ML112370031

From kanterella
Jump to navigation Jump to search
Letter from Hydroaire Services, Inc. Regarding the Failure of a Pump in the Service Water System for Entergy Palisades
ML112370031
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/17/2011
From: Jung A
HydroAire Services
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML112370031 (3)


Text

)HydraAireINCORPORATED 834 West Madison, Chicago, Illinois 60607-2698 * (312) 738-3000 Fax No.: (312) 738-3226 August 17, 2011 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Part 21 Notification

Dear Sir or Madam:

On 8/10/2011, Entergy Palisades reported to HydroAire the failure of a pump in their service water system (see attached email dated 8/10/11.) The current failure occurred in a threaded line shaft coupling in Palisades' 7C service water pump. The pump coupling was purchased under Entergy Palisades P.O. 10253715 Rev. 03, HydroAire job NQ-5912. (Entergy Cat I.D. 0032069405 1).

This notification is to conform to the requirements of 10 CFR Part 21 and HydroAire PCP 041 Rev. 6.

At this point, the failure cause is not known, however, Palisades and their outside consultants are currently performing the root cause analysis (RCA). HydroAire has been requested by Entergy Palisades to not participate in the RCA currently underway.

This same pump (7C) was documented in HydroAire's December 16, 2009 Part 21 notification to the NRC (attached). While the current line shaft coupling failure appears similar to the 2009 line shaft coupling failure, any correlation between the two can be determined once the current RCA is complete.

Rega*,r -I- t Adam Jung Quality Assurance Specialist HydroAire Services, Inc.

Cc: George Harris

P. Page 1 of 1 Helen Starling From: Nick Dagres Sent: Wednesday, August 10, 2011 12:40 PM To: Dibu Chowdhury Cc: Don Spencer; Dr. Ravi; Faisal Salman; Dave Wright; George Harris; Adam Jung; Sesha Giri; Madhav Durge; Michelle Carrera

Subject:

RE: Palisades Failure - Update To all It was a coupling failure (2 nd one down from the top) on the same pump that failed in Oct 2009.

We held a conference call with Palisades at 10:00 am CST (Brian Kemp, Tim Zouba spelling?, John Kasishke).

Nick From: Nick Dagres Sent: Wednesday, August 10, 2011 8:32 AM To: Dibu Chowdhury Cc: Don Spencer; Dr. Ravi; Faisal Salman; Dave Wright; George Harris; Adam Jung; Sesha Giri; Madhav Durge

Subject:

Palisades Failure - Update Dibu Update from Palisades as of 7:45 am on 8/10/11:

They do not have a cause of failure as of yet Location at plant - P7C Pump that is in that position - HydroAire job NC-5912 Palisades PO 10253715 (This was the same pump that failed where we supplied new parts back in October 2009)

Palisades is in the process of removing the motor and head this morning.

Upon instructions from Palisades (John Kasishke), the new service water pump (NQ-5940) shipped out late last night from Chicago and arrived at the station at 4:00 am. Palisades QA and engineering are in the process of receiving the new service water pump and documentation.

Nick 8/17/2011

O HydroA ire Service Incorporated 834 West Madison, Chicago, Illinois 60607-2698 (312) 738-3000 Fax No.: (312) 738-3226 December 16, 2009 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001

Subject:

Part 21 Notification

Dear Sir or Madam,

Palisades of Entergy on 9/29/09 reported to us the failure of a pump in their service water system. This notification, although it is late, is to conform to the requirements of 10 CFR Part 21 and our PCP 041 Rev. 2. Attached are the details of the failure as reported in Entergy Corrective Action Request LO-CAR-2009-00103.

Regards, SeNGirl Quality Assurance Manager fall-loq HydroAire Services, Inc.

Cc: George Harris