ML11258A105
Jump to navigation
Jump to search
| ML11258A105 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 03/08/2011 |
| From: | Chan T Entergy Nuclear Operations |
| To: | Michelle Catts NRC Region 1 |
| References | |
| FOIA/PA-2011-0272 | |
| Download: ML11258A105 (1) | |
Text
Cr*tts s: Michelle From:
Chan, Tat Sent:
Tuesday, March 08,.2011.9";14 AM To:
Catts, Michelle Cc:
Anderson, Harry R; Elliott, Kevin P; Chang, Jong E; Irani, Ardesar; Conroy, Patric W; Burroni, Richard J; Orlando, Thomas
Subject:
Require Charging Pump Flow in Support of Appendix R
- Michelle, The required :flow to stabilize the RCS in the Appendix R scenario is 84 GPM as an input to calculation IP-CALC-05-01 034. Excerpt of the input is attached. As for evaluation for CR-tP2-201 1-00716, we are still in the information gathering phase. Please let me know if I can be of further assistance.
Tat