AEP-NRC-2011-58, Correction to 60-Day Response to Bulletin 2011-01, Mitigating Strategies

From kanterella
(Redirected from ML11229A805)
Jump to navigation Jump to search

Correction to 60-Day Response to Bulletin 2011-01, Mitigating Strategies
ML11229A805
Person / Time
Site: Cook  
Issue date: 08/05/2011
From: Gebbie J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2011-58
Download: ML11229A805 (3)


Text

INDIANA MICHIGAN POWER9 A unit of American Electric Power Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 AERcom August 5, 2011 AEP-NRC-2011-58 10 CFR 50.90 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

References:

Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Correction to 60-Day Response to Bulletin 2011-01, Mitigating Strategies

1) Letter from J. P. Gebbie, Indiana Michigan Power Company, to U. S. Nuclear Regulatory Commission Document Control Desk, "60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies," AEP-NRC-2011-43, dated July 11,2011.
2) Nuclear Regulatory Commission Bulletin 2011-01, Mitigating Strategies, dated May 11,2011.

Dear Sir or Madam:

By Reference 1, Indiana Michigan Power Company transmitted a response to Nuclear Regulatory Commission Bulletin 2011-01, Mitigating Strategies (Reference 2). The purpose of this letter is to correct a transposition error on our answer to question 4.d regarding training for Emergency Response Organization Key Decision Makers.

Our answer should have stated that Severe Accident Mitigation Guidelines training is Triennial, and B.5.b training is Biennial.

.The enclosure to this letter provides an affirmation statement.

There are no new regulatory commitments made in this letter.

Should you have any. questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.

Sincerely, Joel P. Gebbie Site Vice President JEN/jen

Enclosure:

Affirmation jl-ic0 pzk~I

U. S. Nuclear Regulatory Commission AEP-NRC-2011-58 Page 2 c

J. T. King, MPSC, w/o enclosure S. M. Krawec, AEP Ft. Wayne, w/o enclosure MDEQ-WHMD/RPS, w/o enclosure NRC Resident Inspector M. A. Satorius, NRC Region III P. S. Tam, NRC Washington DC

Enclosure to AEP-NRC-2011-58 AFFIRMATION I, Joel P. Gebbie, being duly sworn, state that I am Site Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

Indiana Michigan Power Company Joel P. Gebbie Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME My Commission Expires,,,.nxuxr j 0l a3\\