Email from M. Dries, Entergy, Subj: FW: RCP Motors W/Truncated Flow Chamber Modification
ML11258A132
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/10/2010
From: Dries M
- No Known Affiliation
To: Michelle Catts
Reactor Projects Branch 2
References
FOIA/PA-2011-0272
Download: ML11258A132 (2)


Text

Page I of 2 Catts, Michelle From:

Dries, Michael Sent:

Friday, September 10, 2010 5:48 PM To:

Catts, Michelle

Subject:

FW: RCP Motors With Truncated Flow Chamber Modification

Michelle, As a follow up to Rich Burroni's e-mail and my previous e-mail to you, Westinghouse confirmed below our present records and cleared up the mystery about two of the motors. Therefore a total of seven of the eight operating pumps have had the flow chamber modification and the listing is below. Only the motor on RCP-24 and our Iwo spare motors have not been modified.

Mike From: Dries, Michael Sent: Friday, September 10, 2010 4:31 PM To: Burroni, Richard J Cc: Raffaele, Joseph J; Chan, Tat; Hixson, Matthew T

Subject:

FW: RCP Motors With Truncated Flow Chamber Modification

Rich, From my records:

LM-92P152 2S-74P500 1S-76P888 3S-76P888 IS-DO01 25-76P888.

3S-74P500 8/1999 4/2001 11/2002 1/2006 12/2006 11/2007 3/2010 RCP-34 RCP-32 RCP-22 RCP-33 RCP-23 RCP-31 RCP-21 I

Mike From: Hixson, Matthew T [1]

Sent: Friday, September 10, 2010 10:29 AM To: Dries, Michael Cc: Brady, David R.; Harms, Steve R

Subject:

FW: RCP Motors With Truncated Flow Chamber Modification nformation in this record was deleted n accordance with th%, Freedom of Information Ut, exemptions IA-bl 4-The NRC was looking for this.

Could you lend some clarity on unit 2 v unit 3 From: Brady, David R, Sent: Friday, September 10, 2010 9:47 AM To: Harms, Steve R Cc: Hixson, Matthew T; Stickel, Mark M.; Moxie, Jai

'0 oil -11'ml o

Page 2 of 2

Subject:

RCP Motors With Truncated Flow Chamber Modification

Steve, Per your request, the following RCP motors at Indian Point have had the truncated flow chamber modification:

LMV-92P152 2S-74PS00 15761P888 3S-76P888 1S-DO0l 2S-76P888 3S-74P500 8/1999 4/2001 11/2002 1/2006 12/2006 11/2007 3/2010 Please note Indian Point swaps motors between units, thus I do not know present location of motors with respect to the unit it is installed in. The original shop order for unit #2 is 74P5OO and unit #3 is76P888 If you have further questions please let meknow.

regards, d ave David R. Brady Principal Engineer Rotating Equipment Services Westinghouse Electric Company Waltz Mill Facility Madison, PA 15663, USA Phone: +1 (724)722-5639 4ex: +1 (724) 722"5424l.*

EmailT-bradydr@wesrn-ghouse.com Home Page: www.westinghousenuclear.comn 0/1 V/ ()r 1