George H. Gellrich Vice President Calvert Cliffs Nuclear Power Plant, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax CENG a joint venture of Constellation

"-'eDF Energy0 CALVERT CLIFFS NUCLEAR POWER PLANT September 8, 2011 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation, Docket No. 72-8 (50-317/50-318)

Updated Safety Analysis Report, Revision 20 In accordance with the requirements of 10 CFR 72.70, Calvert Cliffs Nuclear Power Plant, LLC hereby submits one copy (CD) of our Calvert Cliffs Independent Spent Fuel Storage Installation Updated Safety Analysis Report, Revision 20.

The List of Effective pages are included. This electronic copy is a complete revision.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

Very truly yours, CERTIFICATION:

I, George H. Gellrich, certify that I am Vice President-Calvert Cliffs Nuclear Power Plant, LLC, and that the information contained in this submittal accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.

GHG/BJD/bjd

Enclosure:

Updated Safety Analysis Report, Revision 20 (CD) vi

Document Control Desk September 8, 2011 Page 2 cc:

V. Ordaz, NMSS (Without Enclosure)