc Olver Richard Stout Topical Meetings Hans Toffer Awards Richard Stout Gerry Woodcock H Iistorian Wanda MLnn Sincerely Gary'L. Froyer Chairman - ANS-FWS Civic and lxgisiatixe Liaison Patt:ctia li caslct T~5~ ~
Ac mn.
od f.3/4pr-.-s.:w
&,)v, nre ihosc ;Ak Ow ri \\X'mgto sel'm ft Anurican Nuclear hocI~iei and do itot reflecrt elie xiissioni' cm the SiAUR:Iyai
2Q/201 I Perlormance Indicators - C(olmbia Gienerating Station http:/,/www.nrc.goviNIRI/OVERSIGIHT/ASSESS/WASH2i/wash2.pi.h...
-ki U.S.NRC Prn)tec in Peotple tintdh Me htvirw, lint, Home > Nuclear Reactors > Operating Reactors > Oversight > Reactor Oversight Process Columbia Generating Station 2Q/2011 Performance Indicators Licensee's General Comments: none Unplanned Scrams per 7000 Critical Hrs 15 5.2 15-20 25 Thresholds: White > 3.0 Yellow > 6.0 Red > 25.0 Notes Unplanned Scrams per 7000 Critical Hrs 3Q/09 4Q/09 1Q/10 2Q/10 3Q/10 4Q/10 1Q/11 2Q/11 Unplanned scrams 1.0 1.0 0
0 0
0 0
0 Critical hours 1518.6 2059.7 2159.0 2184.0 2208.0 2209.0 2159.0 40.6 Indicator value 4.2 5.2 4.1 1.8 0.8 0
0 0
Licensee Comments: none 9/27/2011 1:41 PM