ML11271A059
| ML11271A059 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/26/2011 |
| From: | Griffith S Exelon Generation Co, Exelon Nuclear |
| To: | Collins M Document Control Desk, Office of Information Services |
| References | |
| Download: ML11271A059 (3) | |
Text
Nuclear SAFEGUARDS INFORMATION 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)
September 26, 2011 U.S. Nuclear Regulatory Commission Document Control Desk ATT: Mike Collins Washington, D.C. 20555-0001 Peach Bottom Atomic Power Station, Unit l Facility Operating License No. DPR-44 and DPR-56 NRC Docket No. 50-277 and 50-278
Subject:
Figures 1, 2, 3, and 4 to be attached to:
Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 11 Station Security forwarded Revision 11 of the Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program to the Document Control Desk via FedEx on September 23, 2011. This transmittal did not include the Figures as attachments.
Please attach Figures 1, 2, 3, and 4 in this package to the Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 11.
I sincerely apologize for any inconvience and appreciate your attention to correct my mistake.
If you have any questions or require additional information, please contact Shelly Griffith at 717-456-3025.
Respectfully, Shelly
. Griffith Manager, Site Security Operations Peach Bottom Atomic Power Station Exelon Generation Company, LLC SAFEGUARDS INFORMATION ATTACHMENT I CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
SAFEGUARDS INFORMATION Attachments:
Figure 1, OVBS (Contains Safeguards Information)
Figure 2, IVBS Plan (Contains.Safeguards Information)
Figure 3, Checkpoint Layout (Contains Safeguards Information)
Figure 4, ISFSI (Contains Safeguards Information)
SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED
SAFEGUARDS INFORMATION ATTACHMENTS Peach Bottom Atomic Power Station, Unit 1 Docket No. 50-277 and 50-278 Figure 1, OVBS Figure 2, IVBS Plan Figure 3, Checkpoint Layout Figure 4, ISFSI The above Figures are to be attached to the Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 11.
SAFEGUARDS INFORMATION ATTACHMENT 1 CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS DECONTROLLED