August 19, 2011
David J. Bannister, Vice President
and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4
P.O. Box 550
Fort Calhoun, NE 68023-0550
SUBJECT:
RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT
Dear Mr. Bannister
Thank you for your letter dated August 17, 2011, in response to our July 18, 2011, letter and
Notice of Violation (ML111881131) concerning the failure of Omaha Public Power District to
assure that the cause of a significant condition adverse to quality was determined and corrective
actions to preclude repetition of the condition for the reactor trip contactors in the reactor
protection system were taken. We have reviewed your reply and find it responsive to the
concerns raised in our Notice of Violation. We will review the implementation of your corrective
actions during a future inspection to determine that full compliance has been achieved and will
be maintained.
Sincerely,
/RA/
James F. Drake, Chief
Project Branch E
Division of Reactor Projects
Docket No. 50-285
License No. DPR-40
Enclosure:
Fort Calhoun Station Inspection/Activity Plan
cc: Distribution via ListServ
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Omaha Public Power District
- 2 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Jeff.Clark@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Acting Branch Chief, DRP/E (James.Drake@nrc.gov)
Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
FCS Administrative Assistant (Berni.Madison@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Randy.Hall@nrc.gov)
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
NOED Resource (NOED.Resource@nrc.gov)
OE Web Resource (OEWEB.Resource@nrc.gov)
DRS/TSB STA (Loretta.Williams@nrc.gov)
OEDO RIV Coordinator (John.McHale@nrc.gov)
NRR DORL Director (Joseph.Giitter@nrc.gov)
Director, Office of Enforcement (Roy.Zimmermon@nrc.gov)
NRR/DORL/Plant Licensing Branch IV-1 Chief (Michael.Markley@nrc.gov)
NRR/DORL Deputy Director (Louise.Lund@nrc.gov)
R:\\_REACTORS\\_FCS\\2011\\FCS RESPONSE TO NOV 201101.DOCX ML112312266
ADAMS: No Yes
SUNSI Review Complete
Reviewer Initials: JD
Publicly Available
Non-Sensitive
.
Non-publicly Available
Sensitive
C:DRP/PBE
C:DRP/PBE
RAzua
JDrake
/RA/
/RA/
8/19/11
8/19/11
OFFICIAL RECORD COPY T=Telephone
E=E-mail F=Fax