MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Congressional Correspondence
MONTHYEARML12174A2542012-06-19019 June 2012 G20120439/LTR-12-0294/EDATS: SECY-2012-0322 - Ltr. Rep. J. Randy Forbes Constituent Concerns About NRC Practices Regarding the Safety of Nuclear Power Plants - North Anna ML11262A1732011-12-0202 December 2011 G20110646/LTR-11-0510/EDATS: SECY-2011-0492 - Enclosure to Ltr. to Sen. Barbara Boxer from Chairman Jaczko Safety from Threats Posed by Nuclear Facilities Following a Natural Disaster ML11244A1662011-08-26026 August 2011 G20110644/LTR-11-0508/EDATS: SECY-2011-0493 - Ltr. Rep. Edward J. Markey Compliance with Seismic Safety Specifications for North Anna ML11241A0502011-08-24024 August 2011 G20110633/LTR-11-0505/EDATS: SECY-2011-0484 - Rep. Ltr. Edward J. Markey Proper Maintenance of Emergency Diesel and Battery Generators CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 2012-06-19
[Table view] |
Text
EDO Principal Correspondence Control FROM: DUE: 09/14/11 EDO CONTROL: G20110633 DOC DT: 08/24/11 FINAL REPLY:
Representative Edward J. Markey TO:
Chairman Jaczko FOR SIGNATURE OF : ** GRN ** CRC NO: 11-0505 Chairman Jaczko DESC: ROUTING:
Proper Maintenance of Emergency Diesel and Battery Borchardt Generators (EDATS: SECY-2011-0484) Weber Virgilio Ash Mamish OGC/GC DATE: 08/26/11 Leeds, NRR Burns, OGC ASSIGNED TO: CONTACT: Schmidt, OCA EDO Rihm SPECIAL INSTRUCTIONS OR REMARKS:
Please prepare a response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR to provide input to Roger Rihm, OEDO, if required. Roger will coordinate response with OGC and OCA.
/
/7%.. S-c Y-o / 7 -YEZY-6 I
I mm W - a = 5 ::--7¸*
SDATS Number: SECY-201.1-0484 Source: SECY kenr Inorato6 Wssigned To: OEDO OEDO Due Date: 9/14/2011 11:00 PM
)ther Assignees: SECY Due Date: 9/16/2011 11:00 PM 5ubject: Proper Maintenance of Emergency Diesel and Battery Generators
)escription:
XC Routing: NRR; OGC, OCA
,DAMS Accession Numbers - Incoming: NONE Response/Package: NONE thrInformaio 7ross Reference Number: G20110633, LTR- 11-0505 Staff Initiated: NO lelated Task: Recurring Item: NO File Routing: EDATS Agency Lesson Learned: NO OEDO Monthly Report Item: NO formtio kction Type: Letter Priority: Medium Sensitivity: None
'ignature Level: Chairman Jaczko Urgency: N( )
%pprovalLevel: No Approval Required
- )EDO Concurrence: YES
- )CM Concurrence: NO
- )CA Concurrence: NO 5pecial Instructions: Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR o provide input to Roger Rihm, OEDO, if required. Roger will coordinate response with OGC and OCA.
pgumn Infrmaio
)riginator Name: Representative Edward J. Markey Date of Incoming: 8/24/2011 3riginating Organization: Congress Document Received by SECY Date: 8/25/2011
%,ddressee:Chairman Jaczko Date Response Requested by Originator: NONE
- ncoming Task Received: Letter
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Dale Printed: Aug 25, 2011 13:50 PAPER NUMBER: LTR-1 1-0505 LOGGING DATE: 08/25/2011 ACTION OFFICE: EDO AUTHOR: REP Edward Markey AFFILIATION: CONG ADDRESSEE: Gregory Jaczko
SUBJECT:
Concerns emergeny diesel and battery generators ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack LETTER DATE: 08/24/2.011 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES:
FILE LOCATION: ADAMS DATE DUE: 09/16/2011 DATE SIGNED:
EDO -- G20110 6 3 3
COMP:MITTEES EDWARD J. MARKEY 2106 RAYBURN HOUSE OFFICEBUILOING NATURAL RESOURCES 7'1 F, 1AS_'AC'H
)IS'T*IC'f MC E'rT1!; WASHINGTON, DC 2001'0 2!1.7 TE' " (202) 22C -2836 RANKING DEMOCRAT ENERGY AND COMMERCE ~i~e~ o h 1Itb~ae DISTRICT OFFICES:
HOISRE.ST MIAD~rORU. MA I,01f.:
)
C001g(Of1Rtr: 110- 2)1t-*3
- lastjiut~toii, *,2O5l5-2107 R*iAI.C.A MA,, 1,.l,,:
http://tnarkey.house.yov August 24,W201 The Honorable Greg Jaczko Chairman Nuclear Regulatory Commission Rockville Pike r1555 Rockville, MD 20852
Dear Chairman Jaczko:
I write to urge the Commission to include regulatory requirements for the proper maintenance of emergency diesel and battery generators in light of yesterday's earthquake whose epicenter was centered in Mineral, Virginia, about 10 miles from the North Anna nuclear power plant. While most of the plant's emergency diesel generators worked to provide cooling power to the reactor cores and their spent fuel pools when offsite electricity was lost, one diesel generator reportedly failed to operate.
This illustrates a long-standing concern related to the adequacy of maintenance of emergency diesel generators that must be addressed in order to be certain that any loss of external electricity - be it caused by an earthquake, tornado, flood or terrorist attack - does not lead to the same sort of catastrophic meltdowns that occurred in Japan. The Fukushima meltdown was a long-distance warning to the U.S. nuclear industry to bolster its safety systems, including backup power reliability and redundancy. The Virginia earthquake is now our local 911 call to stop delaying the implementation of stricter safety standards.
In May, I released a report entitled "Fukushima Fallout"' that found that "despite decades of reported problems and NRC warnings, a review of NRC documents conducted by the staff of Congressman Edward J. Markey indicates that there have been recurrent and prolonged malfunctions of emergency diesel generators (EDGs) at nuclear power plants in the U.S. In the past eight years there have been at least 69 reports of emergency diesel generator inoperability at 33 nuclear power plants. A total of 48 reactors were affected including 19 failures lasting over two weeks and 6 that lasted longer than a month." A cursory search of NRC event reports 2 that have been submitted since May 2011 found an additional 4 reports, which, when combined with yesterday's failure at North Anna, brings the eight year total to 74.
I httlv.i,"arke*'.housc.*_eidOcs/05-1 2-1.
.I..tt.i.al...ll .l.tf 2 To determine cases of Emergency Diesel Generator inoperability staff used the U.S. NRC Licensee Event Report (LER) Search (https://lersearch.inl.gov). Staff searched between the dates 5/1/2011 and 8/23/2011 using keyword criteria "emergency diesel generators."
As the report also notes, the NRC has twice - in both 19893 and 2007 - warned its licensees regarding diesel generator failures. However, no regulatory requirements have been imposed on licensees to ensure that the generators are properly maintained and operational. I urge the Commission to remedy that as part of its regulatory revisions it plans to take to enhance the ability of reactors to cope with prolonged electricity outages as recommended by the NRC's Near-Term Task Force Report on Fukushima. Having emergency diesel generators and secondary battery generators onsite is not sufficient; the Commission must prescribe and enforce maintenance requirements to ensure that the generators operate as intended.
Thank you very much for your consideration of this important matter. If you have any questions or~concerns, please have your staff contact Dr. Michal Freedhoff of my staff at 202-225-2836.
Sincerely, Edward J. Markey S n.-i/o-oIctos3i-oi/ nto-noi ices!/ 19X9!inSGOO7.html 4 ~