Requalification Program Inspection - Pilgrim Nuclear Power Station
ML112270121
Person / Time
Site: Pilgrim
Issue date: 08/15/2011
From: Diane Jackson
Operations Branch I
To: Rich Smith
Entergy Nuclear Operations
Shared Package
ML110030682 List:
References
Download: ML112270121 (4)


Text

UNITED STATES NUCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSlA. PA 19406-1415 August 15, 2011 Robert G. Smith Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - PILGRIM NUCLEAR POWER STATION

Dear Mr. Smith:

ln a telephone conversation on August 10,2011, Mr. John Caruso, Senior Operations Engineer, and Mr. Randy Haislet, Assistant Operations Manager for Training, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Piigrim Nuclear Power Station facility. The inspection is planned for the week of October 3,2Q11, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by September 19,2011-Mr. Haisiet has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1gg5 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic

R. Smith 2 mailto INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. John Caruso at (610) 337-5389.

Donald E.

Operations Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35 cc: Distribution via ListServ

R. Smith 2 mailto INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of lnformation and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.oov/readinq-rm/adams.html(The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. John Caruso at (610) 337-5389.

Sincerely,

/RN Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-293 License No. DPR-35 cc: Distribution via ListServ DISTRIBUTION: See next page SUNSI Review Complete: JGC (Reviewer's Initials)

ADAMS PKG: MLl10030682 ADAMS NO.: MLl12270121 DOCU ME NT NAM E : G :\DRS\Operations Branch\CARUSO\Req ual FY1 2-P I L Octl 1\60dayrpi.doc After declarino this document "An Offlclal will be released to the Public.

Record" it w OFFICE RI/DRS/OB RI/DRSiOB NAME JCaruso/JGC DJackson/DEJ DATE 08112111 08/1 s/1 1 OFFICIAL RECORD COPY

R. Smith 3 Distribution:

W. Dean, RA (RIORAMAIL RESOURCE)

D. Lew, DRA (RIORAMAIL RESOURCE)

D. Roberts, DRP (RIDRPMAIL RESOURCE)

J. Clifford, DRP (RIDRPMAIL RESOURCE)

C. Miller, DRS (RIDRSMAIL RESOURCE)

P. Wilson, DRS (RIDRSMAlL RESOURCE)

J. McHale, Rl OEDO R. Bellamy, DRP T. Setzer, DRP D. Dodson, DRP E. Keighley, DRP M. Schneider, DRP, SRI B. Smith, DRP, Rl S. Campbell, Resident OA D. Bearde, DRS RidsNrrPMPilgrim Resource RidsNrrDorlLPLl -1 Resource J. Caruso, DRS Examiner, DRS L. Vick, NRR/ADRO/DIRS/IOLB D. Jackson, DRS Operations Branch Chief C. Bixler, DRS (OL Facility File)